Crystal Bay Homeowner Association
Home Construction, Lot Improvements,
and Appearance Guidelines
August 17, 2020
i
Table of Contents
Contents
Section 1. Introduction ......................................................................................1
Section 2. The Architectural Review Committee (ARC) ......................................1
2.01 Purpose ...................................................................................................1
2.02 Composition ............................................................................................1
2.03 Decision-making. .....................................................................................1
2.04 Approvals.................................................................................................1
2.05 Enforcement and Penalties ......................................................................2
Section 3. New Home Construction ...................................................................2
3.01 Requirements and Restrictions ................................................................2
3.02 Initial Meeting with the ARC ....................................................................6
3.03 Building Plan Submission .........................................................................6
3.04 Plan Review and Approval .......................................................................8
3.05 Construction ............................................................................................9
3.06 Post-Construction .................................................................................. 11
Section 4. Lot Improvements ........................................................................... 12
4.01 Requests and Approval. ......................................................................... 12
4.02 House Exterior ....................................................................................... 13
4.03 Tree Removal......................................................................................... 14
4.04 Outbuildings. ......................................................................................... 14
4.05 Fencing .................................................................................................. 14
4.06 Pools ...................................................................................................... 14
4.07 Hardscape .............................................................................................. 14
4.08 Docks and Seawall ................................................................................. 15
Section 5. Other Standards .............................................................................. 15
5.01 Mailboxes .............................................................................................. 15
5.02 Trash Containers. ................................................................................... 15
5.03 Clotheslines ........................................................................................... 15
ii
5.04
External Antennas and Satellite Dishes .................................................. 15
5.05 Signage. ................................................................................................. 15
Section 6. Maintenance and Appearance ......................................................... 16
6.01 Undeveloped Lots .................................................................................. 16
6.02 Boats, Trailers, Large Trucks, and Heavy Equipment. ............................. 16
6.03 Landscaping ........................................................................................... 16
6.04 Structures .............................................................................................. 16
6.05 Driveways .............................................................................................. 16
6.06 Animals .................................................................................................. 16
Section 7. Revisions ......................................................................................... 17
Enclosures
1 Plan Submission Form ...................................................................................... 1-5
2 Pre-Construction Site Work ..................................................................................1
3 Mailbox Design Guidelines ...................................................................................1
4 For Sale Sign Guidelines .......................................................................................1
Crystal Bay Homeowner Association Home Construction, Lot
Improvements, and Appearance Guidelines
Section 1. Introduction. These guidelines help ensure that new construction or
other lot improvements will blend with our neighborhood values and maintain a
“good neighbor” atmosphere. By requiring lot owners to provide the Architectural
Review Committee (ARC) a set of proposed plans and other information up front
for review, the ARC can identify potential issues and consider alternatives before
any work is begun.
Section 2. The Architectural Review Committee (ARC)
2.01. Purpose. The ARC protects the interest of the Crystal Bay Homeowner
Association (HOA) and individual lot owners by ensuring adherence to the
provisions of the Declaration of Covenants, Conditions and Restrictions of Crystal
Bay Subdivision, the
Declaration of Restrictive Covenants of Crystal Bay Subdivision
and these guidelines regarding the improvement and maintenance of member-
owned lots within the community. It accomplishes its purpose by reviewing and
approving all lot improvement plans, overseeing the implementation of the plans,
and monitoring the community’s adherence to provisions and maintenance of its
aesthetics
i
.
2.02. Composition.
a. The ARC shall consist of three members, including the Chairperson. The
Chairperson shall be a member of and chosen among the Crystal Bay HOA
Board of Directors (BOD). Committee members must be approved by the
BOD
ii
.
b. In the event a committee member is recused or unavailable to review a
building plan, a member of the BOD may serve as a temporary replacement.
2.03. Decision-making
a. Each ARC member shall have one vote in all decisions made by the
committee.
b. Decisions will be made by a majority vote of the committee members.
c. ARC decisions are wholly separate from and independent of the BOD.
2.04. Approvals
a. The plan or request review process may take up to thirty (30) days, and you
will receive written notice of approval, requests for additional information,
suggestions for changes, or rejection.
Crystal Bay Homeowner Association Home Construction, Lot Improvements,
and Appearance Guidelines
2
b. All approvals (or denials) will be conveyed via letter or email and be signed
by two (2) Members of the ARC.
c. ARC decisions may be appealed in writing to the BOD.
2.05. Enforcement and Penalties.
a. Enforcement of these guidelines shall be by proceedings at law or in equity
against the person or persons violating or attempting to violate any
provisions, either by restrain violation or to recover damages. In the event it
is necessary to enforce these guidelines by appropriate legal or equitable
proceedings, the party or parties violating or attempting to violate the same
shall be liable for the cost of such proceedings including reasonable
attorneys’ fee.
b. The ARC makes recommendations on enforcement and penalties for
noncompliance with these guidelines and the HOA covenants to the BOD to
carry out and enforce
iii
, including:
Withholding tree and road bonds,
Additional fees and fines,
Placing liens on the lot,
Undoing the noncompliant improvement.
Section 3. New Home Construction
3.01. Requirements and Restrictions
a. South Carolina and Laurens County. Plans and construction shall comply
with all state and county laws, regulations, codes, permit conditions, and
ordinances.
b. Crystal Bay Homeowners Association. Plans and construction shall comply
with the Declaration of Covenants, Conditions, and Restrictions of Crystal
Bay Subdivision, Declaration of Restrictive Covenants of Crystal Bay
Subdivision, and these guidelines, including
Lots shall be used for residential purposes only, and no structures shall
be erected, placed, altered, or permitted to remain on any lot other than
one detached, single family dwelling and related structures incidental to
residential use of the lot, such as garages and boat houses which otherwise
comply with these restrictions
iv
.
Construction of new residential buildings only shall be permitted, it being
the intent to prohibit the moving of any existing building or portion thereof
Crystal Bay Homeowner Association Home Construction, Lot Improvements,
and Appearance Guidelines
3
on to a lot and remodeling or converting the same into a dwelling unit in
this subdivision
v
.
More than one lot (with the same owner) may be combined to form one
or more lots with written consent of the BOD. Upon combination of the
lots, the building line requirements prescribed in paragraph 3.01.b.(9)
below shall apply. The resulting building site and structures erected must
otherwise comply with these restrictions and the new property line of the
site shall be used to compute the setback lines
vi
.
The use of a single-family dwelling within Crystal Bay as a vacation rental
home is inconsistent with the plain language of the restrictive covenants
that expressly limit the use of property to residential purposes and is
therefore prohibited. Use of a single-family dwelling as a vacation rental
home would constitute a commercial-type operation. This provision does
not exclude the rental of any single-family dwelling for residential
purposes
vii
.
No trailer, truck, van, mobile home, tent, camper, barn, garage or other
outbuilding or temporary structure parked or erected on lots shall at any
time be used as a residence, temporarily or permanently, nor shall any
structure of a temporary character be used as a residence. Modular homes
are permissible if approved by the ARC
viii
.
House Size
ix
(a) Waterfront Lots. Each single-family dwelling on the waterfront shall
have an enclosed, heated living area (exclusive of open porches,
garages, and other unheated spaces) not less than One Thousand
Eight Hundred (1800) square feet, regardless of the number of
stories. A minimum of 1,400 square feet must be above ground.
(b) Water access/off-water access/off-water lots. Each single-family
dwelling not on the waterfront shall have One Thousand Five
Hundred Fifty (1550) square feet, regardless of the number of
stories. A minimum of 1,200 square feet must be above ground.
(c) Garage Size. All building plans are to include a minimum 480 square
feet two (2) car garage.
Exterior
(a) The ARC has the responsibility to ensure that the community have a
consistent streetscape and quality of design (façade, material, etc.).
Crystal Bay Homeowner Association Home Construction, Lot Improvements,
and Appearance Guidelines
4
(b) In order to maintain a “planned look” for the community and
preserve the aesthetic integrity of the community, the ARC may at
times place a temporary moratorium on any particular style of design
until the community is brought back into balance. This would rarely
be the case, but the ARC reserves the right to reject any house plans
not acceptable to this provision.
(c) For waterfront lots, homeowners planning to have the (normally)
home front face the lake must make architectural enhancements to
the street side of the home to present an aesthetically acceptable
streetscape, or curb appeal from the road and neighboring
properties.
(d) Solid brick, stone-covered block, stucco covered, or other similar
finish foundations are required. Asbestos shingles, aluminum siding,
imitation brick or stone-roll siding, exposed concrete and concrete
block, imitation asphalt brick siding, imitation asphalt stone siding,
tar paper are prohibited
x
.
Roof
(a) The roof pitch over the main structure should be no less than 8/12
with no less than a 12” overhang.
(b) Architectural shingles are required unless substitute materials are
otherwise approved.
House Location. To the extent practical and within the bounds of the
setback requirements, the house should be centered between the side
property lines and align as much as possible with houses on the adjacent
properties.
(a) Setbacks
xi
. All structures shall meet the setback requirements as set
forth in the recorded plat, deed restrictions, homeowners
association documentation and governmental regulations and
guidelines.
1 Street. 50 feet from the street
2 Side. 10 feet from side property lines, except they shall be at
least 20 feet from the side of the property line abutting a side street.
3 Lake. 50 feet along the 440-foot elevation contour line.
(b) Easements
xii
. 10 feet along the lot lines of all lots, except 20 feet
along rear property lines for all lots that do not adjoin other lots or
properties within Crystal Bay, for installation, repair, replacement, and
Crystal Bay Homeowner Association Home Construction, Lot Improvements,
and Appearance Guidelines
5
maintenance of utilities, including the right to keep said easements free
and clear of all obstructions.
(c) Deviations and Variances
1 The ARC may approve deviations from the setback requirements
upon written application of an individual lot owner if, for reasons
of topography or well or septic approvals, strict compliance
creates a hardship
xiii
. Any approved deviations shall be specified
in the final approval letter from the ARC (paragraph 3.04(d)).
2 Application must describe in detail the specific reasons and
hardship for any requested deviations from the requirement and
restrictions in paragraph 3.01(b), as well as demonstrate that no
other viable alternatives (meeting setback requirements) exist.
3 ARC will solicit input from other lot owners and will obtain
written agreement from the adjacent property owners before
approving any deviations from the requirements.
Driveways. All driveways and driveway extensions must be finished in
concrete, asphalt, pavers, or other suitable and approved material. Shared
driveways are discouraged, special exceptions will be reviewed based on
the best interest of the community.
Tree removal.
(a) Except within the building site or within 20 feet of the main dwelling,
no trees of any kind in excess of 6 inches in diameter at ground level
may be removed from any lot without prior approval of the ARC
xivxv
.
Removal of trees is also normally authorized for the driveway, the
septic leach field, and any tree less than 6 inches in diameter. Any
additional trees must be specifically authorized by the ARC
(paragraph 3.04.c.(3)). The ARC decision to deny tree removal should
be based upon the need to maintain the planned natural look of the
community.
(b) Clearcutting is strictly prohibited. For purposes of these guidelines,
clearcutting occurs when most or all trees on a lot or a significant
portion of a lot are uniformly cut down.
(c) A land clearing/tree bond is required (paragraph (3.03.a.(3)).
(d) The penalty for unauthorized tree removal is loss of bond and a fine
of $1,000, plus $250 per unauthorized tree removed.
Preconstruction photographs submitted with the building plans will
Crystal Bay Homeowner Association Home Construction, Lot Improvements,
and Appearance Guidelines
6
be used to determine the number of unauthorized trees removed.
Drainage. The Rule of Law in South Carolina is a landowner may,
consistent county and state regulations, reroute water in any fashion he
desires within the boundary of his property, provided that he continues to
allow water that has been entering the property to continue to enter in the
same location and quantities, and also provided that he continues to allow
the water to exit in the same location and in approximately the same
quantities as prior to the modifications. In the event of any impact to
adjacent properties, including the lake; affected property owners,
Greenwood Lake Management must provide written agreement. Lot
owners must take all necessary actions to prevent soil runoff into the lake
via the drainage.
3.02. Initial Meeting with the ARC. An initial meeting with the ARC is required
prior to the submission of plans and any site work to assure a complete
understanding of all requirements and lot owner’s desires and needs.
3.03. Building Plan Submission
a. Fees and Bonds.
Plan Review Fee. A fee of $350 (check made payable to the Crystal Bay
Homeowners Association) is to accompany one (1) full set of building plans
submitted for review. If, after obtaining approval, you change the
configuration of the original submitted plans, you must submit the new or
revised plans for ARC review. No additional review fee is required.
Road Bond. A $1,500 Road Bond is required when the house plans are
submitted; $500 of which is subject to refund if no damage to the roads
and road shoulders has occurred during the pre-construction and
construction process and the condition of the road and shoulders are the
same as they were prior to the commencement of clearing and building.
Lot owners are responsible for the cost of all repair of damage done to
roads and/or road shoulders. The cost of such repair can easily exceed
your road bond. While it can be in lot owner’s contract with their builder
requiring the builder place the bonds and be responsible for the actions of
all his contractors and subcontractors, ultimate responsibility for repair
remains with the lot owner.
Tree Bond. A $l,000 Land Clearing/Tree Bond is required when plans are
Crystal Bay Homeowner Association Home Construction, Lot Improvements,
and Appearance Guidelines
7
submitted. This Bond is refundable subject to adherence to the tree
removal provisions (paragraphs 3.01.b.(11) and 3.04.c.(3)).
b. Building Plan Package. A complete (submission form with all attachments)
building plan package, using the plan submission form at Enclosure 1, will be
submitted to the ARC for review and approval before beginning construction
activity. The package may be mailed (Crystal Bay, P.O. Box 428, Cross Hill, SC
29332) or hand carried to the ARC (contact the HOA Secretary for delivery
information). The lot owner and the contractor must read and understand
Pre-Construction Site Work document at Enclosure 2. The following
Information is to be provided with the building plans when submitted:
Name, address, phone number and e-mail address of owner.
Date (month/year) construction is planned to start.
Name, address, phone number and e-mail address of builder or general
contractor.
c. Attachments to the building plans
House Architectural Drawings. One copy (at least 17” x 28”) of a full set
of house plans, including the floor plans (for each floor), roof pitch, and
front, rear, and side elevations.
Exterior Materials. A description, photographs, or samples of all exterior
materials (paint color, siding materials, roofing type/color, etc.) must be
attached to the building plan submission form.
Photographs. Building plan package shall include:
(a) Photographs of the entire road, road shoulders and ditches in front
of the lot and across the street from the lot to show the condition of
the road, road shoulders and ditches prior to clearing or
commencement of any construction.
(b) Several photographs taken from the roadside and several
photographs taken from the approximate center of the lot, facing
toward the rear of the lot or toward the lakeside of the lot and
showing the entire width of the lot’s vegetation and trees.
(c) For waterfront lots, several photographs from the lake side toward
the lot showing the entire width of the lot along the shoreline and of
vegetation and trees.
Lot Survey Diagram. Site plan (drawn to scale) must be submitted
showing location of house, driveway, walkways, well, septic field, repair
Crystal Bay Homeowner Association Home Construction, Lot Improvements,
and Appearance Guidelines
8
area (if applicable), setbacks, and distances from property lines
xvi
.
Landscaping Plan. A diagram showing the planned location of trees and
shrubbery, areas and types of grass and mulch, and hardscape e.g. patios,
outdoor fireplace/pit, walls, etc.
Contractor’s License and Laurens County Building Permit. The lot owner
will provide the ARC a copy of the Contractor’s license and a copy of the
Laurens County Building Permit (as applicable).
3.04. Plan Review and Approval
a. Process. The ARC review and approval of the plans for new home
construction will be accomplished in two steps, house design and lot design.
Both steps must be completed before final approval of the building plans
and lot clearing begins. The ARC must complete its review within 30 days of
receiving the building plans. If no action is taken by the ARC within thirty
(30) days after plans are submitted to it, the owner may proceed to build
without approval
xvii
.
b. House Design.
Review. The ARC will review the building plan submission package to
ensure the house design comports with the requirements in paragraphs
3.01.b.(6)-(8).
Approval. The ARC will notify the lot owner or their representative of
house design approval and schedule the onsite survey.
c. Lot Design. No structure requiring a Laurens County Building Permit may be
placed in violation of the setback requirements of either the County or these
guidelines. The ARC will normally restrict the location of any structure to a
location which respects setback requirements. The fact that the lot owner
has received a “variance” from Laurens County in no way obligates the ARC
to consider that variance in its decision to approve or deny the building plan.
In its decisions, the ARC shall consider all aspects of the structure under
application, taking into consideration the various lines of sight from
neighboring lots, available space, configuration and landscaping of the lot
itself, or other conditions likely to be brought about by the structure which
may limit the neighbors' enjoyment of the overall community landscape.
Lot Design Onsite Survey. Once house design is approved and before
clearing begins, the ARC shall conduct an onsite review to ensure
Crystal Bay Homeowner Association Home Construction, Lot Improvements,
and Appearance Guidelines
9
compliance with the requirements in paragraphs 3.01.b.(9)-(12).
(a) House footprint. Prior to ARC onsite survey, the lot owner or builder
shall stake out the house location on the property to assess compliance
with setback and alignment requirements.
(b) The general “on the ground” locations of the driveway, well,
wastewater system (septic tanks and wastewater infiltration trenches),
other hardscape improvements (e.g. patios, decks, fire pits, etc.) must be
identified.
(c) Tree removal. During the onsite survey, the ARC may authorize
identified and marked (e.g. with tape, ribbon, chalk, paint, etc.) trees for
removal that are in addition to those authorized under the provision in
paragraph 3.01.b.(11).
(d) Drainage. Identify the location of any planned changes to the
drainage within the lot property lines.
Approval. Following the onsite review, the ARC will notify the lot owner
or their representative of lot design approval.
d. Final Approval. Upon completion of the house and lot designs reviews, the
ARC, pursuit to paragraph 2.04, will notify the lot owner or their
representatives of its final approval of the building plan. At which time,
construction activities may commence.
e. Post-Approval Modifications. Once final approval is granted any proposed
changes or modifications to the house or lot design prior to or during
construction must be submitted to and approved by the ARC before they are
implemented.
f. Homeowner should get appropriate insurance coverage for any contractor
doing work for them. If the Crystal Bay Homeowners Association (HOA) is
brought into any legal action by their contractor, it will pursue the
homeowner to reimburse the community for all incurred expenses.
3.05. Construction. The lot owners must notify the ARC of the date construction
commences.
a. Site Preparation
Pre-construction. Before building plan package submission, lot owners
may undertake some limited and specific actions (i.e. drainage
improvement, etc.) to prepare the site for construction. Plans for such
Crystal Bay Homeowner Association Home Construction, Lot Improvements,
and Appearance Guidelines
10
improvements must be submitted and approved by the ARC pursuant to
paragraph 4.01 before implementation. Depending on the nature of the
improvements, the lot owner may be required to pay the road and tree
bonds (paragraph 3.02.a.(2)-(3) and provide “before” photographs
(paragraph 3.03.c.(3). Such actions will not count towards the
requirements to complete house construction within a year (paragraph
3.05.e.
Lot Preparation
(a) Upon final building plan approval, authorized trees (paragraphs
3.01.b.(11) and 3.04.c.(3)) may be removed.
(b) If site preparation and/or tree clearing is to take place more than 3
months prior to beginning of construction, the property is to be
cleared of all debris, graded, and seeded to prevent erosion.
Construction Driveway.
(a) The lot owner is required to place and maintain a stone construction
driveway and road shoulder protection to avoid damage to the road
system and shoulders during site preparation and clearing, as well as
construction.
(b) Where a culvert is required for surface water drainage, the driveway
is to be placed over galvanized steel, double wall plastic or concrete
pipe at the roadside to allow all normal roadway and shoulder
drainage.
(c) There is to be no parking of autos, trucks, or equipment on the road
shoulders.
(d) There is to be no unloading of equipment or materials from the road
or road shoulder. Materials must be delivered to a central staging
area on the lot.
(e) Lot owners are responsible for repair or damage done to roads
and/or road shoulders, including all associated costs. The cost of
such repair can exceed the road bond.
Runoff Prevention. Silt fencing and other abatement efforts are required
to prevent runoff from depositing silt in the lake, or on neighboring
properties.
b. Construction Debris Container. A construction debris container, located and
maintained on the lot, is required during construction to contain all
Crystal Bay Homeowner Association Home Construction, Lot Improvements,
and Appearance Guidelines
11
construction and builders refuse.
c. Site Upkeep
Debris. The lot appearance must be maintained throughout the
construction process and remain free of debris and trash. It is an
obligation of the property owner and builder to not have building and
construction debris, or litter, be an obvious detraction for others in the
community.
Construction Trailer. Subject to written ARC approval, a temporary
construction shelter or trailer may be located on the lot. The ARC approval
will include the length of time and location where the shelter or trailer may
remain on the lot
xviii
.
Heavy Equipment. Heavy equipment (i.e. excavators, bulldozers,
backhoes, skid steers, etc.) or vehicles shall not remain on the lot when not
used to support construction for periods greater than a week. Storage of
such equipment and vehicles on the lot is prohibited.
d. Gas and Oil Tanks. All gas and oil tanks placed on the property must be
buried or screened in such a manner as to not be an obvious detraction
from all sides of your home
xix
.
e. Onsite Review. During construction, ARC members will conduct periodic
onsite reviews to ensure compliance with these guidelines and adherence to
the approved building plans.
f. Completion. The exterior of all houses must be completed within one (1)
year of the date of commencement of construction
xx
.
3.06. Post-Construction
a. Construction Materials and Debris. Portable toilet, construction debris
container, etc. must be removed from the site within 30 days after
construction is completed, or when occupancy takes place, whichever
occurs first.
b. Landscaping. Landscaping (shrubbery around house, seeding or sodding of
non-wooded areas, etc.) must be completed within 120 days of completion
of construction, or when occupancy takes place, whichever occurs first.
c. Inspection. Upon final completion of home construction, landscaping,
proper installation of driveway culvert, completion of driveway, installation
of approved mailbox and other final requirements, the homeowners should
request a post-construction Inspection from the ARC. If there is no damage
Crystal Bay Homeowner Association Home Construction, Lot Improvements,
and Appearance Guidelines
12
to the roads or road shoulders (using the photographs submitted with
Building Plan Package as a guide) or unauthorized trees removed, the
refundable portion of the road and tree bonds will be refunded. A check will
be made out by the Treasurer when the ARC forwards the request.
Section 4. Lot Improvements. No building, fence, wall, pool, outbuilding,
driveway, or any other accessory feature to the dwelling or any other structure
upon any lot shall be commenced, erected, placed, maintained or altered on any
lot or combination of contiguous lots until the complete construction plans are
approved in writing by the ARC. The ARC refusal or approval of plans may be based
upon purely aesthetic considerations, which in its sole discretion the ARC shall
deem sufficient, but approval shall not unreasonably be withheld
xxi
. This includes
the removal of trees, installation of swimming pools, outbuildings, major changes
to landscaping such as the addition of or modifications to patios, sidewalks,
driveways, and house additions, etc. There is to be no parking of autos, trucks, or
equipment on the road shoulders. There is to be no unloading of equipment or
materials from the road or road shoulder. Materials must be delivered to a central
staging area on the lot.
4.01. Requests and Approval.
a. Meeting with ARC. An onsite meeting with the ARC is required prior to the
submission of improvement, modification, or tree removal requests and any
site work to assure a complete understanding of all requirements and lot
owner’s desires and needs.
b. Request. A plan detailing any planned lot improvement or modification shall
be submitted to the ARC and approval obtained prior to beginning
construction.
The request must include a description of planned improvement or
modification desired giving full details or purpose and/or reason, type and
color of materials to be used, and location on the property:
If the request is for a change in color, attach a sample and model number
of the paint or stain color.
If the request is for a structural change, outbuilding, fencing, pool, etc.,
attach a sketch or an architectural plan. The ARC encourages you to also
attach an annotated copy of your lot survey showing where the
improvement is being made.
Request should include photographs, site layout, and architectural
Crystal Bay Homeowner Association Home Construction, Lot Improvements,
and Appearance Guidelines
13
drawings needed to detail the planned improvement or modification. A
fee will not be required for this review. One copy of all plans and related
data shall be furnished to the ARC for its records.
c. Construction Performance Bonds. Modifications that require several days of
construction may require a construction road bond (if heavy equipment is to
be employed), portable toilet, silt fencing and dumpster for the duration of
the project. The road bond in the amount of $500.00 for this additional
construction would be refundable if there is no damage to the road or road
shoulders. Lot owners are responsible for repair or damage done to roads
and/or road shoulders. The cost of such repair can easily exceed your road
bond. The ARC will determine if any or all the above would be required.
d. Approval. If no action is taken by the ARC within thirty (30) days after plans
are submitted to it, the owner may proceed to build without approval.
4.02. House Exterior
a. Changing the color scheme, appearance and style of an existing house
including shutters. trim, gutters, and screen, storm and exterior doors
requires ARC approval.
b. Replacement windows differing in style and size from the original require
ARC approval.
c. Roofs may be replaced with an architectural grade or style roof in a similar
color without ARC approval. Significant changes in color i.e., using a
different color not just a change in the color shade, require ARC approval.
d. Addition to the house (i.e., garage, room, and other additions)
Any additions require ARC approval.
Any proposed addition to an existing house shall have the outside walls
constructed of the same material as the existing house including doors,
windows, trim and roofing material. The color scheme of the outside walls,
doors, windows, trim and roofing materials shall match the existing house.
e. The roofing lines of any proposed addition shall be compatible with the
existing house.
f. Porches and decks.
Porches and decks, including modifications to or replacement of existing
porches and decks, not installed as part of the original house plans require
ARC approval.
Crystal Bay Homeowner Association Home Construction, Lot Improvements,
and Appearance Guidelines
14
Porches and/or decks proposed by a lot owner shall be built from
redwood, cedar or pressure treated wood with natural finishes. Synthetic
building materials, such as TREX, are acceptable.
Prefabricated porches shall have the same color scheme or be
compatible to the existing house color scheme.
A porch shall have a roof line compatible with the existing house.
4.03. Tree Removal. Except within 20 feet of the main dwelling, no trees of any
kind greater than 6 inches in diameter at ground level may be removed from any
lot without prior approval of the ARC
xxii
.
4.04. Outbuildings.
a. Outbuildings shall not be located between the house and the street.
b. Outbuildings made from sheet metal material shall not be permitted.
c. Outbuildings will normally have the same color scheme as the existing house
including trim and roofing material.
4.05. Fencing
a. Visible fencing may be approved by the ARC if it is found to enhance the
aesthetic integrity of the community. A description of the fencing height,
size, and placement on your lot, including samples of material or pictorial
brochures, must be provided to the ARC for their review and approval prior
to any fence construction.
b. Chain-link fence has been determined to be aesthetically unacceptable and
is, therefore, prohibited.
c. Dog lots are prohibited. A dog lot is defined as any separate or standalone
fenced in area, cage, or pen, regardless of shape or size, that is constructed
or used for the sole purpose of containing or housing dogs or any animals.
d. Nonvisible animal fencing (e.g. radio frequency, wireless, buried cable, etc.)
is allowed.
4.06. Pools
a. Installing a pool requires ARC approval.
b. There shall be no above-ground swimming pools unless approved by the
ARC
xxiii
.
4.07. Hardscape.
a. Hardscape improvements including walls, patios, outdoor fireplaces/pits,
outdoor kitchen, permanent grills/ovens, etc. and materials of construction
require ARC approval.
Crystal Bay Homeowner Association Home Construction, Lot Improvements,
and Appearance Guidelines
15
b. Additions to the driveway and walkways require ARC approval and shall be
composed of concrete, asphalt, pavers, etc.
c. Outdoor lighting (i.e. streetlights, light strings, spotlights, etc. should not
adversely impact adjoining property owners.
4.08. Docks, Seawalls and Boat Ramps. All encroachments
1
, i.e. docks, seawalls,
and boat ramps, require Greenwood County Lake Management Department, 864-
943-2648, approval. The ARC would appreciate a copy of the county approved
dock plan and approval letter or permit for our records.
4.09. Completion. The normal period of completion time for outbuildings or other
improvements shall be presumed to be four (4) months
xxiv
.
Section 5. Other Standards
5.01. Mailboxes. There is a community-wide standard for roadside mailboxes.
Mailboxes must be consistent the guidelines at Enclosure 3. Mailboxes must be
installed according to the U.S. Postal Regulations.
5.02. Trash Containers.
a. All trash, garbage, or other wastes shall be kept in sanitary containers
xxv
.
b. Garbage and trash containers must be kept screened or maintained in such
a manner as to not be an obvious detraction from all sides of your home.
5.03. Clotheslines. No outside clotheslines shall be permitted
xxvi
.
5.04. External Antennas and Satellite Dishes. Antenna and satellite dishes must be
screened or mounted in such a manner as to not be an obvious detraction from all
sides of your home. Free standing towers or antennas are not permitted. If such a
device is required, plans of materials, placement, purpose, etc. may be submitted
to the ARC and they will review for approval as an ‘exception’.
5.05. Signage.
a. No commercial billboards or signs of any description shall be displayed upon
any lot except for those approved by the ARC
xxvii
.
b. Any ‘For Sale’ or “For Rent’ signs must be displayed at the wood line or at
least 30’ back off the roadside and adhere to the guidelines at Enclosure 4.
Similar signs may be placed at your waterfront when advertising waterfront
property.
1
An encroachment Is anything which extends from lake front property into the lakebed onto Greenwood County
property. (Greenwood County Lake Management website)
Crystal Bay Homeowner Association Home Construction, Lot Improvements,
and Appearance Guidelines
16
Section 6. Maintenance and Appearance
6.01. Undeveloped Lots. Lots will be free of trash and debris. Easements must
remain accessible and roadside easement will be maintained in good repair and
appearance. Clearing of underbrush and removal of trees less than 6” in diameter
is authorized.
6.02. Boats, Trailers, Large Trucks, and Heavy Equipment
xxviii
a. Unless located within enclosed garages, no boat or boat trailer, travel trailer,
motor home, tractor trailer truck or any other such vehicle shall be kept or
maintained or located upon any lot for greater than five days without prior
ARC approval.
b. No automobiles that are disabled or under repair shall be kept on any lot
unless located within enclosed garages.
c. Unlicensed automobiles, including antique cars, must be stored within a
garage.
d. Large trucks (e.g. non-passenger vehicle larger than a pick-up truck) shall not
be parked on a regular basis within the subdivision.
e. Heavy equipment (i.e. earthmovers, excavators, bulldozers, backhoes, skid
steers, etc.) or vehicles shall not remain on the lot when not used to support
construction or lot improvements. Storage of such equipment and vehicles
on the lot is prohibited.
f. Any vehicle or boat having a height greater than 8 feet stored with the
HOA’s storage lot should be parked along the perimeter fence to avoid blind
spots and provide maximum security camera coverage of storage lot.
6.03. Landscaping. Lawns, trees, and shrubbery should be kept mowed, dead
branches removed, and neatly trimmed.
6.04. Structures. All structures, including siding, trim, paint, roofs, etc., must be
maintained in good repair.
6.05. Driveways. Driveways must be maintained in good condition. Large cracks
and crumbling surfaces within view of the street shall be repaired.
6.06. Animals
xxix
a. No animals or poultry of any kind may be kept or maintained on any lot,
except a reasonable number of dogs, cats, and other indoor household pets.
b. Each owner must see to it that all dogs are kept on the owner’s property.
c. The HOA may have strays and dogs that are not leashed and found off their
owner’s lot picked up by governmental authorities.
Crystal Bay Homeowner Association Home Construction, Lot Improvements,
and Appearance Guidelines
17
Section 7. Revisions.
_
Enclosures (as stated)
i
Declaration of Covenants, Conditions, and Restrictions of Crystal Bay Subdivision, Article V, paragraph (a)
Crystal Bay Homeowner Association Home Construction, Lot Improvements,
and Appearance Guidelines
18
I
Ibid, paragraph (b)
iii
By-Laws of Crystal Bay II Homeowners Association, April 22, 2017, Article VIII, Section 2(j)
iv
Declaration of Restrictive Covenants of Crystal Bay Subdivision, General Use Restrictions, paragraph 1
v
Ibid, paragraph 8
vi
Ibid, paragraph 4
vii
Crystal Bay Board of Directors Position Statement: Vacation Rental, February 13, 2013
viii
Declaration of Restrictive Covenants of Crystal Bay Subdivision, General Use Restrictions, paragraph 10
ix
Ibid, paragraph 2
x
Ibid, paragraph 12
xi
Ibid, paragraph 3
xii
Ibid, paragraph 16
xiii
Ibid, paragraph 3
xiv
Ibid, paragraph 21
xv
Declaration of Covenants, Conditions, and Restrictions of Crystal Bay Subdivision, Article V, paragraph (c)
xvi
Declaration of Restrictive Covenants of Crystal Bay Subdivision, General Use Restrictions, paragraph 11
xvii
Declaration of Covenants, Conditions, and Restrictions of Crystal Bay Subdivision, Article V, paragraph (e)
xviii
Ibid, paragraph 10
xix
Ibid, paragraph 14
xx
Ibid, paragraph 9
xxi
Ibid, paragraph 7
xxii
Ibid, paragraph 21
xxiii
Ibid, paragraph 14
xxiv
Ibid, paragraph 9
xxv
Ibid, paragraph 15
xxvi
Ibid, paragraph 18
xxvii
Ibid, paragraph 20
xxviii
Ibid, paragraph 19
xxix
Ibid, paragraph 14
Building Plan Submission Form (08/17/2020) Page 1 of 5
CRYSTAL BAY, P. O. BOX 428, CROSS HILL, SC 29332
“PLAN SUBMISSION FORM”
Lot # _________ Date plans submitted: ______________
OWNER ____________________________________________________________
CURRENT ADDRESS __________________________________________________
CITY/STATE/ZIP ______________________________________________________
HOME PHONE ________________________ WORK PHONE __________________
CELL/PAGER _______________EMAIL: ___________________
HEATED SQ. FOOT REQUIRED 1,800 sq. ft. waterfront/1,550 sq. ft. off water
HEATED SQ. FOOT SUBMITTED ____________________
BUILDER: ___________________________________________________________
ADDRESS: __________________________________________________________
CITY/STATE/ZIP ______________________________________________________
PHONE: _________________ CELL/PAGER _______________EMAIL: ___________________
PLAN NAME AND NUMBER ____________________________________________________
No clearing, grading or construction should commence BEFORE written approval is obtained.
Once house plans are approved, the foundation must be staked out and an inspection ordered
and approval of location prior to final approval of the building plans. Please contact the CB
Homeowners Association for this inspection. This inspection does not preclude a land survey,
local and state required permits and approvals.
ALL ITEMS ON THIS FORM MUST BE COMPLETED. The Architectural Review fee, Road Bond,
Land Clearing/Tree Bond and all other related fees must be paid, and Homeowner Association
dues must be current before approval of any plans is given.
You must submit photographs of the entire road, road shoulders and ditches in front of the lot
and across the street from the lot to show the condition of the road, road shoulders and ditches
prior to clearing or commencement of any construction.
You must submit several photographs taken from the roadside, and several photographs taken
from the approximate center of the lot, facing the rear of the lot or toward the lakeside of the
lot, showing the entire width of the lot of the vegetation and trees.
If you own a waterfront lot, please take several photographs from the lake side toward the lot
showing the entire width of the lot along the shoreline and of vegetation and trees.
Building Plan Submission Form (08/17/2020) Page 2 of 5
HEATED SQ. FT. 1st Floor ____________________
(To be completed) 2nd Floor ____________________
Basement ___________________
Other _______________________
Total _______________________
EXTERIOR FINISH: (circle all that apply) Brick Stone Stucco Siding Other _______
EXTERIOR MATERIALS (Specify Manufacturer, Product name and color)
Brick ___________________________________________ Color________________________
SIDING _________________________________________ Color ________________________
ROOF__________________________________________ Color ________________________
(architectural shingles required)
TRIM _________________________________________ Color _________________________
DOORS/SHUTTERS _____________________________ Color_________________________
DRIVEWAY AND WALKWAYS____________________________________________________
OTHER:______________________________________________________________________
GARAGE REQUIRED: 2 car garage, 480 square feet minimum
GARAGE SUBMITTED ATTACHED OR DETACHED ____________SQ FOOTAGE________________
FIREPLACE: YES NO Quantity _______CHIMNEY: Type of material________________
OPEN DECK: YES NO Quantity _____________ Total Sq. Ft. ______________________
COVERED PORCH: YES NO Quantity ________ Total Sq. Ft. ______________________
House plans must include elevations, floor plans and roof pitch.
Site plan (drawn to scale) must be submitted showing location of house, driveway, walkways,
well, septic field, repair area (if applicable), including distances from property lines.
A Landscaping Plan must be submitted prior to commencement of any clearing, grading or
construction of any nature.
County Building Permit Number/Date: _____________________________________
Onsite Sewage Treatment and Disposal System Permit
Number/Date:_______________________________________________
Building Plan Submission Form (08/17/2020) Page 3 of 5
A fee of $350 must accompany one set of house plans submitted for review. This set of plans
will be retained for future use. Plans need to be sent to Crystal Bay Homeowners Association at
P. O. Box 428, Cross Hill, SC 29332. NOTE: Plan Package must include a completed Plan
Submission Form, one full set of the proposed house plans, (including elevations, floor plans
and roof pitch), site plan, to scale, showing house placement including distances from property
lines, driveways, walkways, septic and well placement, and a landscaping plan showing plants,
shrubs, decks, fencing, etc. Materials and colors used for the exterior of the above must be
approved.
CHECK # _____________ DATE:___________ PAID BY: ____________________________
It is a requirement that you, and your builder, provide protection for the Crystal Bay roads and
road shoulders. Installation of shoulder barrier at the roadway in front of the lot to protect the
road shoulders during construction must be installed. You must also provide and maintain a
construction driveway that is substantial and will protect the roads and shoulders from damage
and excessive mud and clay.
A check from the Builder or Owner, made payable to the Crystal Bay Homeowners Association
in the amount of $1,500. is required for the Road Bond. Five hundred dollars ($500.) of this
amount is refundable upon completion of the home construction, if road pavement and road
shoulders near and in front of the subject lot are maintained throughout the construction
process, and are in the same good condition as when construction began (and in addition to
other conditions as outlined below).
CHECK# _____________ DATE:__________ PAID BY: ______________________________
It is a requirement that you, and your builder, have read and understand the policies regarding
clearing and tree removal. No trees greater than six inches (6”) at the base may be removed
without prior approval by the Architectural Review Committee other than those trees within
the building site and an area not to exceed twenty feet (20’) from the exterior of the building.
Those trees located in the driveway area and septic leach field may also be removed.
A check from the Builder or Owner, made payable to the Crystal Bay Homeowners Association,
in the amount of $1,000. is required for the Land Clearing/Tree Bond. This amount is refundable
if the Covenants regarding tree removal are adhered to (penalty is loss of Bond, plus a $l,000.
fine, plus $250. per tree for each unauthorized tree removed).
CHECK# ______________ DATE:_________ PAID BY: ______________________________
NOTES:
No clearing, earthmoving or construction of any nature should be done that could damage the
approved septic and repair area. Check with the county health department prior to any
construction.
The property owner is responsible for placing and maintaining a stone driveway to facilitate the
delivery and distribution of building materials at a centralized staging area on the subject lot.
Building Plan Submission Form (08/17/2020) Page 4 of 5
Galvanized steel, double wall plastic or concrete pipe is required for a driveway culvert when
needed to facilitate natural drainage. No materials of any nature are to be unloaded or stored
in the road or shoulder. This driveway is to be used before and during construction to minimize
damage to the roads and shoulders of the roads caused by the repeated parking of vehicles,
heavy equipment and trucks. During construction and after completion of construction, a
Crystal Bay Homeowners Association representative will inspect the roads and road shoulders
near and in front of the subject property. The owner will be responsible for any necessary
repairs.
Upon final completion of home construction, landscaping, proper installation of galvanized
steel, double-wall plastic or concrete pipe driveway culvert, paving of driveway as approved,
and the installation of the approved mailbox, the homeowner should request an inspection
from the Crystal Bay Architectural Review Committee. All construction must be completed
before requests for your refundable portion of the Road Bond is made.
__________________________________ _____________________________________
Signature of Person submitting plans Person submitting plans (please print)
PLANS RECEIVED BY: ________________________________ DATE: __________________
Please contact CRYSTAL BAY HOA at the above address if there are any questions regarding
the information contained in this Plan Submission Form.
Important: Please complete the “Checklist” which follows:
Building Plan Submission Form (08/17/2020) Page 5 of 5
PLAN PACKAGE CHECKLIST
The following checklist is a breakdown of all items which must be submitted to constitute “A
Complete Plan Submission Package” for the Architectural Review Process to begin:
1. ______ One (1) Complete set of house plans.
2. ______ Completed & signed Plan Submission Form.
3. ______ Road Bond $1,500.
4. ______ Architectural Review Fee $350.
5. ______ Land Clearing/Tree Bond $1,000.
6. ______ Pictures of road, shoulders, and lot (front & rear).
7. ______ Copy of South Carolina Department of Health and Environmental Control (DHEC)
issued Permit to Construct Onsite Sewage Treatment and Disposal System.
8. ______ Detailed and dimensioned site plan to scale. (You may wish to have your surveyor
prepare this for you.)
9. ______ Landscape Design Plan.
10. Color Samples (Manufacturer’s color brochure will be acceptable in place of actual material,
unless otherwise requested for purpose of clarification.)
______ Siding Material
______ Architectural Roofing Shingles
Owner’s Statement: I have read and understand the following documents: Pre-Construction
Site Work, Crystal Bay Homeowner Association Home Construction, Lot Improvements, and
Appearance Guidelines, and the Plan Submission Form.
_________________________________ _________________________
Signature of Owner Date
General Contractor’s Statement: I have read and understand the following documents: Pre-
Construction Site Work, Crystal Bay Homeowner Association Home Construction, Lot
Improvements, and Appearance Guidelines, and the Plan Submission Form.
__________________________________ ________________________
Signature of Contractor Date
Building Plan Submission Form (08/17/2020) Page 1 of 2
PRE-CONSTRUCTION SITE WORK
The Homeowners Assoc. and your volunteer BOD in no way wishes to limit your use and
enjoyment of your property here at Crystal Bay; however, as you know, this is a restricted
community and we (the BOD) are charged with upholding these restrictive covenants which are
a condition of ownership in a controlled community such as ours. We believe that you will find
us willing and fair to work with, especially if the Crystal Bay Homeowner Association Home
Construction, Lot Improvements, and Appearance Guidelines and order of procedures are
followed. This will make things run smoother for all of us. Please plan ahead.
SEPTIC SYSTEM Location and Permit. This is one of the first and most important permits to
obtain as it may affect, limit, or dictate the location of your driveway, home or garage. Permits
are issued by South Carolina Department of Health and Environmental Control, Greenwood
County office. Their phone number is (864) 227-5915. This permit is critical before any site work
is planned or started.
A STONE CONSTRUCTION DRIVEWAY (with approved culvert pipe, where needed to facilitate
drainage) and a Road Bond and a Land Clearing/Tree bond are Required before any major site
work can begin, before any construction vehicles or equipment of any kind could damage the
road edges, the road shoulders and/or the grass areas. Please remember that these areas
represent the community’s greatest maintenance costs.
CLEARING OF BRUSH or small trees (under 6” at ground level) by hand is permitted and no
architectural review is needed; however, cleanup is required.
RETAINING WALLS & DOCKS require pre-approval by Greenwood County Engineering Dept.
(864) 943-2648. A copy of the Dock Plan and Approval Letter need to be submitted to the
Architectural Review Committee, P. O. Box 428, Cross Hill, SC 29332 for our records prior to the
start of any dock or retaining wall construction.
LOCATION OF HOME ON LOT will need approval as part of the Architectural Review process
when you submit a “Complete” Plan Package. We strongly recommend you have a surveyor
accurately locate property boundaries, establish elevations, “stake out” your home, and
prepare an accurate “to scale” site plan, thereby ensuring compliance with the setback
regulations. This “Site Plan”/Plot Plan will be required as part of your Plan Package.
REMOVAL OF TREES BEFORE HOME PLAN APPROVAL will require a meeting with an ARC
Member for removal of any trees over 6 at ground level, i.e. driveway construction or access
for dock and/or retaining wall construction. An approved septic permit will be a prerequisite for
this type of work. A Land Clearing/ Tree Bond will also be required.
REMOVAL OF TREES AFTER HOUSE DESIGN APPROVAL. Except within the building footprint, or
within twenty feet (20’) of the main dwelling, the driveway and septic leach field, no tree of any
kind in excess of six inches (6”) in diameter at ground level may be removed from any lot
Enclosure 2
Building Plan Submission Form (08/17/2020) Page 2 of 2
without prior approval from the Architectural Review Committee. Clear-cutting is strictly
prohibited. A meeting must be scheduled with the ARC after the home is staked out and the
driveway area and septic field area are clearly identified to determine and mark any trees which
are additionally authorized for removal. A Land Clearing/Tree Bond will be required.
Unauthorized tree removal could result in the assessment of a fine in the amount of $1,000.
plus $250. per tree, in addition to loss of Land Clearing/Tree bond. We are here to work with
you to avoid any such action.
ENVIRONMENTAL CONSIDERATIONS. A silt fence (erosion barrier) is required in conjunction
with any site work that will disturb the ground and present the possibility of soil erosion. Silt
fencing is required to protect the lake and your neighbors’ property.
ROAD & SHOULDER DAMAGE MAY RESULT IN THE LOSS OF YOUR ROAD BOND AND/OR THE
ASSESSMENT OF ADDITIONAL CHARGES. This can easily be prevented by stressing to your
builder that there is to be NO unloading of equipment or materials from the roadway. The
shoulders are to be protected from parking of trucks or equipment.
PLEASE ALSO READ AND UNDERSTAND THE “CRYSTAL BAY HOMEOWNER ASSOCIATION
HOME CONSTRUCTION, LOT IMPROVEMENTS, AND APPEARANCE GUIDELINESfor additional
information, procedures and requirements. If you have questions we are here to help.
This Guide is in no way intended to be a complete list of the Restrictive Covenants; it is,
however, an attempt to clarify some areas which in the past have been overlooked, neglected,
misunderstood or ignored. Our road system and shoulder maintenance are the single largest
cost and investment of the Homeowners Association. It is for that reason that we wish to try to
avoid all unnecessary stress, damage, and related expenses. With your cooperation we feel this
goal can easily be accomplished. Thank You for your anticipated cooperation.
All approvals must be in written form. No Verbal commitments can be honored.
Please refer to “Crystal Bay Homeowner Association Home Construction, Lot
Improvements, and Appearance Guidelines” for greater details
Mailbox Design Guidelines.docx Page 1 of 2
MAILBOX DESIGN GUIDELINES
The following is information for the custom designed mailbox approved for Crystal Bay. This
design provides a newspaper box below the large mailbox. Mailboxes must be installed
according to the U.S. Postal Service Regulations.
Mailbox size: Large, 23 ½” deep x 11 ½” wide x 15” high. (available at Lowes)
Color: Black only.
Mailbox post: Pressure treated or cedar lumber.
House numbers: Are to be 3 to 4 inches high with a white reflective surface and placed on both
sides of the upright post below the cross arm.
Mailbox placement: The post should be sunk approximately 24” into the ground so that the
bottom of the box is 46” above the road surface and cannot extend into the roadway. US Postal
Regulations should be followed. Position the post so that the front of the box is 12 inches back
from the edge of the road and no closer than 6 feet from the side of your driveway.
Material List
4 x4 x 8 ft. pre-treated post
5/4 x 6 X 12 ft. pre-treated post
Large black mailbox
Sets of reflective house numbers
Deck Screws (10) - 3 ½” and (24) 2 ½” screws
One bag concrete mix
Cut List
(1) pc. 4 x 4 x 8ft. with top cut to a point at 45-degree angle
(upright post) (1) pc. 5/4 x 6 x 17” (newspaper shelf)
(2) pcs. 5/4 x 6 x 30 ½” (top) cut to 35 degrees on both ends. (cross arms)
2 pcs. 5/4 x 6 x 3 ½” (fillers to be placed between post and cross arms)
4 pcs. 5/4 x 6 x 10 ¾” (mailbox support shelf)
Contact any member of the Board if you are unable to build your own mailbox. There are many
carpenters in the neighborhood who can assist you in putting this together. Mailboxes must be
kept in good condition/appearance and are checked annually by the Architectural Review
Committee.
Enclosure 3
Mailbox Design Guidelines.docx Page 2 of 2
Mailbox Post
Revised August 2018
For Sale Sign Policy.docx Page 1 of 1
For Sale Sign Policy
The For Sale sign in Crystal Bay must follow the below format, regardless if the property/home
is being sold by a real estate company or homeowner.
24"
Enclosure 4