PROJECT ADDRESS: _____________________________________________________________________________
PROJECT NAME: _________________________________________________________________________________
Other Potential Plan Submittals Required For A Project?
Petition for Variance – Submit form SBD-9890
Erosion control & stormwater management under SPS 306
Plumbing and private sewage systems under chapters SPS 381-385
Boiler & pressure vessels under SPS 341
Elevators or Escalators under chapter SPS 318
Mechanical Refrigeration under SPS 345
Swimming Pools or other Aquatic Centers within a Commercial/Public
Facility under chapter SPS 390
There is no state electrical review under chapter SPS 316
Tank storage of 5,000 gallons or more of flammable or combustible liquids
under chapter SPS 310
Contact the Building Department for individual submittal requirements for all of the above.
Department of Health enforces Building Code Requirements, including Plan Review, for Hospitals and Nursing Homes. Daycare facilities must meet building codes
prior to their licensing.
For licensing of Hotels, Motels, Restaurants, Pools, Campgrounds and Bed & Breakfast establishments contact the WI Environmental Sanitation Section at (608) 266-2835.
The Wisconsin Permit Center at 1-800-435- 7287 may be able to help you with other state permit requirements.
Type of Submittal Requested (check all that
apply)
New
Alteration – Level: 1 2 3
Addition/Alteration–Level: 1 2 3
Approval Extension
Revision
Footing & Foundation Plans Only
Permission to Start
Follow Up of a Denial Within 8 Months
Preliminary Consultation (contact reviewer before
scheduling or submitting)
Structural Framework – Shell Only
Multiple Identical Buildings (see box 5)
Number of Buildings ___________
Occupancy Type Additional Non-Accessory
Major Use – Check Use with Occupancies – Check All
the Greatest Floor Area that Apply )
A Assembly A1 A2 A3 A4 A5
B Business/Office B
E Educational E
F Factory/Industrial F1 F2
H Hazardous H1 H2 H3 H4 H5
I Institutional/Daycare/CBRF I1 I2 I3 I4
M Mercantile/Retail M
R Residential R1 R2 R3 R4
S Storage S1 S2
U Utility/Misc U
Atrium located in any type of occupancy
Construction Information
Construction Class – Check One
IA IB IIA IIB IIIA IIIB IV VA VB
Area (project area, include all levels):_______________ sq ft
Number of Floor Levels ____________
Total Building Volume is less than 50,000 Cu. Ft.
Yes No
Seismic Review Threshold (circle one)
B-F and greater than 1 story A or 1 story
Non-Structural Alteration
Objects Submitted for Review as Current Review
(check all that apply)
Building
HVAC
Lighting & Emergency Egress
Fire Suppression (see box 7)
Fire Detection/Alarm (see box 7)
Other Projects (Stand Alone from above)
Bleacher
Canopy
Kitchen Exhaust Hood
Membrane Construction
Rack Supported Storage Building
Elevated Pedestrian Access
Structural Component Plan(s) which accompany
this current plan submittal (check all that apply):
Roof Truss Metal Bldg
Floor Truss Fire Escape
Steel Girder Precast Plank
Laminated Wood Precast Wall
Fire suppression and alarm plans are required for certain occupancies. See building approval letter or contact us for requirements. When required, the plans
for fire sprinkler, fire detection, and fire alarm must be submitted to the Building Department. The Building Department will then foreword to the Fire
Department agent for review.
FIRE ALARM
Installation Has Begun
Complete Partial None
Type: Automatic Detection Manual Alarm
Monitoring Type:
Central Station Proprietary Supervision
Remote Supervision Protected Premises
FIRE SUPPRESSION
Installation Has Begun
Less Than 21 sprinklers
Complete Partial None
Type: Wet Dry Pre-action/Deluge
Anti-Freeze Manual Wet
NFPA Fire Suppression Standards used
11 11A 12 13 13R
14 15 16 17 17R
17A 20 24 750