City of Tomball, 501 James Street, Tomball, Texas 77375 Phone: 281-290-1402 www.tomballtx.gov
Revised: 01/20/2020
BUILDING PERMIT (RESIDENTIAL) APPLICATION
CITY OF TOMBALL
501 James Street
Tomball, Texas 77375
(281) 290-1402 (281) 351-4735 Fax
www.ci.tomball.tx.us Date:
Permit Number:
(Assigned by Permit Office)
Phys
ical Add
re
ss of
Pr
o
ject:
Owner’s Name: ________________________ E-Mail: _______________________ Phone: _____________
Tenant’s Name: ________________________ E-Mail: _______________________ Phone: _____________
Engineer: _____________________________ E-Mail: _______________________ Phone: _____________
Architect: _____________________________E-Mail: _______________________ Phone: _____________
Contractor: ____________________________E-Mail: _______________________Phone: _____________
Add
ress:
Ci
ty:
S
t
a
te:
______Zip
:
_____________
Contractor Contact: _____________________________ E-Mail: ___________________________________
NEW RESIDENTIAL RESIDENTIAL ACCESSORY
RESIDENTIAL ADDITION RESIDENTIAL FENCE
RESIDENTIAL REMODEL/RENOVATION SWIMMING POOL
Subdivision
:
__________________________ Lot: ____________
B
lock
:
__________ Section: _____
Valuation
:
__________________________ Square Ft.: _______ Block: __________ Section: _____
Description of Work to be completed:
TAP AND IMPACT FEES Upon installation, the listed applicant will be held financially responsible for at least the minimum
utility charge(s) for all taps listed below.
TAP
SIZE
TAP
FEE
IMPACT FEE
TOTAL
Water (Domestic)
$
$
$
Water (irrigation)
$
$
$
Sewer
$
$
$
Gas
$
$
$
Total Gas BTU’s: TOTAL: $ _________________
Paid
Building Plan Review Fee
:
(Coll
ecte
d
w
h
e
n plans
are
submi
tte
d) $
Fire and Life Safety Plan Review Fee:
(Collected when plans are submitted)
$
Driveway / Culvert Permit Fee:
$
Tap and Impact Fees:
$
Permit Application Fee:
$
Total Amount Due:
$
** Property Owner or Authorized Agent must sign the Residential Building Application form.
I hereby certify that I have read and examined this application and know the same to be true and correct.
Applicant / Contractor (print) Date:
Applicant / Contractor (signature) Date:
Building Official Approval Date:
City of Tomball, 501 James Street, Tomball, Texas 77375 Phone: 281-290-1402 www.tomballtx.gov
Revised: 01/20/2020
Submittal Checklist for Residential
Building
Plan R
eview
1. Building Permit Application: Complete entire application, including: Valuation of Project,
contact information including phone number and applicant’s signature.
2. A Plan Review Fee will be collected at the time the Building Permit application is
submitted and the balance of the Building Permit Fee will be collected when plans are
approved and the permit is processed and picked up by the Contractor.
3. Planning and Zoning Approval: City Planner (281) 290-1491. Approved plans and
survey from the City Planner should be included in the building application submittal.
4. The City of Tomball is currently under the 2015 International Residential Building Code.
Submit a complete set of Building Plans in PDF form, including the following, to our
digital plan submittal system listed below.
a. Floor Plans
b. Identify Construction Type, Occupancy Type, Occupant Load, and Fire Separation.
c. Elevations
d. Plumbing, Mechanical and Electrical Plan (NEC 2017) and Details.
e. Structural Plans: Include Foundation Plan with Details, Framing and Shear Wall Bracing
locations with Details (Nailing Pattern, and Hold-downs).
f. Site Plan: with dimensions showing all buildings on the property, the driveway location,
property boundaries, building setback lines, and all existing easements.
DIGITAL PLAN SUBMITTALS:
PLEASE SUBMIT YOUR APPLICATIONS AND PLANS DIGITALLY IN A SINGLE PDF BY FOLLOWING THE
WEBSITE BELOW: WEBSITE: tomballtx.gov/securesend
USERNAME: tomballcdd
PASSWORD: Tomball1
5. Submit a 2015 Energy Analysis Report building envelope, lighting loads and mechanical loads.
Your engineer can do this for you or you may use ResCheck 2015 IECC which is a free
download software at U.S. Department of Energy website.
6. Provide the following information for New Utility Connections.
a. Sewer Tap (Number of taps and their sizes)
b. Water Tap (Number of taps and their sizes)
c. Gas Tap (A list of gas fixtures including the total BTU Load)
7. ** Contractor must provide Liability Insurance with a minimum of $500,000 of combined
single limit coverage Equal to or Greater than the contract amount, whichever is greater. The
City of Tomball must be listed as the “Certificate Holder” on the policy.
Separate permits are required for electrical, plumbing, heating, ventilation or air conditioning. This permit
becomes null and void if work or construction authorized is not commenced within 6 months, or if
construction or work is abandoned for a period of 6 months at any time after work is commenced. All
provisions of laws and ordinances governing this type of work will be complied with whether specified
herein or not. The granting of a permit does not presume to give authority to violate or cancel the
provisions of any other state or local law relating to construction, nor does it give authorization or approval
to encroach on any easement or property or violate any deed restrictions. The City of Tomball shall never be
liable for any damage or loss by reason of the issuance hereof. Each holder and other persons acting under
authority of this permit are personally responsible for compliance with all the above provisions and assume
the entire risks incidental to the work being permitted.
City of Tomball, 501 James Street, Tomball, Texas 77375 Phone: 281-290-1402 www.tomballtx.gov
Revised: 01/20/2020
CONSTRUCTION SITE
REQUIREMENTS
1. Post address and permit in a visible location at the jobsite.
2. An approved set of plans must be on the jobsite.
3. Install safety fence and rails where needed.
4. Provide adequate temporary toilets
5. Install silt fencing where needed; protect storm drains and clean streets daily.
6. Keep jobsite clean and safe. By City Ordinance, rentals for all roll-offs must be
made directly through WCA at (281) 368-8397 or CSHouston@wcamerica.com
7. Keep fire hydrant clear and access available for emergency vehicles.
8. All plan revisions must be reviewed and stamped approved by the Building Official
prior to field inspection.
9. The City of Tomball is currently under the 2015 International Building Code.
10. Obtain inspections for all phases of construction work being done.
11. All foundations will require a form survey approved by the City before inspection.
12. Framing inspections should be scheduled after all MEP rough-ins have passed
inspection.
13. Building finals should be scheduled after all MEP finals have been done and
passed inspection.
14. Before a Certificate of Occupancy can be issued, a Final Energy Analysis inspection
and a Customer Service inspection must be done by a third party inspector. The
City Fire Marshall must also approve the building before the final building
inspection and Certificate of Occupancy is issued.