Report of Inspection &
Testing of
Wet Pipe Fire Protection
S
ystems Annual
ALL QUESTIONS ARE TO BE FULLY ANSWERED AND ALL
BLANKS TO BE FILLED
CUSTOMER
SYSTEM ID
ADDRESS:
Inspector Name:
Date:
I acknowledge that the listed deficiencies have been discussed with me and that I am requesting a quote for the repair of said deficiencies.
Owner/Designated Representative
All “NO” answers must be
fully explained.
Inspector’s Initial
Owner/Designated Rep. Initial
Date
Annual Report of Inspection
of Wet Sprinkler System
Annual Testing Requirements
for Wet Sprinkler System
Annual Report of Inspection
of Wet Sprinkler System
YN/AN
5.2 Hydraulic nameplate attached
5.2 Exterior alarms properly identified
13.1 FDC plainly visible
13.1 FDC easily accessible
13.1 FDC swivels in non-binding rotation
13.1 Caps/plugs in place
13.1 Gaskets/signs in place
13.1 FDC Ball drip drain drip free
5.1 Alarm panel clear
System in Service
Comments:
5.2 Sprinkler supply gauge psi
5.2Sprinkler supply gauge ___ main drain flow psi
5.2 Sprinkler system gauge psi
5.2 Sprinkler system with main drain flow psi
Y N/A N
5.3 Interior building alarms operating
5.3 Exterior alarms operating
5.3 Inspector’s test flow psi
5.3 Time to ring alarm from
alarm check valve min sec
5.3 Time to ring alarm from
flow switch min sec
5.3 Time to ring alarm from
pressure switch min sec
Y N/A N
5.3 Gauges appear operating properly
5.1 Did alarm supervisory company receive
signal properly?
5.1 Did alarm panel reset properly?
Comments:
Y N/A N
4.1 Prior to freezing season, owner is
responsible for building to be in secure
condition and properly heated.
5.2 Visual Inspection: hanger/seismic
bracing appears attached and secure.
5.2 Visual Inspection: “exposed” piping
appears in good condition.
5.2
Piping appears free of mechanical damage.
5.2 Piping appears free of leakage.
5.2 Piping appears free of corrosion.
5.2 Piping appears properly aligned.
5.2 Piping appears free of external loads.
5.2 Sprinklers appear free of corrosion.
5.2 Sprinklers appear properly positioned.
5.2 Sprinklers appear properly spaced.
5.2
Sprinklers appear free of foreign material.
5.2 Sprinkler spray patterns appear free of
obstructions.
Comments:
Annual Testing & Maintenance Tasks that are in Addition to
Other Frequency Tasks - For Wet Sprinkler System
Y N/A N
13.3 Control valve lubricated
13.3 Control valve operated to closed
position and returned to open position
13.3 Control valve locked/tampered open
13.3 Backflow assembly control valves
operated & returned to open position
13.3 Post indicator valve operated with
_____ number of turns recorded
13.3 Post indicator valve returned to open
position
(All above listed control valves to be left 1/4 turn from wide open.)
5.3 Antifreeze solution checked to provide
adequate freeze protection:
(protection temp: _______ ° F)
Testing Frequency Items of 5 Years or Greater
14.3 Internal Inspection last date (5 years) ________
13.1 Alarm check valve
6.1 Flow tested pressure regulating control
valves***
Alarm Valve Info Y N/A N
Make
Model
Size Date
13.4 Check valve
13.4 Strainers
13.4 Filters
13.4 Trim orifices
5.3 Gauge maintenance: date last tested (5 years) _____
5.3 Replaced date
5.3 Calibrated date
5.3 Sprinkler maintenance test
5.3 (5 years)
High temp. date ________________
5.3 (20 years, then 10 years thereafter)
Fast response date ______________
5.3 Residential head (20 years)
5.3 (50 years, then 10 years thereafter)
Standard sprinkler date __________
Comments:
(Description of this form: These tasks are in addition to the monthly and quar-
terly tasks. Complete the monthly and quarterly reports AND this report as re-
quired for a total annual report of inspection. Visual inspection is defined as what
can be observed from the floor level by an inspector. The use of binoculars is
recommended for visual inspections in high buildings.)
JOB #
Kevin Hergenroeder, Tony Witt
Riser 3 1st floor classroom addition