COMMERCIAL TEMPORARY TENT/TRAILER/ACCESSORY APPLICATION
COMMERCIAL TEMPORARY TRAILER PERMIT CHECKLIST
1. Completed Application
(IF APPLYING FOR MULTIPLE TRAILERS, SUBMIT A SEPARATE APPLICATION FOR EACH STRUCTURE)
2. Site plan showing:
a. ALL property dimensions
b. size and location of ALL existing structures
c. parking spaces AND their dimensions after installation of proposed trailers;
d. parking calculation
e. location of septic system(s) and well(s) (if applicable)
f. size and location of ALL proposed tents/trailers
g. setbacks of all proposed tents/trailers from property lines, existing buildings, well and septic systems;
h. if parcel is under 3 acres, it must be drawn to scale
i. An example of a site plan can be found here: https://southbendin.gov/wp-content/uploads/
2018/08/Example-of-Site-Plan.pdf
3. Special use/exception and/or variance approvals if applicable
4. All applicable contractors involved in the project-building, electrical, plumbing, and HVAC. (on application form)
5. Application fee **SEE FEE SCHEDULE FOR APPLICABLE PERMIT FEES
USEFUL LINKS
City of South Bend Zoning/Variance Applications http://southbendin.gov/zoning
St. Joseph County Zoning/Variance Applications http://www.sjcindiana.com/306/Division-of-Planning-Zoning
PROJECT
ADDRESS:
PROPERTY OWNER:
MAILING ADDRESS: