Page 1 of 3
CCSL Variance Petition Application (07/2019)
City of Marco Island
Growth Management Department
50 Bald Eagle Drive
Marco Island, FL 34145
Phone: 239-389-5000
COASTAL CONSTRUCTION SETBACK LINE VARIANCE PETITION
Applicable Sections of the Marco Island Land Development Code Sec. Article XI Section 30-751 Coastal
construction setback line variance and Section 30-755 Variances
Petition number: CCCL- Date Received:
Planner:
ABOVE TO BE COMPLETED BY STAFF
PROPERTY INFORMATION
Property Owner(s):
Owner’s Address:
Phone Number: Email:
APPLICANT INFORMATION
Applicant’s Name:
Applicant’s Address:
Phone Number: Email:
SITE INFORMATION
Address: Property ID #:
Subdivision: Block: Lot(s):
Present Zoning: Present Use:
Proposed Construction/Activity:
PF-12
Page 2 of 3
CCSL Variance Petition Application (07/2019)
CRITERIA USED TO REVIEW VARIANCE REQUEST.
PROVIDE WRITTEN JUSTIFICATION USING THE BELOW CRITERIA:
(1) If in the immediate contiguous or adjacent area a "number of existing structures"
have established a reasonably continuous and uniform construction line closer to the line
of mean high water than the line as herein established, and if said existing structures
have not been unduly affected by erosion, a proposed structure may be permitted
along such line if such proposed structure is also approved by the board of zoning
appeals.
(2) Certain activities that may temporarily alter ground elevations such as artificial beach
nourishment projects, excavation or maintenance dredging of inlet channels may be
permitted seaward of the coastal construction setback line if said activity is in
compliance with the city comprehensive plan, conservation and coastal management
element, and also approved by the board of zoning appeals.
(3) Rendering a decision, the petitioner shall provide the board with a current, written
opinion from the state department of environmental protection as to the advisability of
granting the relief sought.
Page 3 of 3
CCSL Variance Petition Application (07/2019)
CCCL VARIANCE PETITION
APPLICATION SUBMITTAL CHECKLIST
This completed checklist is to be submitted with application packet
REQUIREMENTS
# OF COPIES REQUIRED
Completed Application
1
Site Plan illustrating all of the following:
a. All lot dimensions
b. All existing structures and their exact yard
setback distances
c. The existing Coastal Construction Control Line
(as established by State Law) measured from
the mean high-water line and vegetation line
d. The requested Coastal Construction Control
Line measured from the mean high-water line
and vegetation line
e. The distance between the existing Coastal
Construction Control Line (as established by
State Law) and the Coastal Construction
Control Line requested in this petition
f. The location of all existing structures and their
exact distance from the Coastal Construction
Control Line established by State Law for all
structures which are being used to justify your
petition
g. The location of all proposed structures in
relation to the existing Coastal Construction
Control Line (as established by State Law) and
the Coastal Construction Control Line
requested in this petition
1
(please include 1digital copy of site
plan and all other documentation)
Application fee, check shall be made
payable to “The City of Marco Island” in the amount
of $1,000.00
As the authorized agent/applicant for this petition, I attest that all of the information indicated on
this checklist is included in this submittal package. I understand that failure to include all
necessary submittal information may result in the delay of processing this petition.
__________________________________________ ________________________________________
Signature of Applicant or Agent Date