Page 2 PERMIT APPLICATION JOB ADDRESS:
IMPORTANT NOTICES
1. DO NOT BEGIN ANY WORK WITHOUT HAVING RECEIVED YOUR VALIDATED PERMIT AND PERMIT CARD. Applying
for a permit does not grant the right to begin construction. HOURS OF CONSTRUCTION are limited to: Monday through Saturday
from 8:00 a.m. to 6:00 p.m. No inspections will be conducted on weekends and holidays.
2. All construction of demolition areas MUST BE MAINTAINED IN A CLEAN, NEAT AND SANITARY CONDITION free from
construction debris.
3. STREETS AND NEIGHBORING PROPERTIES SHALL BE KEPT FREE FROM DIRT AND DEBRIS.
4. SWALES MUST BE PROTECTED FROM BEING DAMAGED BY EQUIPMENT OR VEHICLES.
5. Construction trailers are prohibited on single family residential construction sites. Other construction may have a trailer, which requires
a separate permit.
6. PORTABLE TOILETS for a construction site require a separate permit and must be screened from view.
7. DO NOT DISCHARGE WATER INTO THE RIGHT OF WAY OR STORM DRAINS without approval from the Building Department.
8. EQUIPMENT AND MATERIALS SHALL BE STORED at least 10 feet from the edge of pavement.
AFFIDAVIT - Please read carefully
Application is hereby made to obtain a permit to do work and installation as indicated. I, the OWNER of the property,
certify that all work will be performed to meet the standards of all laws regulating construction in this jurisdiction.
I understand that separate permits are required for ELECTRICAL, PLUMBING, POOL, EXTERIOR DOOR,
MECHANICAL, WINDOW, FENCE, DRIVEWAY, ROOFING, SHUTTERS and SIGNS. There may be additional
permits required from other governmental agencies.
I, the OWNER of the property, have disclosed all information related to any work at the property performed in the prior
twelve months to the Building Official. Further, I am fully aware that if the cumulative cost of work to my home or
business under this and any other permit equals or exceeds fifty percent (50%) of the fair market value of the structure,
the entire structure must meet the present federal flood criteria for finished floor elevation. I am also fully aware that
if the total cost of work to my home or business under this and any other permit exceeds fifty percent (50%) of the
replacement cost of the structure, then the entire structure must conform to the current code requirements of the Florida
Building Code.
WARNING TO OWNER: Your failure to record a NOTICE OF COMMENCEMENT may result in your paying twice
for improvements to your property. If you are spending more than $2,500 or intend to obtain financing, you may wish
to consult with your attorney or lender before recording your Notice of Commencement. The Notice of
Commencement must be recorded with the Clerk of Courts, for additional information please call 305-372-7777. Once
recorded, the Notice of Commencement must be POSTED AT THE JOB SITE in accordance with Section 713.35 of
Florida Statutes.
STATE OF FLORIDA, COUNTY OF MIAMI-DADE
Signature of Owner
Print Name
Sworn to and subscribed before me this Day of
,
Signature of Notary Public-State of Florida
SEAL:
Personally known OR, Produced Identification
Type of Identification Produced:
STATE OF FLORIDA, COUNTY OF MIAMI-DADE
Signature of Contractor Qualifier
Print Name
Sworn to and subscribed before me this Day of
,
Signature of Notary Public-State of Florida
SEAL:
Personally known OR, Produced Identification
Type of Identification Produced: