Building Plan Submission Form (08/17/2020) Page 3 of 5
A fee of $350 must accompany one set of house plans submitted for review. This set of plans
will be retained for future use. Plans need to be sent to Crystal Bay Homeowners Association at
P. O. Box 428, Cross Hill, SC 29332. NOTE: Plan Package must include a completed Plan
Submission Form, one full set of the proposed house plans, (including elevations, floor plans
and roof pitch), site plan, to scale, showing house placement including distances from property
lines, driveways, walkways, septic and well placement, and a landscaping plan showing plants,
shrubs, decks, fencing, etc. Materials and colors used for the exterior of the above must be
approved.
CHECK # _____________ DATE:___________ PAID BY: ____________________________
It is a requirement that you, and your builder, provide protection for the Crystal Bay roads and
road shoulders. Installation of shoulder barrier at the roadway in front of the lot to protect the
road shoulders during construction must be installed. You must also provide and maintain a
construction driveway that is substantial and will protect the roads and shoulders from damage
and excessive mud and clay.
A check from the Builder or Owner, made payable to the Crystal Bay Homeowners Association
in the amount of $1,500. is required for the Road Bond. Five hundred dollars ($500.) of this
amount is refundable upon completion of the home construction, if road pavement and road
shoulders near and in front of the subject lot are maintained throughout the construction
process, and are in the same good condition as when construction began (and in addition to
other conditions as outlined below).
CHECK# _____________ DATE:__________ PAID BY: ______________________________
It is a requirement that you, and your builder, have read and understand the policies regarding
clearing and tree removal. No trees greater than six inches (6”) at the base may be removed
without prior approval by the Architectural Review Committee other than those trees within
the building site and an area not to exceed twenty feet (20’) from the exterior of the building.
Those trees located in the driveway area and septic leach field may also be removed.
A check from the Builder or Owner, made payable to the Crystal Bay Homeowners Association,
in the amount of $1,000. is required for the Land Clearing/Tree Bond. This amount is refundable
if the Covenants regarding tree removal are adhered to (penalty is loss of Bond, plus a $l,000.
fine, plus $250. per tree for each unauthorized tree removed).
CHECK# ______________ DATE:_________ PAID BY: ______________________________
NOTES:
No clearing, earthmoving or construction of any nature should be done that could damage the
approved septic and repair area. Check with the county health department prior to any
construction.
The property owner is responsible for placing and maintaining a stone driveway to facilitate the
delivery and distribution of building materials at a centralized staging area on the subject lot.