CITY OF KILLEEN
PUBLIC WORKS - ENGINEERING DIVISION
RIGHT-OF-WAY (ROW) CONSTRUCTION PERMIT APPLICATION
CITY OF KILLEEN PUBLIC WORKS ENGINEERING SEPTEMBER 2018
R
IGHT-OF-WAY (ROW) CONSTRUCTION PERMIT APPLICATION VERSION 2.3
TO BE COMPLETED BY APPLICANT
ApplicantName: Owner Contractor
Applicant’sAddress:
Contractor:
Applicant’sPhoneNumber:
ProjectAddress:
TypeofROWConstruction:(CheckAllThatApply)
StreetCut CurbCut Sidewalk
NetworkNode UtilityPole
Trans.Facility
#ofnodes_____ #ofpoles_____ #nodesserv’d___
Others
TO BE COMPLETED BY PUBLIC WORKS DEPARTMENT OK, N/A, or Note Correction?
1. ProjectDescription?

2. PlotPlanSubmitted?

3. AdjoiningROWandEasementsIdentified?
4. AdjoiningPropertiesIdentified?
5. ExistingStreetCutLocationsonPlotPlan?
6. ExistingSidewalkandDrivewayLocationsonPlotPlan?
7. AllPertinentDimensionsonPlotPlan?
8. RequiredDocumentation(i.e.serviceagree.,cert.ofauthority,etc.)
9. DocumentreviewbyPWAttorney?
10. ROWConstructionPermitRequired?
1.ThereversesideofthissheetmaybeusedtoprovidekeydetailsnotshownonthePlotPlan.
2.ContractoristocontactthePublicWorksDepartmentat(254)6163172,atleast48hours,beforeconstructionwithintheright
ofway.APublicWorksDepartmentInspectormustfield
verifythelocationofconstructionwithintherightofwaybeforetheROW
isdisruptedandmustapproveallnewconstructionwithintheROW.
3.Inspections/reinspectionsmustbesubmittedviaClick2GovORBuildingInspectionHotline(2545017766).Allapplicable
responsetimeframesapplydependingoninspectionnotificationmediumutilized.
4.Administrativecompleteness:Nodes/Poles30days,TransportFacility10days,allothersapprox.10businessdays.
(SignatureofApplicant)
(Date)
ApprovedforConstruction:(PUBLICWORKSUSEONLY)
CityEngineer Date
ROWInspection:Approved/Disapproved
PublicWorksInspector Date
Save
Print