6. Property located in a designated Floodway (FW District)? Yes No
IF ANSWERED YES, CERTIFICATION MUST BE PROVIDED PRIOR TO THE ISSUANCE OF A PERMIT TO
DEVELOP THAT THE PROPOSED DEVELOPMENT WILL RESULT IN NO INCREASE IN THE BASE
FLOOD (100-YEAR) ELEVATION.
7. Property located in a designated Floodway Fringe (FF or FP District)? Yes No
a. Elevation of the Base (100-year) Flood ft., NGVD
b.
Elevation/floodproofing
requirement ft., NGVD
c. Elevation of the proposed development ft., NGVD
d. Elevation of top of finished floor ft., NGVD
THIS PERMIT IS ISSUED WITH THE CONDITION THAT THE LOWEST FLOOR (INCLUDING BASEMENT FLOOR)
OF ANY NEW OR SUBSTANTIALLY IMPROVED RESIDENTIAL BUILDING WILL BE ELEVATED 1.0 FT. ABOVE
THE BASE FLOOD ELEVATION. IF THE PROPOSED DEVELOPMENT IS A NON-RESIDENTIAL BUILDING, THIS
PERMIT IS ISSUED WITH THE CONDITION THAT THE LOWEST FLOOR (INCLUDING BASEMENT) OF A NEW
OR SUBSTANTIALLY IMPROVED NON-RESIDENTIAL BUILDING WILL BE ELEVATED OR FLOODPROOFED 1.0
FT. ABOVE THE BASE FLOOD ELEVATION.
8. Source of Base Flood Elevation Data if not available on FIRM: __________________________
Panel number of FIRM: _______________
9. Other permits required?
Corps of Engineers 404 Permit: Yes No
Nebraska Department of Natural Resources: Yes No
Other: ____________________________________________________________