TIA Worksheet
Reference # ______________
This worksheet was developed to facilitate the TIA scoping process. The developer’s representative
shall complete and submit this worksheet to the City with the required background information at least
two weeks prior to the scoping meeting.
Background Information
Project Name: _________________________________________________________________________________________________
Developer Representative: _______________________________________________________________________________________
Representative’s Contact Information
Phone: ______________________________________ Email: ___________________________________________
Proposed land uses: ____________________________________________________________________________________________
Trip generation worksheet Preliminary Trip Distribution and Assignment Diagrams
Include with worksheet:
Site plan with driveway locations Basis for background traffic growth rate
TIA Parameters
Parameter Developer Proposed
City
Concurrence?
If no, identify modification required
Yes No
Trip Generation Code
Site Build Out Year
Background Traffic Growth Rate
Proposed Peak Periods (check all)
AM PM Other
Special Scenarios for Evaluation 1)
(i.e. Phasing, 6-year status, etc.)
2)
Intersection for Analysis 1)
(in addition to all site driveways;
attach list or map
if more than 4 intersections)
2)
3)
4)
Additional Comments/Concerns to be Addressed in the TIA
__________________________________________________________________________________
__________________________________________________________________________________
Agreement on TIA Parameters
TIA Type: Worksheet (< 51 PHT)
Minor (<300 PHT & Multiple Land Use, or <500 PHT & Single Land Use)
Major (>301 PHT & Multiple Land Use, or >501 PHT & Single Land Use)
Date: ______/_______/____________
Comal County (if applicable)
Developer's Representative
Printed Name of Representative
Printed Name of Representative
Printed Name of Representative