About the Cover: What makes a city a great place to live? According to Kiplinger
Personal Finance, good jobs, reasonably priced homes, quality schools, great
health care and manageable size are all essential parts of the mix. With our scenic
beauty, diverse community, cultural offerings and key employers—including the
state government, major healthcare institutions, and international industries—Little
Rock has the amenities of a larger city but is small enough that residents feel like a
strong part of the community fabric.
All of that caught the attention of Kiplinger, which named Little Rock the #1 Great
Place to Live. This honor afrmed what those of us who call Little Rock home
already recognize: it is a great city for living, working and playing. It serves as a
testament to visionaries who have worked to position Little Rock as a leading city.
The cover of the City’s 2014 Annual Operating Budget features photographs of some
of the many things that make Little Rock the #1 Great Place to Live including our city
employees, diverse citizens, vibrant downtown, numerous amenities, and
outstanding employers. We realize this is an incomplete depiction of why Little Rock
is such a great place to live, because for each one of our citizens those reasons are
different, and that is what truly makes Little Rock the greatest place to live.
Downtown skyline photo courtesy of Paul Barrows
City of Little Rock, Arkansas 2014 Operating Budget
City of Little Rock
2014 Annual Operating Budget
Bruce T. Moore
City Manager
Prepared by:
Department of Finance
Sara Lenehan, Finance Director
LaVerne DuVall, Budget Officer
1
The enclosed 2014 Annual Budget is presented for your use and reference. The
annual budget is an appropriation document that authorizes spending for the
current year. Additionally, the budget document provides information concerning
the City’s organization structure and the City’s fiscal position.
The online version of the 2014 budget document and budget documents for
previous years can be found on the City of Little Rock’s website located at:
www.littlerock.org
If you have any comments, suggestions for improvement, or questions
concerning the City’s annual budget, please contact the Budget Office at (501)
371-4559. Thank you for your interest in the City of Little Rock.
2
The Government Finance Officers Association of the United States and Canada
(GFOA) presented an award for Distinguished Budget Presentation to the City of
Little Rock, Arkansas for its annual budget document for the fiscal year beginning
January 1, 2013.
In order to receive this award, a government unit must publish a budget document
that meets program criteria as a policy document, as an operation guide, as a
financial plan, and as a communications medium.
The award is valid for a period of one year only. We believe our current budget
document continues to conform to program requirements, and we are submitting it to
GFOA to determine its eligibility for another award.
3
This page left blank intentionally.
4
INTRODUCTION Page
Title Page ............................................................................................................ 1
Budget Award ...................................................................................................... 3
Table of Contents ................................................................................................ 5
Little Rock at a Glance ......................................................................................... 9
City of Little Rock Board of Directors ................................................................. 10
How to Use the Budget Document .................................................................... 11
Management Team ........................................................................................... 15
City of Little Rock Organizational Chart by Fund Responsibilities .................... 17
City of Little Rock Operating Fund Structure ..................................................... 18
City Manager’s Transmittal Letter ...................................................................... 21
Overall City Goals and Objectives................................................................. 33
THE BUDGET PROCESS
The General Government Budget Process ....................................................... 37
Amending the Budget ........................................................................................ 39
Budget Policies .................................................................................................. 40
Other Budget Procedures .............................................................................. 41
FINANCIAL STRUCTURE
Little Rock's Financial Structure......................................................................... 43
Funds Controlled by the Governing Body .......................................................... 43
Fiscal Policies .................................................................................................... 48
Other Agencies .................................................................................................. 54
BUDGET SUMMARIES
Budget Summaries ........................................................................................ 57
2014 Operating Fund Budget Summaries Graph .............................................. 58
General Fund Activity Graph ............................................................................. 59
Budget Summary by Fund Type .................................................................... 60
General Government Summary. .................................................................... 61
Special Revenue Funds ................................................................................ 62
Capital Project Funds. ................................................................................... 65
5
Enterprise Funds ........................................................................................... 69
Internal Service Fund .................................................................................... 71
Fiduciary Funds ............................................................................................. 72
Debt Service Funds ....................................................................................... 74
2014 Long Term Forecast ............................................................................. 77
REVENUES
All Funds Operating Revenue Sources Graph .................................................. 81
All Funds Operating Revenue Summary ........................................................... 82
General Fund Summary of Revenue ................................................................. 83
All Funds Operating Revenue Detail ................................................................. 84
Revenue Trends ................................................................................................ 89
General Fund Revenue Sources and Trends Graph ......................................104
EXPENDITURES
All Funds Expenditures by Classification Graph .............................................105
All Funds Department Budgets Summary .......................................................106
Summary of General Government Appropriations Graph ...............................107
General Fund Summary Graph .......................................................................108
Operating Budget Detail ..................................................................................109
Staffing Summaries .........................................................................................113
Other General Fund Budget Expenditures ......................................................116
Service Program Graph ...................................................................................117
Service Program Category ..............................................................................118
Public Safety Revenue and Expenditure Comparisons ..................................120
Public Safety Operating Expenditures as a Percentage of General Fund .....121
CAPITAL IMPROVEMENTS
Capital Funding. ...............................................................................................123
Capital Project Funds Provided by Bond Issues .............................................123
Capital Project Funds Provided by Other Sources ..........................................124
2014 Capital Improvements ......................................................................... 128
2014 Major Capital Projects ........................................................................ 129
6
Significant Routine Capital Expenditures ............................................ 129
Significant Non-Routine Capital Expenditures ..................................... 129
Significant Non-recurring Parks and Zoo Projects Funded
by the 2009A Capital Construction Revenue Bonds ...................... 130
Other Significant Non-Recurring Capital Improvements ...................... 131
Capital Funding Activity Graphs .................................................................. 140
DEBT MANAGEMENT
Debt Management ....................................................................................... 141
City’s Legal Debt Margin ............................................................................. 141
Debt Applicable to Debt Limit 2004 2013 ................................................. 142
Summary of Bond Indebtedness ................................................................. 143
Future Debt Service ..................................................................................... 144
GENERAL FUND DEPARTMENTS
Mayor ...............................................................................................................147
General Administrative ....................................................................................151
Board of Directors ...........................................................................................157
Community Programs ......................................................................................161
City Attorney ....................................................................................................167
District Court First Division .......................................................................... 173
District Court Second Division ..................................................................... 179
District Court Third Division .............................................................................185
Finance ............................................................................................................191
Human Resources ...........................................................................................197
Information Technology ...................................................................................203
Planning and Development .............................................................................209
Housing and Neighborhood Programs ...........................................................215
Public Works General .....................................................................................221
Parks and Recreation ......................................................................................227
7
River Market ....................................................................................................233
Golf. .................................................................................................................237
Jim Dailey Fitness and Aquatic Center ............................................................243
Zoo ..................................................................................................................249
Fire ..................................................................................................................255
Police ...............................................................................................................261
SPECIAL REVENUE FUND DEPARTMENT
Public Works Street .........................................................................................267
INTERNAL SERVICE FUND DEPARTMENT
Fleet Services ..................................................................................................273
ENTERPRISE FUND DEPARTMENTS
Vehicle Storage Facility ...................................................................................279
Waste Disposal ...............................................................................................285
APPENDIX
State and City Budget Statutes .......................................................................291
Statistical Information ......................................................................................295
Glossary of Key Budget Terms ........................................................................305
Glossary of Key Acronyms Terms ...................................................................312
8
LITTLE ROCK AT A GLANCE
Two hundred years ago, the first permanent settlement was established in what is now
known as Little Rock. Since 1812, Little Rock has grown from one person to become the
Capital City of Arkansas with a population of 193,524. The metropolitan area population is
699,757 with more than 1 million people living within 70 miles of Little Rock.
The City is named for La Petite Roche, a rock formation on the banks of the Arkansas River.
It created a natural harbor which made Little Rock an early center of business and
commerce. Today, that tradition continues as Little Rock is home to several large
corporations. Among the City’s major industries are technology, healthcare, retail,
manufacturing and government. The presence of these industries helps to explain the City’s
lower than average unemployment rate of approximately 6.7%.
New businesses and housing opportunities are bringing people back to the City’s core to
live, shop, work and play. The River Market district is home to many restaurants, shops
and offices as well as attractions such as the Clinton Presidential Center and Park, several
other museums, and an expanding nationally-recognized bike trail system. In addition, the
Main Street Creative Corridor, MacArthur Park area, SoMA (South Main) and renovation of
Robinson Center Music Hall are some of the other exciting projects in the City’s core.
Redevelopment continues in the City’s older neighborhoods and the City is experiencing
new growth in areas to the west and southwest.
Medical facilities in the Little Rock area provide efficient, comprehensive service to more
than two million individuals throughout the state. The twenty major area hospitals
provide bed space for over 2,700 patients. There are a large number of specialty clinics,
including outpatient surgery centers that are continuing to expand.
Diverse and quality educational opportunities are available in Little Rock. The University of
Arkansas for Medical Sciences continues to garner international attention for ground
breaking medical research and procedures. The University’s five colleges, seven institutes
and the Graduate School serve more than 2,800 students. The University of Arkansas at
Little Rock (UALR) is a metropolitan university educating 13,000 students with a wide range
of degree offerings, including the juris doctorate degree offered at the UALR Bowen School
of Law. In addition, Little Rock is the home of Philander Smith College and Arkansas
Baptist College, two historically black colleges that are leading exciting revitalization
initiatives in their surrounding areas.
Situated along the southern bank of the Arkansas River, Little Rock is located where the
Delta meets the Ouachita and Ozark mountain ranges. With lakes and streams inside the
city limits and nearby, outdoor recreational options are almost unlimited. Residents and
visitors alike enjoy hiking, camping, boating, hunting, fishing, golf, tennis, swimming, and
soccer.
The Little Rock region offers wonderful opportunities for visitors: A City rich in history and
culture; many recreational opportunities; downtown entertainment; an energetic business
climate; and a major emphasis on quality of life initiatives for our citizens and visitors.
9
Return to Table of Contents
Mayor Mark Stodola
Director Erma Hendrix
Ward One
Director Ken Richardson
Ward Two
Director Stacy Hurst
Ward Three
Vice Mayor Doris Wright
Ward Six
Director B.J. Wyrick
Ward Seven
Director Lance Hines
Ward Five
Director Brad Cazort
Ward Four
Director Joan Adcock
Position Ten
Director Gene Fortson
Position Nine
Director Dean Kumpuris
Position Eight
City of Little Rock
Board of Directors
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
HOW TO USE THE BUDGET DOCUMENT
This section is designed to explain and simplify the use of this document. It will
acquaint you with the types of information you can expect to find such as:
Sources of funding for City Services
Where and how resources are utilized
Services provided by City Departments
Policies and objectives for the upcoming year
Definition - What is a Budget Document?
The budget document explains the City’s financial management plan for the
coming fiscal year. The budget outlines the day-to-day functions of City
departments for a one-year period and includes planned expenditures for major
capital projects. The Mayor is responsible for enforcing the spending limits
established in this plan.
Each year, the City establishes a budget for operations in the coming fiscal year,
January 1 to December 31. The budget is based on estimates of projected
revenues and other funding sources. Appropriations for City programs are
recommended based on available resources and priorities set by the City Board
of Directors.
As required by law, the Mayor submits a recommended budget to the Board of
Directors. The Board of Directors conducts an extensive review of the
recommended budget and holds several public hearings to receive citizen input.
Once any necessary modifications are made, the Board of Directors adopts the
Budget Ordinance. Upon completion, the Budget Document is published.
The budget must be adopted on or before December 30. A calendar of events
for budget development activities for fiscal year 2014 is included in this document
to more adequately describe the budget development process.
The 2014 Basic Budget is comprised of four major fund types: the General Fund,
Special Revenue Funds, an Internal Service Fund and Enterprise Funds.
The General Fund is utilized to account for revenues and expenditures for the
regular day-to-day operations of the City. The primary sources of revenue for the
General Fund are local sales taxes, property taxes, and utility franchise fees.
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Departments in the General Fund are organized into the following:
General Administration
Board of Directors
Community Programs
City Attorney
District Court First Division
District Court Second Division
District Court Third Division
Finance
Human Resources
Information Technology
Planning & Development
Housing & Neighborhood Programs
Public Works
Parks & Recreation
River Market
Golf
Jim Dailey Fitness & Aquatics
Zoo
Fire
Police
The other major fund types are described below:
1. Special Revenue Funds – These funds are utilized to account for revenues
that are legally restricted to expenditures for specific purposes, e.g., street
fund and grant funded programs.
2. Enterprise Funds – Proprietary funds in which the services provided are
principally supported through charges to the users of the services, e.g., solid
waste fund, vehicle storage facility and parking garages.
3. Internal Services Fund – Funds that provide services to other parts of the City
organization, e.g., motor pool, vehicle maintenance and insurance.
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Payments to the Internal Services Fund are not reflected as transfers, but are
included as line items within the budgets of the departments in all operating
funds.
Operating Flow of Funds
Revenues are deposited into the General Fund as a result of specific activities.
For example:
General Fund Enterprise Funds
Property Taxes Service Rates
Sales Taxes Sanitation Fees
Licenses & Permits Compost Sale
Expenditures are made from the General Fund to support activities. For
example:
General Fund
General Fund Departments - Police, Fire, Parks & Recreation, etc.
Personnel, supplies and materials, repairs and maintenance, contractual,
capital outlay, debt service, and transfers out.
Enterprise Fund
Enterprise Funds – Waste Disposal, Vehicle Storage, Facility and Parking
Garages.
Personnel, supplies and materials, repairs and maintenance, contractual,
closure/post closure, depreciation, debt service, and transfers out.
Departments within the General Fund, Special Revenue Funds, and Enterprise
Funds make payments into the Internal Service Fund for Fleet operations and
vehicle and equipment maintenance.
Capital Budget
The Capital Budget consists of major capital projects, which often require more
than one year to complete and place in service. Examples of capital projects
include street and drainage construction, building construction, and park
development. A description of the source of funding for capital projects is
included in the Capital Improvements section of this document. In addition, this
section includes the estimated funds required for the ongoing operation and
maintenance of the assets resulting from the capital improvement projects.
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
The completion of certain capital projects may be delayed for a period of time if
corresponding operating and maintenance funds are not available.
Debt Service Flow of Funds
The City issues debt after one of the following:
Approval by City Board to issue Temporary Notes, Certification of Obligations
or Revenue Bonds.
Successful completion of a Bond Election.
Funds generated from the sale of debt obligations are allocated to individual
special projects within the capital project funds. When a project is completed and
the project account closed, unused funds may be directed to retirement of the
debt service obligation. The Debt Service Funds are primarily supported by
property tax millages, which require voter approval, for the express purpose of
debt retirement. Other revenue sources for debt retirement include franchise
fees and system revenues. The Debt Service Funds initiate payments of principal
and interest to the bond purchasers. A description of the source of funding for
debt retirement and a discussion of the City’s legal debt margin is included in the
Debt Management section of this document.
Format for Budget Expenditures
A summary of budgeted operating expenditures and personnel is included in the
Expenditure section of this document. Following the summary information, each
Department’s organizational chart, mission statement, expenditure budget,
staffing summary, 2013 priorities and results, 2014 goals, and applicable service
measures are presented.
Major Categories of expenditures include the following:
Personal Services (Salaries, Wages and Employee Fringe Benefits)
Supplies and Materials
Repairs and Maintenance
Contractual Services
Closure/Post Closure
Capital Outlay
Depreciation
Debt Service
Transfers Out
Return to Table of Contents
MANAGEMENT TEAM
Mark Stodola Mayor
Bruce T. Moore City Manager
Bryan Day Assistant City Manager
Dorothy Nayles Director of Community Programs
Tom Carpenter City Attorney
Alice Lightle District Court First Division Judge
Victor Fleming District Court Second Division Judge
Mark Leverett District Court Third Division Judge
Sara Lenehan Director of Finance
Don Flegal Director of Human Resources
Randy Foshee Director of Information Technology
Tony Bozynski Director of Planning & Development
Andre Bernard Director of Housing & Neighborhood Programs
Jon Honeywell Director of Public Works
Truman Tolefree Director of Parks & Recreation
Gregory Summers Fire Chief
Stuart Thomas Police Chief
Mike Blakely Director of Zoo
Wendell Jones Director of Fleet Services
Budget Report Production, Analyst, and Graphics
LaVerne DuVall Budget Officer
Silas Roaf Budget Management Analyst
Return to Table of Contents
This page left blank intentionally.
Return to Table of Contents
City Manager
Assistant City Manager
Community Programs
Police
Fleet Services
Vehicle Storage Enterprise
Housing and
Neighborhood Programs
Information Technology
City Attorney
Human Resources
Public Works
Building Services
Street Fund
Waste Disposal Enterprise
Planning and Development
City Clerk
Fire
Finance
Parking Garages
Federal Programs
Parks and Recreation
Parks and Recreation
RiverMarket
Golf
Jim Dailey Fitness and Aquatics
Center
Citizens
Mayor and Board of Directors
Boards and Commissions
Zoo
District Courts
City of Little Rock Organizational Chart
by Fund Responsibilities
Return to Table of Contents
Return to Table of Contents
Return to Table of Contents
This page left blank intentionally.
Return to Table of Contents
Return to Table of Contents
OVERVIEW
General Fund:
The General Fund 2014 Operating Budget includes several significant changes from
the original 2013 Operating Budget. The 2014 Budget and the 2013 Amended Budget
include separate property tax levies and State Turnback Funds dedicated to the closed
Police and Fire Pension Plans. The revenues are recognized in the General Fund and
then passed through to the Police and Fire Pension Plans as pension contributions
reflected in the Police and Fire Departments. The impact of this adjustment is
approximately $10.9 million to the 2014 Budget and $10.7 million to the 2013
Amended Budget. In prior years, this adjustment was reflected in the actual revenues
and expenses of the General Fund at year-end; however, it was not included in the
Annual Budget.
Little Rock citizens passed an additional one (1)-cent local sales tax in September
2011 that was effective on January 1, 2012. Faced with significant challenges with
stagnant revenue in many areas due to the lingering effects of the economic downturn,
and one of the lowest local tax rates in the State, citizens supported the new tax
initiative. The City held several public hearings in each Ward to discuss priority needs
associated with Public Safety, Public Works, Jobs and Economic Development, Parks
and Recreation, Zoo and Tourism, and other priorities, including fleet replacement,
information technology needs, pension funding, and public transportation. The priority
needs were divided between on-going operating needs and capital needs. The five-
eighths (5/8)-cent permanent increase in sales tax for operations is reflected in the
FY14 Adopted Budget. The three-eighths (3/8)-cent temporary sales tax for capital
projects, which expires in ten (10) years (2021), is discussed in detail in the capital
section of the budget document. In addition, in a special election held on September
11, 2012, Little Rock citizens approved the issuance of capital improvement bonds not
to exceed $105 million for street and drainage improvements. Up to $73.5 million of
the bonds are dedicated to street improvements with the remaining $31.5 million
available for drainage improvements throughout the City. The bonds are secured by a
three (3)-mill ad valorem tax on taxable property located within the City of Little Rock.
The City issued $58,105,000 in bonds on July 24, 2013. A second series of bonds will
likely be issued in 2016 or 2017.
Sales Tax continues to be the leading revenue source for the City at approximately
52% of general fund revenues. The City’s sales tax is composed of a one and one-
eighth (1-1/8)-cent local tax on gross receipts, which includes the half (1/2)-cent sales
tax in effect since 1994, combined with the new five-eighths (5/8)-cent operating sales
tax effective January 1, 2012, as well as a per capita allocation of a one (1)-cent
County tax and State Turnback Funds. The three-eighths (3/8)-cent temporary sales
tax for capital projects is not reflected in the operating budget; however, it is reported
in a separate capital projects fund. Revenue from the operating portion of the new
sales tax is committed primarily to filling vacant Police Officer positions, supporting the
twelve (12) new Fire positions for the West Little Rock Fire Station that opened in
2012, maintaining grant-funded positions in the Police and Fire Departments and the
addition of Code Enforcement Officers. Also included is funding for neighborhood-
based/community initiatives of $5.5 million, increased funding for building
Return to Table of Contents
maintenance, expanded park maintenance, Zoo deferred maintenance, operations
and staffing, annual fleet replacement, information technology staffing and
maintenance, and new transit routes. Many of the initiatives supported by the new
sales tax were implemented during 2012 and will experience the second full year of
operation in 2014. Changes to the Arkansas Sales and Use Tax Law known as the
“streamlined sales tax” took effect beginning January 1, 2008. Sales tax revenues are
distributed based on where the purchaser takes receipt or delivery of the product or
service. In addition, local tax caps on most single transactions are no longer
applicable when City and County Sales and Use Taxes are collected. The local tax
cap continues to apply to the first $2,500 per item on the sale of motor vehicles,
aircraft, watercraft, modular homes, manufactured homes, or mobile homes.
Businesses, schools, governments and charitable organizations are able to recover
the tax paid on single transactions over the previous cap amount through a rebate
program. The program allows such tax payers a period of up to six (6) months from
the date of the transaction in which to claim the rebate. State Statute restricts the level
of tax information available to municipalities which makes forecasting sales and use
tax revenues very difficult. Growth in sales tax receipts compared to the same period
a year ago were volatile throughout the year. Based on growth of approximately
0.25% in the first ten (10) months of 2013, combined with a slight increase associated
with the slow recovery from the economic downturn and the recent opening of a Bass
Pro Shop in Southwest Little Rock, growth for 2014 was projected to be approximately
1.75%. Net of an anticipated decline in State sales turnback revenues, growth of
approximately 1.5% over the Amended 2013 Budget will be required to meet the 2014
sales tax budget of $96,123,400.
Franchise fees from local utilities comprise approximately 15% of general fund
revenues. Franchise fees from Entergy Corporation, the electric utility, decreased
approximately 1.7% in 2013 and are expected to decrease by 4% in 2014, due
primarily to the discontinuance of a rate adjustment associated with the utility’s exit
from a multi-state agreement in which it had operated for decades to equalize rates
among member states. Storm recovery charges passed on to customers and weather
impact rates and usage. Franchise fees from Centerpoint Entergy, the gas utility,
increased approximately 19% in 2013 with an increase in usage of approximately 15%
after decreasing 22.8% in 2012 primarily due to lower natural gas prices and a 10%
decline in usage. Revenues in 2014 from Centerpoint Entergy are expected to
increase approximately 2.25% from the Amended 2013 Budget. Franchise fees from
telecommunication companies are expected to decrease approximately 3.75% after
several years of decline due to on-going competition from wireless companies. There
are scheduled rate increases included in the budget for Central Arkansas Water and
Little Rock Wastewater. Central Arkansas Water announced a rate increase of
approximately 3.9% in 2013 followed by an additional 4% in 2014. In addition, Little
Rock Wastewater rates increased approximately 8% in 2013, and are scheduled to
increase 7% in 2014 and 4.75% in 2016 to comply with the terms of the Sierra Club
lawsuit to reduce sanitary sewer overflows in Little Rock. Residential customers, on
average, will experience lower rate increases of approximately 2.5% and 4.75% in
2014 and 2016 respectively.
Property Tax revenues account for approximately 14% of General Fund revenues.
Little Rock recently received its Original Charge for 2013 Property Taxes to be
Return to Table of Contents
collected in 2014. The Original Charge is approximately 2.4% over last year’s value
and represents the total amount assessed on real estate and personal property for the
previous year. The 2014 Budget reflects an increase in Property Tax revenues of
approximately 1.7% from the final amended 2013 Budget. In addition, the 2014
Budget and the 2013 Amended Budget include the separate 1-mill property tax levies
dedicated for the Police and Fire Pension Plans as discussed previously. I am pleased
that overall property values in Little Rock were maintained during the recent economic
downturn. The City has not experienced the decline in values that were prevalent in
other parts of the country.
City employees have demonstrated their dedication and professionalism by providing
quality service to the citizens of Little Rock. The General Fund Budget supports 1,669
full-time equivalent (FTE) positions, a net increase of thirty (30) FTEs compared to
2013 staffing levels. The staffing additions include twenty (20) Police positions
previously funded by a grant award under the American Recovery and Reinvestment
Act COPS Program. In addition, special projects and grant awards support forty-one
(41) employees. However, approximately 100 of the budgeted General Fund positions
were vacant during 2013. This represents a significant improvement over the 152
budgeted General Fund positions that were kept vacant in 2011. With the passage of
the new sales tax, positions were filled and new positions were added in 2012 and
2013, particularly in the areas of Public Safety and Parks and Recreation. The 2014
Operating Budget expenditures include $137,290,586 in personnel cost, net of an
anticipated $5 million in savings from authorized but vacant positions. Police, Fire and
AFSCME personnel covered by labor agreements will receive a pay increase of 2.5%.
An allocation for non-uniform non-union employees of 1.5% was included in the
budget as well. Health insurance costs will increase approximately 6.4%, primarily
due to taxes and fees associated with implementation of the Affordable Care Act. The
City is increasing its emphasis on wellness programs again in 2014 to mitigate cost
increases. Employees that do not take advantage of wellness initiatives will share in
the cost of future health insurance benefit increases. Benefit changes approved by
the State Legislature increased pension costs slightly for Fire and Police uniformed
personnel. Pension costs increased from 18.58% to 19.58% of payroll for uniformed
Fire personnel and from 15.23% to 16.23% of payroll for uniformed Police personnel.
In addition, the City merged administration of the closed local Police Pension Fund
with the LOPFI plan which will require an additional contribution of 9.2% of payroll for
uniformed Police personnel. However, the additional contribution will not result in any
additional cost to the City. The dedicated 1-mill property tax levy, annual City sales
tax contribution of $500,000, and other dedicated fines and fees are expected to fund
the 9.2% contribution. Pension costs for Court Clerks decreased slightly from 14.88%
to 14.74%. The City will implement a new defined benefit pension plan for non-uniform
personnel on January 1, 2014. The plan resulted from a yearlong review of options to
improve the retirement plan for non-uniform employees. The City will contribute 9%
of salary to the plan, matched by employee contributions of 4.5%. Vacant positions
are budgeted at the mid-range salary for the position’s grade, providing some budget
flexibility in the recruiting process. Overall, with the changes in salary, benefits and
the increased number of filled positions, the 2014 Budget for personnel cost will
increase approximately 3% from the Amended 2013 Budget. The adjustment to
include the pension contributions to the closed Police and Fire Pension Plans funded
by the separate property tax levies and State Turnback Funds is responsible for an
Return to Table of Contents
increase in personnel cost of approximately 10% from the Original 2013 Budget. The
total increase in personnel cost from the Original 2013 Budget is approximately 13%.
Fleet and fuel costs are projected to decrease approximately $65,000 in 2014. The
2014 Fuel Budget is based on estimated unleaded and diesel fuel per gallon prices
averaging $3.20 and $3.25 respectively. The cost per gallon of fuel has decreased
with the utilization of new fuel blends. In addition, the City is opening a new
Compressed Natural Gas Station (CNG) in 2014 and is converting some vehicles to
CNG. The budget for fleet parts increased due to the aging fleet. However, as the
annual fleet replacement schedule is resumed with the passage of the sales tax, repair
and maintenance cost will be reduced.
The City’s 2014 allocation for outside agency contributions increased by
approximately $326,000 compared with the 2013 Budget. The increase is associated
with the Central Arkansas Transit Authority (CATA) Bus and River Rail operations.
Two (2) new routes were added to bus service in 2013 servicing the John Barrow
Neighborhood and Southwest Little Rock, including Pulaski Technical College.
The City issued a $7.7 million short-term financing note in 2013 to accelerate public
safety projects associated with the three-eighths (3/8)-cent sales tax for capital
projects. Short-term financing notes are authorized under Amendment No. 78 to the
Arkansas Constitution for the acquisition, construction and installation of real and
tangible personal property having an expected useful life of more than one (1)-year.
The notes are repaid over a period of five (5) years from general revenues. The
principal portion of the new note will be repaid with proceeds of the three-eighths (3/8)-
cent sales tax for capital projects. The interest payments are included in the General
Fund Budget. Debt service payments will actually decrease by approximately
$1,073,000 in 2014 due to the retirement of previous short-term notes in 2013.
Funding of the Pulaski County Jail was continued in order to provide space for
prisoners in accordance with the City’s primary focus on Public Safety. In addition, an
extra allocation is available from a $20 local jail fine to contribute toward operations
for expanded Pulaski County Jail space if needed.
A Homeless Services Task Force was established in 2006 to end chronic
homelessness within our community. The City of North Little Rock has partnered with
Little Rock to financially fund the Day Resource Center. The services provided to
homeless individuals and families are focused on finding housing, job referral, and
case management services, medical, dental and psychiatric assistance. In addition,
both municipalities are working with the various support groups in Central Arkansas
as part of the on-going process to address the needs of homeless individuals and
families. In 2011, the City acquired a building on Confederate Boulevard in Little Rock
for a permanent Day Resource Center. The new Jericho Way Day Resource Center
opened in 2013 with continued operating support from Little Rock and North Little
Rock.
The City is appropriating approximately $5.5 million for Children, Youth and Family
Programs, including youth employment, skills center funding, and re-entry
programming in 2014 as part of City’s emphasis to foster and enhance youth and
Return to Table of Contents
community development. City Staff will continue to work with community groups,
neighborhood associations, the faith-based community and other groups to ensure
resources are targeted appropriately. In addition, the City implemented an in-house
pilot program to train and utilize disadvantaged persons for the construction and
maintenance of sidewalks in conjunction with the skills center and re-entry
programming. The program was extremely successful and will be continued in 2014.
In addition, Community Programs Staff is evaluating other opportunities for expansion
of the program utilizing entry-level positions available in other City Departments.
The 2014 Budget includes a contingency allocation of $1 million or .54% of General
Fund revenues. The City of Little Rock’s Management Team will continue to manage
the City in a sound and fiscally prudent manner while striving to deliver the quality and
level of service that the citizens of Little Rock expect with available resources.
2013 Accomplishments
Little Rock Police Department: The Little Rock Police Department was awarded its
sixth certificate of accreditation with the Commission on Accreditation for Law
Enforcement Agencies on March 21, 2013, for an additional three (3) years. This
designation is afforded to premiere agencies and has established the Little Rock
Police Department as a model for other agencies seeking accreditation. Construction
began on the 12
th
Street Station with a completion date of mid-July 2014. The 311
System has greatly increased service delivery to the citizens of Little Rock. A total of
103,581 requests for City services were made utilizing the 311 System. Recruit School
#78 graduated thirty-five (35) new Officers in December 2013. Five (5) Certified Officer
Accelerated Training (C.O.A.T.) Schools were held during 2013, with fourteen (14)
Officers graduating. An additional seven (7) C.O.A.T. applicants are currently being
processed. A Recruit School is scheduled to begin mid-July 2014, with twenty-five
(25) recruits.
Little Rock Fire Department: The Little Rock Fire Department continued to provide
quality services, responding to more than 27,042 fire and emergency calls during
2013. The Department purchased land in Southwest Little Rock for construction of
Fire Station #24. Funding for the land was provided through the City of Little Rock tax
initiative. Divisions of the Fire Department instituted numerous staff training and
outreach programs during 2013 including a Staff Certification Program for Fire
Apparatus Engineers for existing driver operators and Firefighters; instituted a “Don’t
Text and Drive Campaign”; implemented a mass smoke alarm distribution campaign,
distributing smoke alarms to targeted demographics including the elderly and low
income; and conducted service user surveys to evaluate the services of the
organization through performance measures. Other programs instituted by Fire
Administration include the launch of the Junior Fire Cadet Program in conjunction with
the Little Rock School District; implementation of mandatory Post Incident Analysis of
all large loss incidents; and established a Fire Department Chaplaincy Program with
two (2) civilian volunteers to assist the organization when needed. The Department
continues to move forward with the accreditation process through the Center for Public
Safety Excellence.
Return to Table of Contents
Public Works: In 2013, Public Works Operations Staff responded to 7,528 service
requests via the 311 service request system and swept 20,773 curb-miles of streets.
Additionally, staff administered a successful Sidewalk Program, utilizing
disadvantaged citizens re-entering the workforce. Civil Engineering oversaw the
commencement of the first year in a three (3)-year cycle of Capital Sales Tax and
2013 Capital Bond Issuance projects.
Fleet Services: The City of Little Rock Fleet Services Department once again
achieved national recognition as being among the 100 Best Fleets of North America.
Additionally, Fleet Services has continued to work towards opening a publicly
accessible compressed natural gas fueling station, with an anticipated opening of
March 2014.
Finance: The Finance Department obtained the Government Finance Officers
Association (GFOA) Certification of Recognition for the 2013 Budget Presentation and
the GFOA Certificate for Excellence in Financial Reporting for the 2012
Comprehensive Annual Financial Report. The Grants Division provided assistance to
other Departments, component units, non-profit organizations, and neighborhood
organizations of the City in training, writing, obtaining, monitoring and reporting on
grant awards. In addition, the Department provided quarterly reporting to the Little
Rock Citizens Evaluation of New Tax (LRCent) Committee on the status of the new
local sales tax and on progress toward completion of capital projects authorized under
the three-eighths (3/8)-cent portion of the tax. In July 2013, the Finance Department
facilitated the issuance of $58,105,000 in Limited Tax General Obligation Capital
Improvement Bonds for street and drainage improvements. The City’s purchasing
manual was updated and the Finance Department web page was updated to include
helpful documents and detailed tax and revenue information for residents.
Information Technology: The Information Technology Department completed a
Business Continuity Plan for the Department; developed and implemented a web-
based system for the City Impound; assisted the Police Department with the 911
phone system upgrade; and replaced 220 of the oldest PCs on the City network which
benefited all City Departments.
Human Resources: The Human Resources Department implemented a new Defined
Pension Plan for non-uniform employees. Pension enrollment meetings were held for
all impacted employees where employees were notified of their election options. A
new Fair Labor Standards Act questionnaire was developed for employees to
complete as part of their annual performance evaluation. A salary and benefits survey
was conducted. Safety programs were presented. The Department continues to
monitor the Patient Protection and Affordable Care Act (PPACA) to ensure compliance
for the City’s health insurance program that is offered to full-time employees.
Parks & Recreation: The Centre at University Park was opened and dedicated on
September 28, 2013. The new facility is a 15,000 square-foot state of the art building
that includes a webinar room, art and crafts room, ceramics and kiln area, game room,
classrooms, aerobics and dance room with hardwood floor, conference room,
kitchenette, office space, and banquet hall with audio/visual teleconferencing access.
The opening of this facility returned to the community a valuable resource that was
Return to Table of Contents
lost when it burned in October of 2009. In addition, the Hindman Golf Course greens
were reconstructed and reseeded in 2013. The clubhouse was renovated and the
course was reopened to the public on September 12, 2013. The Department launched
its first “on-line” registration opportunity for summer playground participants at all
seven (7) of its playground sites. This program was very successful with over 97% of
the 1,200 program participants enrolling via on-line registration. Little Rock Parks and
Recreation improved its website to make it more user friendly and descriptive of
programs and activities. The Little Rock Marathon increased its participation by 10%.
Parks were maintained at a Class “B” level (mowed one (1) time every ten (10) work
days). In 2013, the Department’s “Lights on After School” initiative was again
successful in that it continues to promote the critical importance of quality afterschool
programs in the lives of children, their families and community. In addition, a detailed
inspection of every playground within the parks system was conducted.
Planning & Development: The Planning & Development Department coordinated
with the City Beautiful Commission and the Board of Directors on the adoption of an
important amendment to the Landscape and Tree Protection Ordinance related to the
Tree Restoration for Environmental Enhancement Fund. In addition, a package of
changes to the Future Land Use Plan for the area south of Interstate 30 was approved.
Nominations of the Dunbar Neighborhood and several structures around the City were
made and listed on the National Register of Historic Places. The 2012 International
Existing Building Code was adopted by the Board of Directors.
Little Rock Zoo: The Little Rock Zoo enjoyed a successful year in 2013. A baby
penguin and four (4) new tiger cubs were born. These births contributed to the survival
of critically endangered species. In addition, the Zoo had strong guest attendance
numbers. The Zoo continued implementation of the 2011 tax referendum by hiring
new staff and completing important new capital projects including an upgrade to the
tiger exhibit, upgrades to Zoo horticulture, a new shade structure for the great ape
exhibit, and other general improvements. The Zoo also acquired two (2) new residents
– elephants Sophie and Babe – from the Niabi Zoo.
Housing & Neighborhood Programs: During 2013, the Housing and Neighborhood
Programs Department hired one (1) Senior Code Enforcement Officer and twelve (12)
new Code Officers. In addition, a training program was implemented for new and
existing Code Officers. Little Rock Animal Village adoptions totaled 1,618 animals
during the year, which is an increase of eighty-nine (89) animals from the previous
year. The Animal Village opened the City’s third dog park during 2013.
Community Programs: The Community Programs Department initiated planning for
Departmental allocation of new revenues in collaboration with community partners.
The Department implemented a summer jobs training component for returning youth
to learn money management skills. In addition, the Department provided staff support
for the Children, Youth, and Families Commission in strategic planning and recognized
all area National Merit Scholars with a reception, program, and certificates.
Vehicle Storage Facility:
The City of Little Rock Vehicle Storage Facility amended
the Little Rock Transportation Code, addressing taxicab driver permit applicants with
a felony conviction in their background. Additionally, staff from the Vehicle Storage
Return to Table of Contents
Facility attended the International Association for Transportation Regulators (IATR)
conference.
Budget Polices and the Budget Process: The General Fund goal was to set aside
the greater of $10,000,000, or 10%, of General Fund revenues in the Restricted
Reserve on or before December 31, 2005; however, due to economic conditions in
the past few years, the City has been unable to meet this goal. The restricted reserve
is currently $9,418,000. The 2014 Budget includes a contingency allocation of an
additional $1 million. Following the completion of the 2013 audit, the City’s
management team will determine the amount of funds available to increase the
reserve, with the intent of gradually increasing the Restricted Reserve to achieve 10%
of General Fund revenues in the next few years.
2014 Goals
In coordination with the Mayor and City Board, staff will have a major focus on
completion of projects funded by the new sales tax. Staff will constantly track,
monitor, and report on capital projects funded by the sales tax and will
maintain a detailed tracking system on the City’s web site, www.littlerock.org.
Continue quarterly review meetings with the Little Rock Citizen Evaluation of
New Tax (LRCent) Committee to review expenditures and progress toward
initiatives supported by the new one (1)-cent sales tax. These meetings will
provide an additional layer of accountability and transparency to tax payers.
Continue to implement the street and drainage sales tax plan for the 2013 -
2015 infrastructure improvement cycle established per the Ward community
meetings.
Complete construction and open the 12
th
Street Police Station.
Execute an agreement to lease or purchase property for the West Little Rock
Police Substation.
Complete the land acquisition for the Southwest Little Rock Fire Station.
Continue the development of the West Central Community Center.
Continue the City’s focus on economic development and sustainability.
Provide $5.5 million in funding for Children, Youth, and Family Programs,
including youth employment, skills center funding, and reentry programming,
to continue the program to train and employ disadvantaged persons for
construction and maintenance of sidewalks, and to explore opportunities for
expanding the program to include other entry level positions.
Continue progress on street and drainage improvement projects funded by the
2013 Capital Improvement Bonds.
Implement the new non-uniform defined benefit pension plan.
Return to Table of Contents
Economic Outlook
The primary challenge facing the City of Little Rock remains providing a full
complement of services that satisfy the needs of citizens in the midst of an uncertain,
but stabilizing, economic climate. While the economic recovery continues, it remains
slow and fragile.
The latest comparative figures for the City of Little Rock show unemployment at 6.7%,
compared with a U.S. average of 7.4%, according to data from the United Stated
Department of Labor, seasonally adjusted for local figures by Metroplan. The United
States economy gained jobs in 2012 and 2013. Per Metroplan, the region’s 2.5%
employment growth from 2012 to 2013 was it strongest showing in over a decade,
bringing total employment to 346,800 - still below its prerecession total of 347,900 in
2008. Little Rock remains a vital employment center, accounting for approximately
53% of all jobs, by place of work, in the Little Rock-North Little Rock metropolitan
areas. A large component of the City’s workforce is in the areas of health care,
education and public administration. These sectors are less vulnerable to national
employment trends.
Little Rock’s housing markets have felt the boom-bust cycle of recent years; however,
they have been less severely affected than the U.S. average. Single-family housing
permits began to rebound during 2012, moving to an average of thirty (30) monthly;
the highest level since 2008. Permits for single-family units were 353 in 2013 after
increasing to 395 in 2012 from 328 in 2011; still far below the 700-plus permits that
occurred annually 2003-2007. Multi-family housing construction slowed in 2013 to
265 units, compared with 1,022 units in 2011. However; on August 1, 2013, Moses
Tucker Real Estate announced plans to redevelop the old Arkla Gas Building in
Downtown Little Rock, converting it into upscale apartments by spring 2015. The $13
million project will be called MacArthur Commons and will include eight-four (84) units
at the corner of East Capitol and River Market Avenues.
Commercial property construction continues to show strong growth. One of the most
exciting developments is the new Bass Pro Shop that opened in Little Rock on
November 13, 2013. The 120,000 square-foot location is at Little Rock’s Gateway
Town Center, a 169-acre project at the northwest corner of Interstates 30 and 430 in
Southwest Little Rock. In addition, plans have been announced to open an outlet mall
at the same location with approximately eighty (80) retail stores, bringing
approximately 1,400 jobs to the area. Construction is expected to begin in the summer
of 2014 with an opening in 2015.
The Central Arkansas Library System opened the Hillary Rodham Clinton Children’s
Library and Learning Center on 10
th
Street in Midtown Little Rock in March 2013. The
30,000 square-foot facility includes a computer lab, greenhouse, teaching kitchen and
theater along with a collection of more than 21,000 books, DVDs and CDs. The library
was funded by a bond issue approved by voters in 2007.
Construction began on a new 72,000 square-foot, $18 million medical office building
in Midtown Little Rock in May 2013. The Midtown Medical Office Building is expected
Return to Table of Contents
to be completed in May 2014. The state-of-the-art medical office will be located on
South University Avenue; an area that has been an anchor for the medical community.
In August 2013, the Little Rock City Board authorized $60 million in bonds for Dassault
Falcon Jet’s expansion at the Bill and Hillary Clinton National Airport. The French
private jet company plans to invest $60 million over the next three (3) years in
refurbishment and new construction at its finishing plant operations at Adams Field.
The new Arcade Building in the River Market opened in the fourth quarter of 2013.
The $17 million project is a joint venture between the Central Arkansas Library System
and Moses Tucker Real Estate and contains retail space, a 325-seat theater, a
restaurant and office space. The building is located at the corner of Clinton and River
Market Avenues. Dr. Bobby Roberts, Central Arkansas Library System Executive
Director, announced an agreement with the Little Rock Film Festival and its institute
to be the host facility for the nationally-acclaimed Little Rock Film Festival.
In October 2013, LM Wind Power, the Danish blade manufacturer for wind turbines,
announced that it would be adding more than 850 jobs to its U.S. manufacturing
operations, which will bring employment at its Little Rock plant to approximately 400.
“The company continues to expand significantly into next year, expecting to employ
around 1,200 people in the US in 2014,” it said. Staff is being added at factories in
Grand Forks, North Dakota and in Little Rock after Congress extended the Production
Tax Credit late last year.
Finally, in December 2013, CARTI held a ground-breaking ceremony for a new $90
million treatment facility adjacent to the Woodland Heights Retirement Community on
Riley Drive in Little Rock. The 170,000 square-foot non-profit Cancer Care Center will
offer medical, surgical and radiation oncology, diagnostic radiology, and hematology
services.
The City’s long-term outlook remains bright; most indicators continue showing
competitive advantages in the local metropolitan area. Job losses in some sectors
have been balanced, even in recession, by gains in areas with future potential. As
indicated above, economic projects are in development in all areas of the City – from
Downtown, to Midtown, Southwest Little Rock and West Little Rock.
Little Rock’s strong business environment and quality of life have been recognized by
several national publications. In July 2013, Little Rock was named “#1 of America’s
10 Great Places to Live” by Kiplinger’s Personal Finance. The rankings place an
emphasis on small and mid-size cities, considering metro areas with a population of
one million or less that have good jobs, reasonably priced homes, decent schools and
access to great health care. Little Rock is very proud of this ranking and features
some of the reasons Little Rock is a great place to live, work, and play on the cover of
this budget document.
In August, Forbes Magazine ranked Central Arkansas #32 on its list of “Best Places
for Business and Careers.” Central Arkansas is recognized for a diverse economy
and being home to companies like Stephens Inc., Windstream Corporation, Acxiom
Return to Table of Contents
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
OVERALL CITY GOALS AND OBJECTIVES
On February 28, 2003, and March 1, 2003, the Mayor and Board of Directors met
in two retreat sessions to develop a strategic policy plan structured around the
goals and objectives of each Board member. After a brainstorming session to
determine the needs of the community the Board of Directors divided their
priorities into two categories: What Must we do? And What should we do? The
Board assigned city staff the task of developing a mission statement, for their
approval, that would bring together the themes of each policy area. The mission
statement and the Board of Director’s policy statements for each strategic policy
area have remained consistent since that time and are outlined below:
Mission Statement
Little Rock’s vision is to be a leading city of the 21
st
Century by providing a safe
and supportive environment that empowers its citizens, neighbors and
businesses to develop and prosper.
Must Do
Policy Statement for a Safe City
It is the policy of the City of Little Rock to protect the rights of the people, ensure
public order, and provide public safety through efficient delivery of services in
addition to requiring the highest level of professional standards.
This shall be accomplished by:
Providing protection through the enforcement of municipal laws
Providing protection from loss or damage of property
Safeguarding individual liberties and implementing community
partnerships to foster cooperation and shared resources from other public
and private agencies
Maintaining and improving community livability through partnerships with
diverse communities by proactively addressing public safety concerns,
which enhance the quality of life for all
Supporting programs that address the issues of children, youth and
families
Striving to ensure the availability and access of adequate, safe and
affordable housing
Striving to improve vehicular and pedestrian safety
Providing disaster assistance in natural and man-made emergencies
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Providing optimum service levels to the public as cost effectively as
possible to maintain a safe, healthy community
Must Do
Policy Statement for Economic Development
It is the policy of the City of Little Rock to support the local/regional economy and
to provide opportunities to retain, form and attract new business.
To accomplish this policy, the City shall:
Support and promote industry and leverage key resources and assets to
attract business interests that offer high-skill/high-wage opportunities for
citizens
Build on the momentum created by public and private investment and
recognize that these efforts promote economic growth for all of Central
Arkansas
Actively develop programs to support small, minority-owned and women-
owned businesses in recognition of the important role of these enterprises
in the creation of jobs and economic opportunities
Must Do
Policy Statement for Basic City Services
It is the policy of the City of Little Rock to ensure citizens receive quality basic
services, and to provide a viable system that enables its employees to give the
most efficient and effective support possible.
The services provided to the citizenry will include:
A comprehensive operational and administrative support system
The collection of solid waste
An efficient drainage and wastewater system
The provision of a clean, healthy water supply
A coordinated and efficient public transit system
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Must Do
Policy Statement for Infrastructure
It is the policy of the City of Little Rock to maintain and improve a comprehensive
infrastructure system that meets the changing needs of the community while
protecting the integrity of the environment.
A comprehensive infrastructure system includes:
Drainage systems
Information technology systems
Public buildings
Solid waste facilities
Streetlights
Streets
Traffic signals
Wastewater facilities
Water systems
Should Do
Policy Statement for Quality of Life
It is the policy of the City of Little Rock to join with community partners to ensure
access to vital and varied recreational, creative and educational experiences.
This will be accomplished to:
Strengthen the fabric of daily living experiences for residents and visitors
alike
Capitalize on Little Rock’s rich natural and cultural resources
Take advantage of the diversity of Little Rock’s citizenry
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Statement of Management Policy
Each year the City Manager develops a Statement of Management Policy to
provide guidance and establish specific parameters for departments to follow
when developing their annual budgets. The Statement of Management Policy is
comprised of common themes from the Board of Directors overall goals and
objectives. It is the City Manager’s responsibility, working in conjunction with
Department Directors, to develop the annual budget around these policy areas in
order to promote efficiency and effectiveness in the delivery of services to the
public.
The 2014 Statement of Management Policy includes these key principles:
Public Safety
Strive to improve public safety through the use of information, education and
community based enforcement strategies to encourage cooperation with and
participation in City safety services. Utilize technology and innovative methods
and techniques in order to produce a safe environment for the Citizens of Little
Rock.
Economic Development
Continue partnerships with private and public agencies in the recruitment of new
business. Pursue innovative approaches to retain existing businesses and
promote the creation of small businesses in the City of Little Rock.
Infrastructure
Focus on the installation and maintenance of streets, drainage, sidewalks, traffic
signals and other capital needs in the City of Little Rock.
Quality of Life
Focus on improving active, passive and leisure activities for citizens and visitors.
Financial Reporting
Continue to provide accurate and timely information on the status of the City’s
financial picture to the Board of Directors and the public. Continue to pursue
innovative techniques to gather and report financial data.
Return to Table of Contents
The Budget Process
City of Little Rock, Arkansas 2014 Operating Budget
THE BUDGET PROCESS
The City’s annual budget is the result of a thorough, public process. The budget
projects all receipts and disbursements, the level of governmental services to be
provided, and the method of distributing cost and services to the various
segments of the community. The budget process includes an evaluation of
community needs and reflects priorities established by the Mayor, the Board of
Directors, and the City Manager. This document serves to inform citizens and
other interested parties of the City’s service plans and overall financial condition.
The Management Team had financial planning work sessions to facilitate budget
and capital project planning. The work sessions focused on revenue outlook,
trends, revenue issues, priority expenditures, expenditure issues, capital projects
and debt for capital projects.
The financial guidelines and policies that serve as the framework for the financial
operation of City government and the basis for budget development are
contained in the financial section of the budget document.
The budget process begins with the City Manager’s assessment of the goals and
initiatives of the Mayor and the Board of Directors. A budget package prepared
by the Finance Department is then distributed to the Department Heads. The
package includes general guidelines from the City Manager with budget reports
that include initial revenue projections, prior year expenditures, current year
budgeted and actual year-to-date expenditures for all operating accounts, a
listing of capital projects, and a budget preparation calendar. The Internal
Services Fund provides projected vehicle maintenance, labor and fuel charges to
each user Department. Budget staff provides training sessions on the budget
process and budget monitoring throughout the year as needed. Departments
submit their expenditure requests to the Finance Department for an initial review.
The City Manager conducts internal budget hearings with each Department to
review goals, projected revenues and expenditures, desired program initiatives,
and capital needs. Budget requests are modified based on the results of the
internal hearings. The Finance Department compiles all of the requests and
recommends any additional modifications necessary in order for the City
Manager to present a balanced budget recommendation to the Mayor for review.
The City Manager reviews program funding recommendations with the Mayor
and discusses associated revenue and expenditure assumptions in detail. The
Mayor and City Manager make modifications to reflect any additional priorities.
The Mayor and City Manager then conduct a budget workshop with the Board of
Directors.
The Capital Budget is usually prepared to present the capital expenditures
planned for each of the next five (5) fiscal years. In 2011, citizens passed a
three-eighths (3/8)-cent sales tax for capital projects that went into effect on
January 1, 2012. The sales tax is a temporary tax with a ten (10) year sunset,
2021. Planned capital expenditures from the sales tax are discussed in detail in
the capital section of the budget document. In addition, capital needs funded by
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
grants or bond issues were considered. The total costs of each project and the
sources of funding required to finance each project are estimated. The FY14
capital requests are considered separately by fund.
The Mayor and City Manager conduct public hearings to obtain input from
citizens. The City utilizes a program-based budget approach for the funds under
the direction of the City Manager.
Approved departmental expenditures are categorized by organizational service
delivery unit, and then presented as costs associated with specific service
programs. This approach allows citizens and their elected representatives to
evaluate the costs of various services, to relate those costs to units of service
delivered, and to set service priorities.
The adopted budget ordinance provides for budgetary control at an
organizational level. Budgets cannot be exceeded without the approval of the
Mayor and Board of Directors.
City Management monitors achievement of program service objectives as
follows:
In regular meetings with department directors by the City Manager and his
staff;
In quarterly reports to the City Manager by department directors;
Through management information system reporting;
Through regular public presentations to the Mayor and Board of Directors;
and
Through meetings with neighborhood organizations and other citizen groups.
Employees are evaluated annually in relation to the performance of designated
services.
Following adoption of the budget, revenue and expenditure budget accounts are
established based on the organizational structure of the City’s financial system.
Monthly and quarterly reports of revenues, expenses and remaining balances are
prepared for the Mayor, Board of Directors and City management. The
availability of budgeted funds is verified before a purchase order is issued, which
then encumbers the budget account.
The 2014 Budget
The 2014 Basic Budget reflects estimated costs for those programs which
were approved or received funding.
Goals
Goals are clear statements of a department’s mission, or purpose. Goals
pinpoint the reasons for the department’s existence and establish
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
department’s direction and responsibility(s). Each department’s objectives
are linked to the dollar figure budget needed to achieve the goal.
Objectives
Objectives are the specific functions, which must be performed in order for
a program to satisfy or fulfill a particular goal.
Objectives are typically expressed in measurable terms so that a
program’s level of accomplishment or performance can be evaluated at
the end of the fiscal year.
The calendar for developing the 2014 budget follows:
June-July Mayor and City Manager provided general direction
and guidance for operating and capital budgets.
August
Initial revenue and personnel costs budgets were
developed, programs were assessed; new
programs and capital budget requests were
submitted.
September Initial health insurance rates and Waste Disposal
rates were assessed.
September-October Department Heads prepared and submitted budget
requests to the City Manager.
October-November City Manager evaluated budget requests. Board
adopted property tax levies.
November-December Budget request was revised. Board held budget
workshop. Board held public hearings.
December Board adopted utility franchise fee rates with no
change from prior year. The Board adopted the
2014 budget ordinance.
AMENDING THE BUDGET
During the fiscal year, adjustments may be required to refine the original adopted
budget. The approved budget may be amended as required in accordance with
the following protocol:
Revenues are reviewed monthly and quarterly and the projections are
adjusted if warranted.
Adjustments to transfer approved expenditure budgets from one organization
to another may be approved by the City Manager if less than $50,000.
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Transfers in excess of $50,000 must be submitted to the Mayor and Board of
Directors for approval.
Requests for new appropriations may be submitted by the City Manager or at
the direction of the Mayor or Board of Directors and require authorization by
Board Ordinance.
Funds Controlled by the City Governing Body
The Funds controlled are:
General;
Special Revenue;
Capital;
Proprietary;
Fiduciary; and
Debt Service.
The City’s financial policies are included in the Financial Structure section.
BUDGET POLICIES
The City has developed and utilized budget policies that are designed to
accomplish specific objectives and enhance the budget process. These policies
include:
The 2014 budget includes 2.5% salary increases for members of the
American Federation of State, County and Municipal Employees (AFSCME),
the International Association of Fire Firefighters and the Fraternal Order of
Police positions, based on agreements in effect under current multi-year
contracts. In addition, step and grade increases are budgeted in accordance
with union agreements. All three (3) union agreements will open for
negotiation in 2014. Salary increases for non-uniform non-union employees
were budgeted at 1.5%.
Vacant positions at the time the budget is adopted are budgeted at the mid-
range salary for the positions’ grade, providing some budget flexibility in the
recruiting process. In addition, an estimated annual savings generated from
vacant positions is included in the budget as a reduction to personnel cost.
As vacancies occur, the savings is utilized to reduce personnel budget
allocations by department.
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
The City utilized the in-house payroll system to aid in the development of the
budget for salary and benefit costs for 2014. Salary changes are budgeted
for each employee group to occur at the required time, such as on the
employee’s anniversary date or at the first of the year.
The Fleet Services Internal Service Fund develops an expenditure budget for
vehicle maintenance and fuel which is allocated to departments based on the
number of assigned vehicles, service history, and prior fuel utilization. These
allocations are not subject to change by the user departments.
Departments are given specific budget parameters by the Mayor and City
Manager. Departments are not allowed to alter calculated personnel cost or
Internal Service Fund budget allocations, and are instructed not to make
funding requests for new programs without the approval of the City Manager.
For 2014, departments were authorized to implement priority needs and
specific new positions supported by the new sales tax, which became
effective in 2012, and to fill key vacant positions.
These policies are designed to ensure that operating departments have sufficient
funds available to support programs and services, and to mitigate the need for
budget reductions during the course of the fiscal year.
OTHER BUDGET PROCEDURES
The preceding budget procedures apply to the development of the budget for the
General Government operating funds, and the Proprietary, Special Projects and
Capital funds. These funds are under the direct guidance of the City Manager.
Special Revenue funds’ budgets are developed internally by staff. The
Community Development Block Grant and Home Investment Partnership
Program budgets are developed in accordance with specific federal guidelines,
including obtaining required citizen input, and are then presented to the Mayor
and Board of Directors for final approval.
Component Units develop separate budgets for approval by their respective
governing board or commission. These budgets do not require submission to the
Mayor and Board of Directors for approval. The Fiduciary retirement funds do
not prepare formal budgets, but the associated boards of trustees regularly
monitor the income and expenditures of the funds.
Annual budgets are adopted on a basis consistent with accounting principles
generally accepted in the United States of America. Governmental funds are
reported using the current financial resources measurement focus and the
modified accrual basis of accounting.
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
The basis of budgeting and the basis of accounting used in the City’s audited
financial statements are the same. Appropriations lapse at the end of the each
year. With this measurement focus, only current assets and liabilities are
generally included on the balance sheet. The statement of net assets presents
increases (revenues and other financing sources) and decreases (expenditures
and other financing uses) in spendable resources. General capital asset
acquisitions are reported as expenditures and proceeds of general long-term
debt are reported as other financing sources. Under the modified accrual basis
of accounting, revenues are recognized when both measurable and available.
The City considers revenues reported in the governmental funds to be available if
they are collectible within sixty days after year-end. Principal revenue sources
considered susceptible to accrual include taxes, federal funds, local funds and
investment earnings. Other revenues are considered to be measurable and
available only when cash is received by the City. Expenditures are recorded
when the related fund liability is incurred, except for principal and interest on
general long-term debt, claims and judgments, compensated absences and
obligations for workers’ compensation, which are recognized as expenditures
when payment is due. Pension expenditures are recognized when amounts are
due to a plan.
Operating revenues and expenditures are distinguished from non-operating
items. Operating revenues and expenses generally result from providing
services in connection with the principal ongoing operation of the fund. All
revenues and expenses not meeting this definition are reported as non-operating
items.
Appropriations for special projects are budgeted as transfers to a special project
fund by the Mayor and Board of Directors. These allocations are used to finance
specific initiatives or capital projects. Special projects are generally multi-year
activities that are monitored until they are fully expended or repealed by the
Mayor and Board of Directors. At the conclusion of the special initiative or capital
project, remaining allocations are returned to the fund that originally sponsored
the project. Examples of such projects are allocations for homeless prevention,
weed lot maintenance, demolition, and the Mayor’s Youth Council.
Return to Table of Contents
Financial Structure
City of Little Rock, Arkansas 2014 Operating Budget
LITTLE ROCK'S FINANCIAL STRUCTURE
Cities in Arkansas derive the authority to levy taxes and provide municipal
services from state statutes. Little Rock's financial structure utilizes fund
accounting, which separates the transactions related to various City functions
and is designed to demonstrate compliance with legal requirements. Certain
funds are controlled directly by the City's governing body, and other funds are
controlled by agencies whose assets are owned by the City but are operated by
independent boards and commissions.
FUNDS CONTROLLED BY THE CITY GOVERNING BODY
GENERAL FUND OPERATIONS
General Fund - This fund is the primary operating fund of the City and
receives all revenues not required to be accounted for separately. In
addition to funding traditional government services, annual appropriations
are made from this fund for various outside agencies that perform services
on behalf of the City, for special projects, and for limited capital
improvements.
SPECIAL REVENUE FUNDS
Street Fund This is a special revenue fund that includes income
restricted for street and traffic maintenance, such as the state gasoline tax
turnback and one-half of a County road property tax. In addition, parking
meter revenues and reimbursement for street cuts are reported in this
fund.
Special Projects Fund This fund receives certain revenues and
appropriations for special purposes or for capital projects that generally
have a multi-year life.
Infrastructure Fund This fund was established to commit resources for
the improvement and maintenance of the City's infrastructure.
Emergency 9-1-1 Fund This fund contains fees derived from telephone
charges, which are restricted to uses related to operating and equipping
the City’s 9-1-1 Emergency Operations Center.
Grant Fund Various Federal and State Grant awards are reported in
this fund.
Community Development Block Grant Fund This fund receives
Federal block grants utilized primarily for street improvements, community
services and community center operations.
Neighborhood Housing Special Project Fund (NHSP) This fund
accounts for the proceeds of the Community Development Block Grant
Section 108 Guaranteed Loan Program and other City funds that are
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
utilized to provide housing and housing assistance to qualifying citizens
and to improve neighborhood infrastructure.
Home Investment Partnership Fund (HIPP) – This fund accounts for
funding received from the U.S. Department of Housing and Urban
Development to provide housing or housing assistance to qualifying
citizens, to improve neighborhood streets and drainage, and to operate
community health and recreation facilities.
CAPITAL PROJECT AND RELATED DEBT SERVICE FUNDS
Capital Projects Funds – These funds are derived from the proceeds of
general obligation bonds issued to finance major capital improvement
projects.
Debt Service Funds – The City’s general obligation bonds are primarily
supported by separate property tax levies approved by taxpayers for the
sole purpose of retirement of debt issued to fund capital improvement and
construction projects. The proceeds of the special levies are accounted for
in debt service funds to be utilized for this purpose. There is a
corresponding capital projects fund established for each bond issue.
2002 Capital Improvement Junior Lien Revenue Bonds – The 2002
Capital Improvement Junior Lien Revenue Bonds were issued to finance
infrastructure improvements, the costs of issuance, and to fund the debt
service reserve. These bonds are special obligation bonds of the City,
payable solely from the franchise fees collected from public utilities for the
privilege of utilizing the streets, highways and other public places within
the City.
2007 Capital Improvements – The 2007 Capital Improvements were
issued to finance the advance refunding of the City’s Capital Improvement
Revenue Bonds 1998A and to pay the cost associated with the issuance
of the Series 2007 Bonds. The Series 2007 bonds are not general
obligations of the City but are special obligations payable solely from the
revenue received by the City from all franchise fees charged to public
utilities for the privilege of utilizing the City’s streets and right-of-way.
The remaining funds available from interest earnings on these bond funds
have been allocated to the South Loop and Scott Hamilton Drive
improvements.
2008 and 2009 Central Library and Improvement Fund – 2008 and
2009 Library Improvement and Refunding Bonds are limited obligations
payable through 2028. The Library Bonds were issued to finance the cost
of acquiring, constructing, and equipping capital improvements to the
public City libraries operated by the Central Arkansas Library System.
The bonds are limited tax obligations payable solely from a 1.0 mill annual
ad valorem tax.
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
2009A Capital Improvement Construction Revenue Bonds and 2009B
Parks and Recreation Capital Improvement Refunding Bonds – The
2009A Parks and Recreation Bonds were issued for the purposes of
acquiring, constructing, equipping, renovating, expanding, and
refurbishing certain zoo, parks, and recreation facilities of the City. The
2009B Bonds were issued for the purpose of refunding the City’s
outstanding Capital Improvement Revenue Bonds (Parks and Recreation
Projects) Series 1998A. The 2009A and 2009B bonds are special
obligations, payable solely from the revenues derived from the operation
and ownership of the zoo, parks and recreation facilities.
2012 Library Construction and Refunding Bonds – 2012 Library
Construction and Refunding Bonds are limited obligations payable through
2032. The Library Bonds were issued to finance the cost of acquiring,
constructing, and equipping capital improvements to the public City
libraries operated by the Central Arkansas Library System, to refund the
City’s outstanding Library Construction Bonds, Series 2004A, and to pay
the cost of issuance of the bonds. The bonds are limited tax obligations
payable solely from a 0.9 mill annual ad valorem tax.
2012 – 2021 Capital Project Fund – This fund is utilized to account for
the proceeds of a 3/8 cent ten (10) year capital tax to fund new Fire and
Police facilities, a new emergency communications system, economic
development infrastructure, including improvements at the port and
funding for a technology park, capital improvements for Park and Zoo
facilities, information technology projects and vehicles and equipment.
The tax went into effect on January 1, 2012 and expires on December 31,
2021.
2013 Limited Tax General Obligation Capital Improvement Bonds
On September 11, 2012, citizens of Little Rock approved the issuance of
$105 million in Capital Improvement Bonds for the purpose of Street and
Drainage infrastructure improvements. The 2013 Limited Tax General
Obligation Capital Improvement Bonds in the amount of $58,105,000
issued July 24, 2013 were the first series of bonds issued for this purpose.
These bonds are secured by all proceeds derived from a separate 3-mills
annual ad valorem tax on all taxable real and personal property located
within the City.
Short Term Financing – This fund accounts for proceeds of Short Term
Financing notes issued to acquire capital equipment, building
improvements and vehicles for the City.
PROPRIETARY FUNDS
Waste Disposal Enterprise Fund – This fund was created to account for
the City’s solid waste system.
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Vehicle Storage Facility Enterprise Fund This fund was created to
account for vehicle storage services.
Fleet Internal Services Fund This fund utilizes a flexible budget and
derives its revenues primarily from charges to the organizations in the
General, Street and Waste Disposal Funds that utilize City vehicles.
Parking Garage Fund This fund was created to account for the
operations of the City’s two parking garage facilities.
FIDUCIARY FUNDS CONTROLLED BY BOARDS OF TRUSTEES
An important benefit for City employees is a retirement plan. The City
participates in the state Local Police and Fire Retirement System (LOPFI) for all
uniformed employees hired after January 1, 1983. In addition, the following
retirement funds are administered by the City and cover substantially all other
employees:
Firemen's Relief and Pension Fund
Policemen's Pension and Relief Fund
Non Uniform Defined Contribution Pension Fund
Non Uniform Defined Benefit
Pension Health Management Trust Fund
All pension funds receive contributions from both employees and the City. The
Firemen and Policemen's funds also receive a dedicated property tax levy and
insurance turn back revenues. Each fund has a Board of Trustees that directs its
activities.
DISCRETE COMPONENT UNITS CONTROLLED BY INDEPENDENT
BOARDS & COMMISSIONS
Certain City services are similar to activities found in the private sector. They
have independent Boards and Commissions. They are budgeted and accounted
for as separate entities and are expected to maintain revenues sufficient to meet
their operating costs, debt service requirements, and system replacement and
maintenance needs. These funds are listed below but are not included in this
document:
Little Rock Wastewater Utility
Little Rock National Airport
Little Rock Advertising & Promotion Commission
Little Rock Port Authority
Metropolitan Emergency Medical Services (MEMS)
Central Arkansas Transit Authority
Arkansas Museum of Discovery
Arkansas Arts Center
Central Arkansas Library System
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Oakland Fraternal Cemetery
Mt. Holly Cemetery
These funds receive income from service charges that are used to operate their
respective facilities and to retire revenue bonds. In addition, a 2% Hotel, Motel,
and Restaurant Sales Tax provides the main source of income to operate the
Advertising and Promotion Commission and retire its bonds. Boards and
Commissions, which derive their authority from specific statutes, operate all of
these funds. However, the City's governing body must authorize rate changes,
approve all bond issues, and approve appointments to the Boards and
Commissions. Therefore, these funds are required to be reported as discrete
component units of this entity by GASB Statement Number 39.
OTHER FUNDS NOT INCLUDED
This budget does not include the Little Rock School District, which is governed by
its own elected board, is a separate taxing authority, issues its own debt and
receives no City subsidy. Certain other funds are not included, because they
operate under independent Boards, have other sources of revenue, and are in no
way dependent upon the Mayor and Board of Directors. These are as follows:
Little Rock Housing Authority
Little Rock Residential Housing and Facilities Board
Central Arkansas Water
In addition, this budget does not include certain multiple-employer, defined
benefit pension funds administered and trusted by independent fiduciary agents
and in which certain employees participate.
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
FISCAL POLICIES
A. OPERATING MANAGEMENT
1. All City departments share in the responsibility of meeting policy goals
and ensuring long-term financial health. Future service plans and
program initiatives will be developed to reflect current policy directives,
projected resources, and future service requirements. When appropriate,
sunset provisions will be incorporated into service plans.
2. The budget process is intended to weigh all competing requests for City
resources. Requests for new, on-going programs made outside the
budget process are discouraged.
3. Addition of personnel will only be requested to meet program initiatives
and policy directives; after service needs have been thoroughly examined
and it is substantiated that additional staffing will result in increased
revenue or enhanced operating efficiencies. To the extent feasible,
personnel cost reductions will be achieved through attrition.
4. Current expenditures will be funded by current revenues. A diversified
and stable revenue system will be developed to protect programs from
short-term fluctuations in any single revenue source.
5. No revenues will be dedicated for specific purposes, unless required by
law or generally accepted accounting practices (GAAP). All non-restricted
revenues will be deposited in the General Fund and appropriated by the
budget process.
6. User fees and charges will be examined annually to ensure that all direct
and indirect costs of provided the service are recovered. If the user fees
and charges required to meet full cost recovery would be excessively
burdensome on citizens receiving service, the Board of Directors may
approve a lower user fee or charge. The City will consider market rates
and charges levied by other public and private organizations for similar
services in establishing rate and fee structures. Rate adjustments for
Waste Disposal will be based on five-year financial plans.
7. Grant funding should be considered to leverage City funds. Inconsistent
and /or fluctuating grants and trusts should not be utilized to fund on-
going programs. Programs financed with grant moneys will be budgeted
in separate cost centers, and the service program will be adjusted to
reflect the level of available funding. In the event of reduced grant
funding, City resources will be substituted only after all program priorities
and alternatives are considered during the budget process.
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
8. All grants and other Federal and State funds shall be managed to comply
with the laws, regulations, and guidance of the grantor, and all gifts and
donations shall be managed and expended according to the wishes and
instructions of the donor.
9. Fleet replacement will be accomplished through the use of a “rental” rate
structure. The rates will be revised annually to ensure that charges to
operating departments are sufficient for operation and replacement of
vehicles.
10. Balanced revenue and expenditure forecasts will be prepared to examine
the City’s ability to absorb operating costs due to changes in the
economy, service demands, and capital improvements. The forecast will
encompass five years and will be updated annually.
11. Comparison of service delivery will be made to ensure that quality
services are provided to our citizens at the most competitive and
economical cost. Departments will identify all activities that can be
provided by another source and review alternatives to current service
delivery. The review of service delivery alternatives will be performed
continually. During the annual budget process, funding for outside
Agencies, FUTURE-Little Rock, and special projects will be evaluated.
12. To attract and retain employees necessary for providing high quality
services, the City shall establish and maintain a very competitive
compensation and benefit package with that of the public and private
sectors.
13. The City will follow an aggressive and professional policy of collecting
revenues.
14. In each annual budget, the City may authorize a transfer from one fund to
another for one or more special projects. Expenditures from the special
project shall be consistent with the purpose of the special project.
Unspent appropriations for special projects shall carry forward into the
next fiscal year. Unspent special project appropriations remaining on
June 30 in the next fiscal year shall be returned to the fund of origin
unless the City Manager authorizes continuation of the special project.
15. The City will strive to maintain fair and equitable relationships with
contractors and suppliers.
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
B. CAPITAL MANAGEMENT
1. A five-year Capital Improvement Plan will be developed biannually and
updated annually, including anticipated funding sources. Capital
improvement projects are defined as infrastructure or equipment
purchases or construction that results in a capitalized asset costing more
than $5,000 and having a useful life (depreciable life) of two years or
more.
2. The capital improvement plan will include, in addition to current operating
maintenance expenditures, an adequate level of funding for maintenance
and replacement to ensure that all capital facilities and equipment are
properly maintained.
3. Proposed capital projects will be reviewed by a cross-departmental team
for accurate costing (design, capital, and operating), congruence with City
objectives and prioritized by a set of deterministic criteria. Financing
sources will be sought for the highest-ranking projects.
4. Capital improvement operating budget impacts will be coordinated with the
development of the annual operating budget. Future operating,
maintenance, and replacements costs will be forecast as part of the City’s
five-year financial forecast.
5. The City will provide for a minimum of 5% of internal, pay-as-you-go
financing for its Capital Improvement Program. Funding may come from
fund balance reserves or any other acceptable means.
C. DEBT MANAGEMENT
1. The City will seek to maintain and, if possible, improve its current bond
rating in order to minimize borrowing costs and preserve access to credit.
The City will encourage and maintain good relations with financial bond
rating agencies and will follow a policy of full and open disclosure.
2. Future bond issue proposals will be accompanied by an analysis showing
how the new issue combined with current debt impacts the City’s debt
capacity and conformance with City debt policies.
3. The City will attempt to develop a coordinated communication process
with all other overlapping jurisdictions with which it shares a common tax
base concerning collective plans for future debt issues.
4. Financing shall not exceed the useful life of the asset being acquired.
5. The City will not use long-term debt to finance current operations.
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
6. The general policy of the City is to establish debt repayment schedules
that utilize level annual principal and interest payments.
7. The general policy of the City is to fund capital projects (infrastructure)
with new, dedicated streams of revenue or voter approved debt. Nonvoter
approved debt may be utilized when a dedicated revenue source other
than general revenue can be identified to pay debt service expenses.
8. Interest earnings on bond proceeds will be limited to 1) funding the
improvements specified in the authorizing bond ordinance, or 2) payment
of debt service on the bonds.
9. Utility rates will be set to ensure debt service coverage exceeds the bond
indenture requirement of 125%.
10. The City shall comply with the Internal Revenue Code Section 148 –
Arbitrage Regulation for all tax-exempt debt issued. An annual estimate
of arbitrage liabilities shall be obtained by the City and recorded on the
financial statements.
11. The City shall use a competitive bidding process in the sale of debt unless
the use of a negotiated process is warranted due to market timing
requirements (refunding), or a unique pledge or debt structure. The City
will award competitively issued debt on a true interest cost (TIC) basis.
12. Proceeds from debt will be utilized in accordance with the purpose of the
debt issue. Funds remaining after the project is completed will be used in
accordance with the provisions stated in the bond ordinance that
authorized the issuance of the debt.
D. RESERVES
1. All fund designations and reserves will be evaluated annually for long-term
adequacy and use requirements in conjunction with development of the
City’s five-year financial plan.
2. The General Fund goal is to set aside $10,000,000 or 10% of General
Fund revenues; whichever is greater, into a restricted reserve fund on or
before December 31, 2005; however, due to economic conditions in the
past several years, the City has not been able to meet their goal. The
restricted reserve is currently $9,418,000. The Board will consider
increasing the restricted reserve based on the net operating results for
2013.
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
3. Each annual operating budget will include a contingency appropriation in
the General Fund sufficient to provide for unforeseen needs of an
emergency nature for that year. The desired level of the contingency
appropriation each year shall be based on the average of the three prior
years’ experience levels but no less than .5% of General Fund revenue for
the current fiscal year.
4. The Waste Disposal Fund will maintain an unrestricted retained earnings
reserve of no less than 15% of current year revenues.
5. Fleet Management reserves will be maintained based upon lifecycle
replacement plans to ensure adequate fund balance required for
systematic replacement of fleet vehicles. Operating departments will be
charged for fleet operating costs per vehicle class and replacement costs
spread over the useful life of the vehicles.
6. Self-insurance reserves will be maintained at a level that, together with
purchased insurance policies, will adequately indemnify the City’s property
and liability risk. A qualified actuarial firm shall be retained on an annual
basis in order to recommend appropriate funding levels.
7. A Facility Maintenance Reserve will be maintained based upon lifecycle
replacement plans to ensure adequate funding for infrastructure repair and
operating equipment replacement (HVAC, roofing, etc.).
E. CASH MANAGEMENT AND INVESTMENTS
1. Cash and investment programs will be maintained in accordance with the
City Charter and the adopted investment policy and will ensure that
proper controls and safeguards are maintained. City funds will be
managed in a prudent and diligent manner with an emphasis on safety of
principal, liquidity, and financial return on principal, in that order.
2. The City will maintain written guidelines on cash handling, accounting,
segregation of duties, and other financial matters.
3. The City will conduct periodic reviews of its internal controls and cash
handling procedures.
4. The City will annually identify and develop an Internal Audit Work plan.
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
F. ACCOUNTING, AUDITING AND FINANCIAL REPORTING
1. The City’s accounting and financial reporting systems will be maintained
in conformance with generally accepted accounting principles (GAAP)
and the standards set by the Governmental Accounting Standards Board
(GASB) and the Government Finance Officers Association (GFOA).
2. An independent public accounting firm will perform an annual audit. The
auditor’s opinion will be included with the City’s published
Comprehensive Annual Financial Report (CAFR).
3. The City’s CAFR will be submitted to the GFOA Certification of
Achievement for Excellence in Financial Reporting Program. The
financial report should be in conformity with GAAP, demonstrate
compliance with finance related legal and contractual provisions provide
full disclosure of all financial activities and related matters, and minimize
ambiguities and potentials for misleading inference.
4. The City’s budget document will be submitted to the GFOA Distinguished
Budget Presentation Program. The budget should satisfy criteria as a
financial and programmatic policy document, as a comprehensive
financial plan, as an operations guide for all organizational units and as a
communications device for all significant budgetary issues, trends and
resources.
5. Financial systems will be maintained to monitor revenues, expenditures,
and program performance on an ongoing basis.
6. Monthly and quarterly reports shall be prepared and presented to the
Board of Directors on a timely basis.
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
OTHER AGENCIES
One of the budget policies of the Mayor and Board of Directors is to support
other agencies that provide services that are important to the City’s quality of life.
The agencies that have had City support are described below:
The Arkansas Arts Center, located in a City park, serves the metropolitan area
and provides a wide array of cultural opportunities to citizens of all ages and
interests.
The Arkansas Museum of Discovery enhances the cultural opportunities in the
metropolitan area and has opened a new and larger museum located in the River
Market District. This project was funded through the FUTURE-Little Rock
initiatives and is now funded from the General Fund.
The Central Arkansas Transit Authority provides vital public transportation
services to much of the metropolitan area.
The Chamber of Commerce promotes economic growth in the area, and is
another example of a public and private partnership.
The County Health Department provides health care services to residents of
both the City and Pulaski County. The State Health Department directs its
operations. It receives operating support from both the City and the County.
The Downtown Partnership promotes economic development for downtown
and is an example of public and private partnerships to promote growth and
development of the City.
Metroplan is a council of local governments that provides area-wide
transportation and other planning and support services to its members.
County Regional Detention Center serves the residents of both the city and
Pulaski County. The County directs its operations and it receives operating
support from the City and all jurisdictions in the County.
The Pulaski Area Geographical Information System (PAGIS) is a consortium
of local government agencies formed by inter-local agreement to develop,
maintain and distribute spatial based information and graphics. Current members
are Little Rock, North Little Rock, Pulaski County, Central Arkansas Water and
Wastewater commissions of Little Rock and North Little Rock.
Jack Stephens Youth Golf Academy/First Tee of Central Arkansas has a
nine (9) hole regulation golf course, nine (9) hole par three (3) golf course, full-
service driving range, practice putting green, full-service pro shop and indoor
teaching facilities. The purpose of this facility is to impact the lives of the young
people of Central Arkansas by providing educational programs that build
character, instill life-enhancing values and promote healthy choices through the
game of golf. The facility provides an opportunity for Central Arkansas’ young
people to learn the game of golf regardless of their socio-economic status.
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
The Metro Little Rock Alliance (MLRA) is a twelve-county economic
development organization representing a population of a million people including
Little Rock. It was created to cultivate regional growth and prosperity throughout
the area. The MLRA markets Little Rock and the region’s strengths and
advantages to prospective companies and the site location consultants for the
purpose of attracting investment and creating jobs.
Little Rock City Beautiful Commission promotes public interest in the general
improvement of the appearance of the City of Little Rock; and establishes,
subject to the Little Rock City Board of Directors approval, regulations of
aesthetic quality for public and private lands and improvements.
APPROPRIATIONS FOR OTHER AGENCIES
2012 2013 2014
Budget Budget Budget
Central Arkansas Transit $7,511,153 $8,208,468 $8,534,663 (1)
County Regional Detention Center 1,463,000 1,050,000 1,050,000 (2)
Arkansas Arts Center 300,000 400,000 400,000
Museum of Discovery 200,000 200,000 200,000
Chamber of Commerce 200,000 200,000 200,000
Metroplan 163,484 178,042 178,042
Downtown Partnership 125,000 160,000 160,000
PAGIS 129,500 136,300 135,800
Metro Little Rock Alliance 100,000 100,000
First Tee 99,750 91,500 91,500 (3)
County Bond Payment 56,100 56,100 56,100
St. Vincent 25,381 25,381 25,381
LR City Beautiful Commission 2,500 2,500 2,500
Total $10,275,868 $10,808,291 $11,133,986
(1) The 2013 CATA increase is primarily associated with two new routes.
(2) The allocation for the jail was reduced by $413,000 to the amount required by the
interlocal agreement. The difference in jail funding is made up by the allocation of
funds available from a $20 local jail fine available for supplemental jail funding.
(3) Adjusted to reflect the consolidation of the Park and Zoo Enterprise Funds with
the General Fund and includes the Golf contribution to First Tee.
Return to Table of Contents
This page left blank intentionally.
Return to Table of Contents
Budget Summaries
City of Little Rock, Arkansas 2014 Operating Budget
BUDGET SUMMARIES
The following schedules summarize the audited 2012 operating results, the 2013
unaudited operating results, and the approved 2014 operating budget. The
summaries are organized by fund type in a manner that is consistent with the
fund organization in the City’ audited Comprehensive Annual Financial Report.
The first summary is a recap of the entire six (6) fund types included in this
section. Each of the fund types is summarized and individual fund budget
schedules follow the summaries. The amounts reflected in this section are
accumulated as follows: individual fund totals are included in the fund type
summary; then the fund type summary totals are included in the recap of all fund
types.
The City is required by state statue to budget for the administration, operation,
maintenance and improvements of various City operations. The budget is
designed to demonstrate compliance with legal requirements. Other funds
submitted are for informational purposes only.
The Cities operating budget includes the following funds:
General;
Street;
Fleet Services;
Vehicle Storage Facility;
Waste Disposal;
Parking Garages;
The six types of funds included in the budget summaries are:
General;
Special Revenue;
Capital;
Proprietary;
Fiduciary; and
Debt Service.
For more information regarding these funds, see the section entitled FINANCIAL
STRUCTURE.
Return to Table of Contents
Enterprise Fleet
General Street Funds Services Total
Revenues
General Property Taxes $26,548,180 $5,473,400 $32,021,580
Sales Taxes 96,123,400 96,123,400
License and Permits 10,509,200 291,240 10,800,440
Intergovernmental 6,353,442 12,100,000 18,453,442
Charge for Service 11,245,641 10,000 20,834,217 13,144,531 45,234,389
Fines and Fees 3,199,875 0 3,199,875
Utility Franchise Fees 27,686,000 27,686,000
Investment Income 50,000 5,000 10,100 65,100
Miscellaneous 767,900 50,000 450 818,350
Transfers In 1,780,892 1,725,296 0 3,506,188
Total Revenues 184,264,530 19,363,696 21,136,007 13,144,531 237,908,764
Expenditures
Personnel 137,290,586 9,983,570 5,994,339 3,686,321 156,954,816
Supplies and Material 6,403,155 1,176,055 1,713,850 6,694,650 15,987,710
Repairs and Maintenance 6,796,658 2,784,328 3,165,484 249,875 12,996,345
Contractual 20,914,528 2,890,856 5,101,066 2,399,642 31,306,092
Closure/Post Closure 247,945 247,945
Capital Outlay 380,000 1,680,000 2,060,000
Depreciation and Amortization 2,306,200 105,200 2,411,400
Debt Service 1,323,343 737,900 2,061,243
Transfers Out 11,156,260 848,887 1,934,459 13,939,606
Total Expenditures 184,264,530 19,363,696 21,201,243 13,135,688 237,965,157
Net Change in Fund Balance 00(65,236) 8,843 (56,393)
Fund Balances - Beginning 18,374,206 3,600,174 15,984,256 2,332,682 $40,291,318
Fund Balances - Ending $18,374,206 $3,600,174 $15,919,020 $2,341,525 $40,234,925
2014 Operating Funds Budget Summaries
This presentation includes restricted reserves of $9,418,000 in the General Fund.
$0
$20,000,000
$40,000,000
$60,000,000
$80,000,000
$100,000,000
$120,000,000
$140,000,000
$160,000,000
$180,000,000
$200,000,000
General
Fund
Street Fund Enterprise
Funds
Fleet
Services
Fund
Revenues
Expenditures
Return to Table of Contents
Police
$67,200,859
36.47%
All Other
$23,397,750
12.70%
Property
Taxes
$26,548,180
14.41%
Utility
Franchises
$27,686,000
15.03%
Sales Taxes
$96,123,400
52.17%
Transfers
$11,156,260
6.05%
General
Government
$20,296,290
11.01%
Fire
$45,774,586
24.84%
Uses of Funds
for 2014
Sources of Funds
for 2014
FY 2014 GENERAL FUND
Parks &
Recreation
$9,739,691
5.29%
All Other
$23,608,043
12.81%
Zoo
$6,488,801
3.52%
Licenses &
Permits
$10,509,200
5.70%
Return to Table of Contents
INTERNAL DEBT
GENERAL SPECIAL CAPITAL ENTERPRISE SERVICE FIDUCIARY SERVICE
FUNDS REVENUES PROJECTS FUNDS FUND FUNDS FUNDS
2012
REVENUES: 196,082,270$ 39,633,877$ 61,899,058$ 24,319,986$ 11,732,606$ 34,019,862$ 31,150,221$
EXPENDITURES: 195,599,930 40,410,520 31,347,931 21,295,584 11,622,523 28,389,047 30,210,264
REVENUES OVER (UNDER)
EXPENDITURES 482,340 (776,643) 30,551,127 3,024,402 110,083 5,630,814 939,957
BEGINNING FUND BAL. 26,008,156 10,594,449 16,495,598 13,535,123 2,472,599 172,189,782 19,641,764
ENDING FUND BAL. 26,490,496$ 9,817,806$ 47,046,724$ 16,559,523$ 2,582,682$ 177,820,596$ 20,581,722$
2013
REVENUES: 200,733,159$ 33,238,619$ 85,931,375$ 20,586,264$ 12,616,069$ 37,190,403$ 21,073,296$
EXPENDITURES: 192,844,806 34,834,404 34,135,027 21,161,533 12,866,069 72,973,792 21,470,896
REVENUES OVER (UNDER)
EXPENDITURES 7,888,353 (1,595,786) 51,796,348 (575,269) (250,000) (35,783,389) (397,600)
BEGINNING FUND BAL. 26,490,496 9,817,807 47,046,724 16,559,525 2,582,682 177,820,596 20,581,721
ENDING FUND BAL. 34,378,849$ 8,222,021$ 98,843,072$ 15,984,256$ 2,332,682$ 142,037,207$ 20,184,121$
2014
REVENUES: 184,264,530$ 19,363,696$ -$ 21,136,007$ 13,144,531$ -$ -$
EXPENDITURES: 184,264,530 19,363,696 - 21,201,243 13,135,688 - -
REVENUES OVER (UNDER)
EXPENDITURES - - - (65,236) 8,843 - -
BEGINNING FUND BAL. 34,378,849 8,222,021 98,843,072 15,984,256 2,332,682 142,037,207 20,184,121
ENDING FUND B
AL. 34,378,849$ 8,222,021$ 98,843,072$ 15,919,020$ 2,341,525$ 142,037,207$ 20,184,121$
CITY OF LITTLE ROCK
BUDGET SUMMARY BY FUND TYPE
FOR YEARS 2012 - 2014
Return to Table of Contents
ADOPTED
ACTUAL AMENDED BUDGET
2012 (1) 2013 (1) 2014
GENERAL FUND
REVENUES: 180,242,907$ 180,889,549$ 184,264,530$
EXPENDITURES: 186,408,597 180,889,549 184,264,530
REVENUES OVER (UNDER)
EXPENDITURES (6,165,690) - -
BEGINNING FUND BALANCE 24,539,896 18,374,206 18,374,206
ENDING FUND BALANCE 18,374,206$ 18,374,206$ 18,374,206$
SPECIAL PROJECTS & SEIZED MONEY FUND
REVENUES: 15,839,363$ 19,843,610$ -$
EXPENDITURES: 9,191,332 11,955,257 -
REVENUES OVER (UNDER)
EXPENDITURES 6,648,031 7,888,353 -
BEGINNING FUND BALANCE 1,468,260 8,116,291 16,004,644
ENDING FUND BALANCE 8,116,291$ 16,004,644$ 16,004,644$
TOTAL BEGINNING FUND BALANCE 26,008,156$ 26,490,496$ 34,378,849$
TOTAL REVENUES 196,082,270 200,733,159 184,264,530
TOTAL EXPENDITURES 195,599,930 192,844,806 184,264,530
TOTAL ENDING FUND BALANCE 26,490,496$ 34,378,849$ 34,378,849$
The City of Little Rock utilizes a program budget for public information purposes and for Mayor & Board
consideration. Line item information is principally used for budgetary management and control
purposes.
GENERAL GOVERNMENT SUMMARY
OPERATING BUDGET
2012 - 2014
The sources of operating revenue and the trends affecting them are discussed in the section of the
budget titled REVENUES. The details of the operating budget by department and by service program
are contained in the section of the budget titled EXPENDITURES. The transfers out primarily consist
of appropriations for special projects and appropriations for the FUTURE Little Rock and new sales
tax initiatives.
(1) Numbers have been adjusted to reflect the consolidation of the River Market, Golf, Fitness and
Aquatics Center, and Zoo Enterprise Funds with the General Fund.
Return to Table of Contents
ADOPTED
ACTUAL AMENDED BUDGET
2012 2013 2014
STREET
REVENUES: 15,473,721$ 17,594,796$ 19,363,696$
EXPENDITURES: 15,696,875 17,594,796 19,363,696
REVENUES OVER (UNDER)
EXPENDITURES (223,154) -
BEGINNING FUND BALANCE 3,823,328 3,600,174 3,600,174
ENDING FUND BALANCE 3,600,174$ 3,600,174$ 3,600,174$
SPECIAL PROJECT - STREET
REVENUES: 891,445$ 608$ -$
EXPENDITURES: 744,997 31,955 -
REVENUES OVER (UNDER)
EXPENDITURES 146,448 (31,347) -
BEGINNING FUND BALANCE 26,535 172,984 141,636
ENDING FUND BALANCE 172,984$ 141,636$ 141,636$
SPECIAL PROJECTS
REVENUES: 3,827,393$ 5,203,925$ -$
EXPENDITURES: 4,100,939 7,193,819 -
REVENUES OVER (UNDER)
EXPENDITURES (273,546) (1,989,895) -
BEGINNING FUND BALANCE 4,779,850 4,506,304 2,516,410
ENDING FUND BALANCE 4,506,304$ 2,516,410$ 2,516,410$
SPECIAL REVENUE FUND
S
OPERATING BUDGET
2012 - 2014
Return to Table of Contents
ADOPTED
ACTUAL AMENDED BUDGET
2012 2013 2014
SPECIAL REVENUE FUND
S
OPERATING BUDGET
2012 - 2014
INFRASTRUCTURE
REVENUES: 98$ 48$ -$
EXPENDITURES: 15,098 43,177 -
REVENUES OVER (UNDER)
EXPENDITURES (15,000) (43,129) -
BEGINNING FUND BALANCE 57,862 42,862 (267)
ENDING FUND BALANCE 42,862$ (267)$ (267)$
EMERGENCY 911
REVENUES: 1,304,933$ 1,346,603$ -$
EXPENDITURES: 1,304,932 1,249,162 -
REVENUES OVER (UNDER)
EXPENDITURES 1 97,441 -
BEGINNING FUND BALANCE 2,822 2,823 100,264
ENDING FUND BALANCE 2,823$ 100,264$ 100,264$
GRANTS
REVENUES: 11,282,752$ 6,476,251$ -$
EXPENDITURES: 11,282,753 6,160,628 -
REVENUES OVER (UNDER)
EXPENDITURES (1) 315,623 -
BEGINNING FUND BALANCE (2,396) (2,397) 313,226
ENDING FUND BALANCE (2,397)$ 313,226$ 313,226$
Return to Table of Contents
ADOPTED
ACTUAL AMENDED BUDGET
2012 2013 2014
SPECIAL REVENUE FUND
S
OPERATING BUDGET
2012 - 2014
CDBG/HIPP/NHSP
REVENUES: 6,853,535$ 2,616,388$ -$
EXPENDITURES: 7,264,926 2,560,867 -
REVENUES OVER (UNDER)
EXPENDITURES (411,391) 55,521 -
BEGINNING FUND BALANCE 1,906,448 1,495,057 1,550,578
ENDING FUND BALANCE 1,495,057$ 1,550,57
8
$ 1,550,57
8
$
TOTAL BEGINNING FUND BALANCE 10,594,44
9
$ 9,817,807$ 8,222,021$
TOTAL REVENUES 39,633,877 33,238,619 19,363,696
TOTAL EXPENDITURES 40,410,52
0
34,834,40
4
19,363,69
6
TOTAL ENDING FUND BALANCE 9,817,80
6
$ 8,222,021$ 8,222,021$
Return to Table of Contents
ADOPTED
ACTUAL AMENDED BUDGET
2012 2013 2014
1988 CAPITAL IMPROVEMENTS
REVENUES: 42$ 285$ -$
EXPENDITURES: 862,827 -
REVENUES OVER (UNDER)
EXPENDITURES (862,785) 285 -
BEGINNING FUND BALANCE 862,500 (285) -
ENDING FUND BALANCE (285)$ $ -$
1998 CAPITAL IMPROVEMENTS
REVENUES: 1,515$ 2,261$ -$
EXPENDITURES: 251,300 344,667 -
REVENUES OVER (UNDER)
EXPENDITURES (249,785) (342,406) -
BEGINNING FUND BALANCE 978,603 728,818 386,411
ENDING FUND BALANCE 728,818$ 386,411$ 386,411$
2009A PARKS AND RECREATIO
N
REVENUES: 84$ 54$ -$
EXPENDITURES: 574,472 71,431
REVENUES OVER (UNDER)
EXPENDITURES (574,388) (71,377) -
BEGINNING FUND BALANCE 1,125,399 551,011 479,634
ENDING FUND BALANCE 551,011$ 479,634$ 479,634$
CAPITAL FUND
S
OPERATING BUDGET
2012 - 2014
Return to Table of Contents
ADOPTED
ACTUAL AMENDED BUDGET
2012 2013 2014
CAPITAL FUND
S
OPERATING BUDGET
2012 - 2014
1995 CAPITAL IMPROVEMENTS
REVENUES:
EXPENDITURES: 9
REVENUES OVER (UNDER)
EXPENDITURES (9)
BEGINNING FUND BALANCE 9
ENDING FUND BALANCE $
SHORT TERM FINANCING
REVENUES: 4,824$ 238$ -$
EXPENDITURES: 5,369,573 468,051 -
REVENUES OVER (UNDER)
EXPENDITURES (5,364,749) (467,812) -
BEGINNING FUND BALANCE 5,652,966 288,217 (179,595)
ENDING FUND BALANCE 288,217$ (179,595)$ (179,595)$
2004 CAPITAL IMPROVEMENTS
REVENUES: 72$ 35$ -$
EXPENDITURES: 37,611 3,636 -
REVENUES OVER (UNDER)
EXPENDITURES (37,539) (3,601) -
BEGINNING FUND BALANCE 47,863 10,324 6,723
ENDING FUND BALANCE 10,324$ 6,723$ 6,723$
Return to Table of Contents
ADOPTED
ACTUAL AMENDED BUDGET
2012 2013 2014
CAPITAL FUND
S
OPERATING BUDGET
2012 - 2014
2008 & 2009 LIBRARY IMPROVEMENT BOND
REVENUES: 739$ 12$ -$
EXPENDITURES: 7,825,671 3,137 -
REVENUES OVER (UNDER)
EXPENDITURES (7,824,932) (3,125) -
BEGINNING FUND BALANCE 7,828,258 3,326 201
ENDING FUND BALANCE 3,326$ 201$ 201$
2012 LIBRARY IMPROVEMENT BOND
REVENUES: 25,825,092$ 14,913$ -$
EXPENDITURES: 2,805,176 11,357,071 -
REVENUES OVER (UNDER)
EXPENDITURES 23,019,916 (11,342,158) -
BEGINNING FUND BALANCE - 23,019,916 11,677,758
ENDING FUND BALANCE 23,019,916$ 11,677,758$ 11,677,758$
2012-2021 CAPITAL IMPROVEMENTS FUND (3/8 CENT SALES TAX
)
REVENUES: 36,066,689$ 25,355,130$
EXPENDITURES: 13,621,292 17,673,303 -
REVENUES OVER (UNDER)
EXPENDITURES 22,445,398 7,681,827 -
BEGINNING FUND BALANCE - 22,445,398 30,127,225
ENDING FUND BALANCE 22,445,398$ 30,127,225$ 30,127,225$
Return to Table of Contents
ADOPTED
ACTUAL AMENDED BUDGET
2012 2013 2014
CAPITAL FUND
S
OPERATING BUDGET
2012 - 2014
2013 CAPITAL IMPROVEMENT FUND (STREETS AND DRAINAGE
)
REVENUES: 60,558,445$
EXPENDITURES: 4,213,731 -
REVENUES OVER (UNDER)
EXPENDITURES 56,344,715 -
BEGINNING FUND BALANCE - 56,344,715
ENDING FUND BALANCE $ 56,344,715$ 56,344,715$
TOTAL CAPITAL BEGINNING BALANC
E
16,495,598$ 47,046,724$ 98,843,072$
TOTAL REVENUES 61,899,058 85,931,375 -
TOTAL EXPENDITURE
S
31,347,931 34,135,027 -
TOTAL CAPITAL ENDING FUND BALANC
E
47,046,724$ 98,843,072$ 98,843,072$
Return to Table of Contents
ADOPTED
ACTUAL AMENDED BUDGET
2012 2013 2014
V
EHICLE STORAGE FACILITY
REVENUES: 1,359,763$ 1,346,960$ 1,348,840$
EXPENDITURES: 1,284,946$ 1,293,257 1,321,150
REVENUES OVER (UNDER)
EXPENDITURES 74,817$ 53,703 27,690
BEGINNING NET POSITION (789,269)$ (714,452) (660,749)
ENDING NET POSITION (714,452
)
$ (660,749
)
$ (633,059
)
$
WASTE DISPOSAL
REVENUES: 20,004,167$ 17,194,521$ 17,563,000$
EXPENDITURES: 16,574,747$ 17,688,470 17,655,926
REVENUES OVER (UNDER)
NET INCOME (LOSS) 3,429,420$ (493,949) (92,926)
BEGINNING NET POSITION 13,406,998$ 16,836,418 16,342,469
ENDING NET POSITION 16,836,41
8
$ 16,342,46
9
$ 16,249,54
3
$
PARKING GARAGE
S
REVENUES: 2,140,903$ 2,044,783$ 2,224,167$
EXPENDITURES: 1,861,831$ 2,179,806 2,224,167
REVENUES OVER (UNDER)
NET INCOME (LOSS) 279,072$ (135,023) -
BEGINNING NET POSITION 158,487$ 437,559 302,536
ENDING NET POSITION 437,559$ 302,536$ 302,536$
ENTERPRISE FUNDS
OPERATING BUDGET
2012 - 2014
Return to Table of Contents
ADOPTED
ACTUAL AMENDED BUDGET
2012 2013 2014
ENTERPRISE FUNDS
OPERATING BUDGET
2012 - 2014
RECREATION SERVICES
REVENUES: 815,153$ -$ -$
EXPENDITURES: 1,574,060 - -
REVENUES OVER (UNDER)
EXPENDITURES (758,907)$ - -
BEGINNING NET POSITION 758,907 - -
ENDING NET POSITION -$ -$ -$
TOTAL ENTERPRISE BEGINNING NET POSITION 13,535,12
3
$ 16,559,52
5
$ 15,984,25
6
$
TOTAL REVENUES 24,319,98
6
20,586,26
4
21,136,00
7
TOTAL EXPENDITURES 21,295,58
4
21,161,53
3
21,201,24
3
TOTAL ENTERPRISE ENDING NET POSITION 16,559,52
5
$ 15,984,25
6
$ 15,919,02
0
$
Return to Table of Contents
ADOPTED
ACTUAL AMENDED BUDGET
2012 2013 2014
FLEET INTERNAL SERVICE FUND
REVENUES: 11,732,606$ 12,616,069$ 13,144,531$
EXPENDITURES: 11,622,523 12,866,069 13,135,688
REVENUES OVER (UNDER)
EXPENDITURES 110,083 (250,000) 8,843
BEGINNING NET POSITION 2,472,599 2,582,682 2,332,682
ENDING NET POSITION 2,582,682$ 2,332,682$ 2,341,52
5
$
FLEET INTERNAL SERVICE FUND
OPERATING BUDGET
2012 - 2014
Return to Table of Contents
ADOPTED
ACTUAL AMENDED BUDGET
2012 2013 2014
+
POLICE PENSION & RELIEF FUND
ADDITIONS: 11,064,477$ 7,693,973$ -$
DEDUCTIONS: 12,085,958 55,278,866 -
NET INCREASE (DECREASE) (1,021,481) (47,584,893) -
NET POSITION HELD IN TRUST, BEGINNING 48,606,374 47,584,893 (0)
NET POSITION HELD IN TRUST, ENDIN
G
47,584,89
3
$ (0)$ (0)$
FIRE PENSION & RELIEF FUND
ADDITIONS: 12,099,167$ 13,964,243$ -$
DEDUCTIONS: 11,569,002 11,176,236 -
NET INCREASE (DECREASE) 530,165 2,788,007 -
NET POSITION HELD IN TRUST, BEGINNING 70,545,313 71,075,478 73,863,484
NET POSITION HELD IN TRUST, ENDIN
G
71,075,47
8
$ 73,863,48
4
$ 73,863,48
4
$
NON-UNIFORM DEFINED BENEFIT FUN
D
ADDITIONS: 2,524,224$ 3,633,030$ -$
DEDUCTIONS: 1,692,940 1,769,238 -
NET INCREASE (DECREASE) 831,284 1,863,792 -
NET POSITION HELD IN TRUST, BEGINNING 9,158,879 9,990,163 11,853,955
NET POSITION HELD IN TRUST, ENDIN
G
9,990,16
3
$ 11,853,95
5
$ 11,853,95
5
$
FIDUCIARY FUND
S
OPERATING BUDGET
2012 - 2014
Return to Table of Contents
ADOPTED
ACTUAL AMENDED BUDGET
2012 2013 2014
FIDUCIARY FUND
S
OPERATING BUDGET
2012 - 2014
NON-UNIFORM DEFINED CONTRIBUTIO
N
ADDITIONS: 6,291,537$ 8,746,491$ -$
DEDUCTIONS: 2,944,365 3,720,032 -
NET INCREASE (DECREASE) 3,347,172 5,026,460 -
NET POSITION HELD IN TRUST, BEGINNING 35,309,536 38,656,708 43,683,168
NET POSITION HELD IN TRUST, ENDIN
G
38,656,70
8
$ 43,683,16
8
$ 43,683,16
8
$
401 (A) PENSION FUND
ADDITIONS: 1,804,612$ 2,791,794$ -$
DEDUCTIONS: 80,176 1,010,136 -
NET INCREASE (DECREASE) 1,724,436 1,781,659 -
NET POSITION HELD IN TRUST, BEGINNING 7,033,794 8,758,230 10,539,889
NET POSITION HELD IN TRUST, ENDIN
G
8,758,23
0
$ 10,539,88
9
$ 10,539,88
9
$
HEALTH MANAGEMENT TRUST FUN
D
ADDITIONS: 235,845$ 360,871$ -$
DEDUCTIONS: 16,606 19,284 -
NET INCREASE (DECREASE) 219,239 341,587 -
NET POSITION HELD IN TRUST, BEGINNING 1,535,886 1,755,125 2,096,712
NET POSITION HELD IN TRUST, ENDIN
G
1,755,12
5
$ 2,096,712$ 2,096,712$
TOTAL NET POSITION BEGINNIN
G
172,189,78
2
$ 177,820,59
6
$ 142,037,20
7
$
TOTAL ADDITION
S
34,019,86
2
37,190,40
3
-
TOTAL DEDUCTION
S
28,389,04
7
72,973,79
2
-
TOTAL NET POSITION ENDIN
G
177,820,59
6
$ 142,037,20
7
$ 142,037,20
7
$
Return to Table of Contents
ADOPTED
ACTUAL AMENDED BUDGET
2012 2013 2014
2002 CIP JUNIOR LIEN BONDS
REVENUE: 317,741$ 318,643$ -$
EXPENDITURES: 318,699 320,298 -
NET INCREASE (DECREASE) (958) (1,655) -
BEGINNING FUND BALANCE 20,788 19,830 18,176
ENDING FUND BALANCE 19,830$ 18,176$ 18,176$
2004 IMPROVEMENT BONDS DEBT SERVICE
REVENUE: 11,991,543$ 1,665$ -$
EXPENDITURES: 11,587,780 12,140,829 -
NET INCREASE (DECREASE) 403,763 (12,139,164) -
BEGINNING FUND BALANCE 11,735,401 12,139,164
ENDING FUND BALANCE 12,139,16
4
$ $ $
2004 LIBRARY IMP. BONDS DEBT SERVICE
REVENUE: 9,619,017$ -$
EXPENDITURES: 11,859,386 -
NET INCREASE (DECREASE) (2,240,369) - -
BEGINNING FUND BALANCE 2,240,369 - -
ENDING FUND BALANCE $ -$ -$
DEBT SERVICE FUNDS
OPERATING BUDGET
2012 - 2014
Return to Table of Contents
ADOPTED
ACTUAL AMENDED BUDGET
2012 2013 2014
DEBT SERVICE FUNDS
OPERATING BUDGET
2012 - 2014
2007 CAPITAL IMP. REVENUE REFUNDING BON
D
REVENUE: 1,438,391$ 1,436,485$ -$
EXPENDITURES: 1,438,438 1,436,300 -
NET INCREASE (DECREASE) (47) 185 -
BEGINNING FUND BALANCE 19,693 19,646 19,831
ENDING FUND BALANCE 19,646$ 19,831$ 19,831$
2008 LIBRARY IMPROVEMENT BOND
REVENUE: 3,787,764$ 3,610,548$ -$
EXPENDITURES: 4,502,966 3,912,055 -
NET INCREASE (DECREASE) (715,202) (301,507) -
BEGINNING FUND BALANCE 4,907,781 4,192,579 3,891,072
ENDING FUND BALANCE 4,192,57
9
$ 3,891,072$ 3,891,072$
2009 PARKS & REC CAPITAL IMPROVEMENT BON
D
REVENUE: 1,906,934$ 1,308,844$ -$
EXPENDITURES: 502,995 1,307,778 -
NET INCREASE (DECREASE) 1,403,939 1,066 -
BEGINNING FUND BALANCE 717,732 2,121,671 2,122,737
ENDING FUND BALANCE 2,121,671$ 2,122,737$ 2,122,737$
Return to Table of Contents
ADOPTED
ACTUAL AMENDED BUDGET
2012 2013 2014
DEBT SERVICE FUNDS
OPERATING BUDGET
2012 - 2014
2012 LIBRARY IMPROVEMENT BONDS
REVENUE: 2,088,831$ 3,498,679$ -$
EXPENDITURES: - 2,042,898 -
NET INCREASE (DECREASE) 2,088,831 1,455,781 -
BEGINNING FUND BALANCE
2,088,831 3,544,612
ENDING FUND BALANCE 2,088,831$ 3,544,612$ 3,544,612$
2013 CAPITAL IMPROVEMENT BONDS
REVENUE: 10,898,431$ -$
EXPENDITURES: 310,738 -
NET INCREASE (DECREASE) 10,587,694 -
BEGINNING FUND BALANCE 10,587,694
ENDING FUND BALANCE $ 10,587,69
4
$ 10,587,69
4
$
TOTAL BEGINNING FUND BALANCE 19,641,76
4
$ 20,581,721$ 20,184,121$
TOTAL REVENUES 31,150,221 21,073,29
6
TOTAL EXPENDITURES 30,210,26
4
21,470,89
6
TOTAL ENDING FUND BALANCE 20,581,721$ 20,184,121$ 20,184,121$
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
2014 Five Year Forecast
Little Rock Code Section 2-214 requires the Board of Directors to adopt an
annual budget on or before December 30 of each year. A budget is balanced
when appropriated expenses do not exceed the sum of estimated net revenues
and available fund balances. The proposed 2014 budgets are balanced and
fiscally responsible.
All fund designations and reserves are evaluated annually for long-term
adequacy and use requirements in conjunction with development of the City’s
five-year financial plan. A 10% reserve requirement is utilized for planning
purposes for all funds with the exception of the Solid Waste Fund, which has a
15% unrestricted retained earnings reserve requirement. In addition, each
annual operating budget will include a contingency appropriation in the general
fund sufficient to provide for unforeseen needs of an emergency nature for that
year. The desired level of the contingency appropriation each year shall be
based on the average of the three prior years’ experience levels but no less than
0.5% of General Fund revenue for the current fiscal year. The contingency
appropriation in the 2014 General Fund budget is $1,000,000 or approximately
0.54% of estimated revenue.
Per the City’s financial policy, the goal was to set aside $10,000,000 or 10% of
General Fund revenues, whichever is greater, into a restricted reserve fund on or
before December 31, 2005. However, due to economic conditions in the past
several years, the City has not met this goal. The restricted reserve is currently
$9,418,000. Contingency appropriations, which are not utilized during the fiscal
year to meet unforeseen needs, will be added to the restricted reserve until the
desired level is achieved. While, the City has not been able to increase the
reserve to the desired level, the City has not drawn from the restricted reserve to
balance the budget. The City anticipates an addition to the restricted reserve in
2014. The City Board of Directors will evaluate funds available following
completion of the 2013 annual audit to determine the amount of the addition.
Citizen demand for services has outpaced revenue growth in the last few years.
The citizens of Little Rock approved a one (1)-cent sales tax on September 13,
2011 to allow the City to fill critical positions that have remained vacant for many
years and to provide the City the opportunity to move forward with much needed
programs and capital projects. All of the services and projects funded by the tax
increase support the City goals and objectives centered on public safety,
economic development, basic City services, infrastructure, and quality of life.
The tax increase, which went into effect January 1, 2012, includes a permanent
5/8-cent operations tax and a 3/8-cent ten (10)-year capital tax, that will provide
additional Police Officers, more Code Enforcement Officers, new Fire and Police
facilities and a new emergency communications system. The capital projects
supported by the new 3/8-cent tax are highlighted in the Capital Improvements
section of the Budget Document. The ongoing operating expenses associated
with the capital projects are supported by the 5/8-cent portion of the new sales
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
tax. These expenses are phased into the five year forecast based on the
anticipated completion schedule of the capital projects. Consistent with the first
“must do” goal of the Mayor and Board of Directors, the City plans to complete all
of the public safety projects funded by the 3/8-cent ten (10)-year capital tax in the
first five (5) years. In addition, emphasis is placed on completing infrastructure
projects in each of the City’s seven (7) Wards, utilizing citizen input through
community meetings to determine projects that will be completed in three (3)-
year cycles.
The City has taken steps to plan for the future with the five-year forecast based
on the estimated revenues and operating expenditures for 2014 – 2018. The
forecast for 2014 – 2018 is a planning tool used for the projections. The Mayor
and Board of Directors have only approved the 2014 budget. However, the
Board is committed to providing financial stability in order to maintain critical
programs.
Return to Table of Contents
FY14 FY15 FY16 FY17 FY18
Adopted
Projected Projected Projected Projected
General Fund
Beginning Fund Balance $18,374,206 $19,374,206 $20,374,206 $21,374,207 $22,374,207
Plus: Est. Revenue 184,264,530 188,871,143 193,592,922 197,851,966 202,303,635
Less: Est. Expenses
General Administrative 20,296,290 20,958,661 21,411,591 20,327,009 20,732,208
Board of Directors 338,527 345,298 352,203 359,248 366,433
Community Programs 388,081 395,843 403,759 411,835 420,071
City Attorney 1,769,774 1,805,169 1,841,273 1,878,098 1,915,660
District Court - First Division 1,392,505 1,420,355 1,448,762 1,477,737 1,507,292
District Court - Second Division 1,247,286 1,272,232 1,297,676 1,323,630 1,350,102
District Court - Third Division 627,185 639,729 652,523 665,574 678,885
Finance 3,136,992 3,199,732 3,263,726 3,329,001 3,395,581
Human Resources 1,632,677 1,665,331 1,698,637 1,732,610 1,767,262
Information Technology 4,358,322 4,445,488 4,534,398 4,625,086 4,717,588
Planning and Development 2,583,968 2,635,647 2,688,360 2,742,128 2,796,970
Housing & Neighborhood Programs 5,673,839 5,787,316 5,903,062 6,021,123 6,141,546
Public Works 1,166,482 1,189,812 1,213,608 1,237,880 1,262,638
Parks & Recreation 9,739,691 9,934,485 10,133,175 10,335,838 10,542,555
River Market 1,208,675 1,232,849 1,257,505 1,282,656 1,308,309
Golf 2,187,165 2,230,908 2,275,526 2,321,037 2,367,458
Jim Dailey Fitness & Aquatics 896,565 914,496 932,786 951,442 970,471
Zoo 6,488,801 6,618,577 6,750,949 6,885,968 7,023,687
Fire ** 45,774,586 46,918,951 48,185,762 50,949,478 52,121,316
Police 67,200,859 68,880,880 70,740,664 72,155,478 73,887,209
Vacancy Reductions (5,000,000) (5,000,000) (5,000,000) (5,000,000) (5,000,000)
Transfers Out (including contingency) 11,156,260 11,379,385 11,606,973 11,839,112 12,030,396
184,264,530 188,871,143 193,592,921 197,851,966 202,303,636
Anticipated contingency/reserve 1,000,000 1,000,000 1,000,000 1,000,000 1,020,000
Ending Fund Balance * $19,374,206 $20,374,206 $21,374,207 $22,374,207 $23,394,207
Reserve Requirement
(10% of Revenues) $18,426,453 $18,887,114 $19,359,292 $19,785,197 $20,230,364
* 2014 Ending Fund Balance includes an estimated restricted reserve of $10,500,000.
** Includes the addition of 24 fire fighters in 2017 with the opening of the Southwest Little Rock Fire Station which is
scheduled for completion in 2016.
Street Fund
Beginning Balance $3,600,174 $3,600,174 $3,797,684 $3,999,144 $4,204,633
Plus: Est. Revenue 19,363,696 19,750,970 20,145,989 20,548,909 20,959,887
Less: Est. Expenses 19,363,696 19,553,460 19,944,529 20,343,420 20,750,288
Ending Balance $3,600,174 $3,797,684 $3,999,144 $4,204,633 $4,414,232
Reserve Requirement
(10% of revenue) $1,936,370 $1,975,097 $2,014,599 $2,054,891 $2,095,989
2014 - 2018 FORECAST
CITY OF LITTLE ROC
K
Return to Table of Contents
FY14 FY15 FY16 FY17 FY18
Adopted
Projected Projected Projected Projected
2014 - 2018 FORECAST
CITY OF LITTLE ROC
K
Fleet Fund
Beginning Net Position $2,332,682 $2,341,525 $2,350,545 $2,359,745 $2,369,129
Plus: Est. Revenue 13,144,531 13,407,422 13,675,570 13,949,081 14,228,063
Less: Est. Expenses 13,135,688 13,398,402 13,666,370 13,939,697 14,218,491
Ending Net Position $2,341,525 $2,350,545 $2,359,745 $2,369,129 $2,378,701
Reserve Requirement
(10% of revenues) $1,314,453 $1,340,742 $1,367,557 $1,394,908 $1,422,806
Vehicle Storage Facility
Beginning Net Position ($660,749) ($633,059) ($591,604) ($535,976) ($465,758)
Plus: Est. Revenue 1,348,840 1,375,817 1,403,333 1,431,400 1,460,028
Less: Est. Expenses 1,321,150 1,334,362 1,347,705 1,361,182 1,374,794
Ending Net Position ($633,059) ($591,604) ($535,976) ($465,758) ($380,524)
Reserve Requirement
(10% of revenues) $134,884 $137,582 $140,333 $143,140 $146,003
Waste Disposal Fund
Beginning Net Position $16,342,469 $16,249,543 $16,221,531 $15,871,963 $16,041,501
Plus: Est. Revenue 17,563,000 17,762,719 17,834,099 17,906,181 17,978,980
Less: Est. Expenses 17,655,926 17,790,731 18,183,667 17,736,643 18,156,684
Ending Net Position $16,249,543 $16,221,531 $15,871,963 $16,041,501 $15,863,797
Reserve Requirement
(15% of revenues) $2,634,450 $2,664,408 $2,675,115 $2,685,927 $2,696,847
Parking Garages
Beginning Net Position $302,536 $302,536 $302,536 $302,536 $302,536
Plus: Est. Revenue 2,224,167 2,268,650 2,314,023 2,360,304 2,407,510
Less: Est. Expenses 2,224,167 2,268,650 2,314,023 2,360,304 2,407,510
Ending Net Position $302,536 $302,536 $302,536 $302,536 $302,536
A rate increase of $1.03 associated with recycling was implemented in 2013. No other rate increases are anticipated
during the five year forecast. Expenses reflect the reduction of debt service as bonds are retired and the capital
replacement needs including the development of a class 4 landfill cell in 2014 and regular replacement of collection
vehicles.
Return to Table of Contents
Revenues
CITY OF LITTLE ROCK
2014 BUDGET SUMMARY
ALL FUNDS RESOURCES
$237,908,764
Street
Fund
8.14%
Fleet
Services
5.53%
Waste
Disposal
7.38%
General
Fund
77.45%
Vehicle Storage
Facility
.57%
Parking
Garages
.93%
Return to Table of Contents
2012 2013 2013 2014 13/14 %
REVENUES: ACTUAL (1)
A
DOPTED
A
MENDED ADOPTED DIFF CHANGE
Property Taxes * $25,821,661 $18,522,800 $26,085,500 $26,548,180 $462,680 1.77%
Sales Tax 94,537,360 96,930,800 94,734,000 96,123,400 1,389,400 1.47%
Business Licenses 6,068,956 6,013,600 6,300,000 6,363,000 63,000 1.00%
Mixed Drinks 1,902,650 1,991,000 2,100,000 2,205,000 105,000 5.00%
Building, Related Permits 2,145,351 1,832,000 1,946,800 1,941,200 (5,600) -0.29%
Insurance Pension Turnback* 5,936,255 2,424,700 6,302,545 6,353,442 50,897 0.81%
Park Revenue 341,306 354,400 354,400 425,500 71,100 20.06%
River Market 542,459 592,000 548,000 607,000 59,000 10.77%
Golf 1,121,306 1,104,300 889,700 1,128,700 239,000 26.86%
Jim Dailey Fitness and Aquatic Cente
r
529,454 539,169 464,479 540,300 75,821 16.32%
Zoo 2,978,789 3,010,000 3,010,000 3,557,041 547,041 18.17%
Airport Reimbursement 2,978,282 3,108,600 3,148,000 3,194,900 46,900 1.49%
Salary Reimbursement 911 547,117 750,000 750,000 750,000 0 0.00%
Fines and Fees 3,001,015 3,308,400 3,166,400 3,199,875 33,475 1.06%
Utility Franchises 27,421,687 27,650,100 27,486,900 27,686,000 199,100 0.72%
Interest Earnings 25,613 25,950 50,950 50,000 (950) -1.86%
All Other 2,966,225 1,770,070 1,755,865 1,810,100 54,235 3.09%
Transfers In 1,377,421 1,283,271 1,796,010 1,780,892 (15,118) -0.84%
Total General Fund 180,242,907 171,211,160 180,889,549 184,264,530 3,374,981 1.87%
Other Budgeted Funds
Street 15,473,721 17,594,796 17,594,796 19,363,696 1,768,900 10.05%
Fleet Services 11,732,606 12,616,069 12,616,069 13,144,531 528,462 4.19%
Vehicle Storage Facility 1,359,762 1,346,960 1,346,960 1,348,840 1,880 0.14%
Waste Disposal 20,004,167 17,194,521 17,194,521 17,563,000 368,479 2.14%
Parking Garages 2,140,903 2,044,783 2,044,783 2,224,167 179,384 8.77%
Total Other Budgeted Funds 50,711,159 50,797,129 50,797,129 53,644,234 2,847,105 5.60%
Total All Budgeted Funds $230,954,066 $222,008,289 $231,686,678 $237,908,764 $6,222,086 2.80%
* Includes Property Tax and Pension Turnback funds associated with the Police and Fire Pension.
CITY OF LITTLE ROC
K
2014 OPERATING REVENUE
S
(1) Numbers have been adjusted to reflect the consolidation of the RiverMarket, Golf, Fitness and Aquatics Center, and Zoo Enterprise
Funds with the General Fund.
Return to Table of Contents
$0
$20,000,000
$40,000,000
$60,000,000
$80,000,000
$100,000,000
2012 2013 2014
Sales Taxes Utility Franchises
All Other Property Taxes
General Government
Summary of Revenues
2012-2014
Return to Table of Contents
2012 2013 2014
ACTUAL (1) ADOPTED ADOPTED
GENERAL FUND
PROPERTY TAX
Property Taxes 17,097,580$ 17,100,000$ 17,567,560$
Pension Property Taxes 7,261,136 7,510,200
Homestead Taxes 1,031,193 1,062,400 1,082,600
Act 9 Industry Payment 328,538 350,400 377,820
Property Taxes LR Port Authority 103,214 10,000 10,000
Total Property Taxes 25,821,661 18,522,800 26,548,180
SALES TAX
County Sales & Use Tax 39,214,134 40,332,300 39,999,500
City Sales Tax 52,186,423 53,488,300 53,177,100
State Tax Turnback 3,136,803 3,110,200 2,946,800
Total Sales Taxes 94,537,360 96,930,800 96,123,400
BUSINESS LICENSES
General Business Licenses 6,068,956 6,013,600 6,363,000
Mixed Drinks Licenses 1,902,650 1,991,000 2,205,000
Total Business Licenses 7,971,606 8,004,600 8,568,000
PERMITS
Building & Excavation Permits 1,146,944 1,021,000 1,080,000
Electrical Permits 352,546 263,000 285,000
Plumbing Permits 301,450 254,000 255,000
HVAC Permits 269,504 224,000 244,000
Wrecker Franchise 73,663 68,600 75,000
Burn Permits 1,244 1,400 2,200
Total Permits 2,145,351 1,832,000 1,941,200
INTERGOVERNMENTAL
Insurance Turnback 2,424,675 2,424,700 2,961,500
Police and Fire Pension Insurance Turnback 3,511,580 3,391,942
Total Intergovernmental 5,936,255 2,424,700 6,353,442
POLICE SERVICES
Police Report 400,879 400,000
450,000
Fa
lse Alarm 19,990 15,000 20,000
Airport - Security Guards 1,770,614 1,859,100 1,907,400
Total Police Services 2,191,482 2,274,100 2,377,400
FIRE SERVICES
Fire Alarm Inspection 10
Airport-Fire Pro
tection 1,207,668 1,249,500 1,287,500
Fire Training Academy 447 400
Total Fire Services 1,208,126 1,249,900 1,287,500
PARK REVENUE
SWLR Community Complex 91,108 88,000 100,000
Athletics Fees 96,771 102,500 97,800
Pavilion Rental 43,309 45,500 47,000
Community Center & Miscellaneous Fees 76,582 73,700 124,100
Admissions Revenue 33,246 30,000 35,000
Miscellaneous Revenue 291 14,700 21,600
Total Park Revenue 341,306 354,400 425,500
CITY OF LITTLE ROCK
2014 OPERATING REVENUE
Return to Table of Contents
2012 2013 2014
ACTUAL (1) ADOPTED ADOPTED
CITY OF LITTLE ROCK
2014 OPERATING REVENUE
RIVER MARKET
Admissions Revenue 187,633 190,000 220,000
Space Rental 354,826 402,000 387,000
Total River Market Revenue 542,459 592,000 607,000
GOLF
Concessions Revenue 130,014 140,820 136,500
Green Fees 979,431 965,900 949,000
Equipment Rental 565,626 567,440 585,400
Merchandise Sales 86,293 89,520 94,400
Miscellaneous Revenue 20,780 17,000 24,200
Parks Contra Revenue (Debt Service) (660,838) (676,380) (660,800)
Total Golf Revenue 1,121,306 1,104,300 1,128,700
JIM DAILEY FITNESS & AQUATIC CENTER
Annual Fees 44,998 44,890 50,000
Monthly Membership 227,560 233,500 227,500
Daily Fees 106,176 108,600 106,000
Corporate Fees 229,487 240,800 229,000
Special Fees 9,555 7,600 6,100
Other 65,369 65,610 69,600
Miscellaneous 485 500 6,300
Parks Contra Revenue (Debt Svc) (154,176) (162,331) (154,200)
Total Jim Dailey Fitness & Aquatic Center 529,454 539,169 540,300
ZOO
Membership 374,193 386,000 440,000
Zoo Admissions 1,774,192 1,800,000 2,147,191
Concessions 495,366 480,300 580,000
Token Sales 179,588 210,000 146,150
Education 42,472 55,000 61,500
Special Events 174,551
164,750
200,000
Zoo Rentals 29,771 18,000 70,000
Merchandise Sales 367,601 370,000 370,000
Miscellaneous 34,146 40,000 35,300
Parks Contra Revenue (Debt Svc) (493,091) (514,050) (493,100)
Total Zoo Revenue 2,978,789 3,010,000 3,
557,041
FINES
Fines - Traffic 1,820,910 2,092,500 1,870,000
Fines - Criminal - Other 314,178 320,400 350,000
Probation Assessments 60,931 60,000 40,000
Additional Court Cost 18,992 19,000 19,500
Theft Diversion Class 100 100
Fines - Parking 241,107 244,000 335,000
Fines - Child Passenger Protection 5,225 4,000 4,300
Fines - Environmental 32,179 37,000 16,000
Fines - Animal 262,908 252,000 290,000
Fines - Other (8,063) 4,200
Drunk-O-Meter 3,848 2,500 4,000
Total Fines 2,752,315 3,031,500 2,933,000
Return to Table of Contents
2012 2013 2014
ACTUAL (1) ADOPTED ADOPTED
CITY OF LITTLE ROCK
2014 OPERATING REVENUE
FEES
Rezoning Fees 42,695 43,000 50,000
Act 474 Admin Fees 362
Act 9 Admin Fees 25 4,000 4,000
Incident Report Fees 40
Civil Court Fees 74,436 74,500 70,000
Booking & Admin Fee -Pulaski County Jail 110
Education Training Fees 6,675 600
Community Service Fees 24,900 33,000 26,200
Miscellaneous Service Fees 89,457 105,800 101,675
Mobile Home Registration Fees 10,150 10,000 15,000
Animal Services (150) 6,000
Total Fees 248,700 276,900 266,875
UTILITY FRANCHISE
Entergy 13,374,422 12,977,800 12,482,000
S W Bell 863,272 737,700 710,000
Local Landline Franchise Fees 231,803 216,800 222,500
Long Dist. Franchise Fees 857,255 917,500 917,500
Centerpoint Energy 2,843,386 2,700,000 3,323,000
Central Ark Water 3,484,189 3,647,100 3,460,000
LR Waste Water 4,220,897 4,900,000 5,043,300
Fiber Optics 1,437,936 1,438,300 1,400,000
Cable TV 1,863,162 1,867,000 1,884,800
Franchise Fee Contra (1,754,635) (1,752,100) (1,757,100)
Total Utility Franchises 27,421,687 27,650,100 27,686,000
MISCELLANEOUS SERVICES
Crossing Guards-LRSD Reimbursement 493,271 455,500 572,200
911 Services Reimbursement 547,117 750,000 750,000
Total Miscellaneous Services 1,040,389 1,205,500 1,322,200
INVESTMENT INCOME
Interest Income 25,613
25,950
50,000
Total Investment Income 25,613 25,950 50,000
RENTS AND ROYALTIES
Tower Lease 280,171 317,600 258,000
Ground Leases 3,025 12,300 6,600
Amusement Park Leases 6,579 3,100 3,300
Total Rent
s and Royalties 289,775 333,000 267,900
MISCELLANEOUS INCOME
Security Deposit Rental Reimbursement
Other Reimbursement 33,559 15,300
Commission - Vending 269 300
Contributions/Donations 1,201,644 250,000 250,000
Miscellaneous Revenue 526,381 300,570 250,000
Total Miscellaneous Revenue 1,761,853 566,170 500,000
Transfers In 1,377,421 1,283,271 1,780,892
TOTAL GENERAL FUND REVENUE 180,242,907 171,211,160 184,264,530
Return to Table of Contents
2012 2013 2014
ACTUAL (1) ADOPTED ADOPTED
CITY OF LITTLE ROCK
2014 OPERATING REVENUE
STREET FUND
ST Homestead Tax 299,029 307,000 302,000
1/2 County Road Tax 4,958,256 4,930,000 5,171,400
State Gas Tax Turnback 8,748,042 10,568,500 12,100,000
Street Repair Reimbursement 10,645 10,000 10,000
Insurance Reimbursement 135,878 50,000 50,000
Interest On Investments 3,598 4,000 5,000
Transfer In 1,318,273 1,725,296 1,725,296
TOTAL STREET FUND 15,473,721 17,594,796 19,363,696
FLEET INTERNAL SERVICE FUND
Fleet Labor 2,475,551 2,612,235 2,843,569
Fuel Fees 3,206,878 3,898,944 3,671,802
Miscellaneous Sales 786,407 736,000 768,998
Motor Pool 6,688 5,585 8,932
Fleet Parts 3,173,565 3,183,926 3,372,450
Insurance Totaled 201,158 50,000 30,000
Fleet Management 664,238 974,377 1,138,780
Fleet Sublets 1,223,177 1,155,000 1,310,000
Interest on Investments 1,126
Gain/Loss on Sale of Fixed Assets (6,182) 2
TOTAL FLEET INTERNAL SERVICE FUND 11,732,606 12,616,069 13,144,531
VEHICLE STORAGE FACILITY
Licenses and Permits 20,045 20,960 21,240
Storage Fees 331,867 330,000 330,000
Wrecker Fees 364,767 506,610 420,000
Vehicle Auction Sale 508,209 360,390 440,000
Impound Administration 90,870 91,000 100,000
Vehicle Storage Miscellaneous 20,997 14,000 37,600
Contributions/Donations 23,007
24,000
TO
TAL VEHICLE STORAGE FACILITY 1,359,762 1,346,960 1,348,840
WASTE DISPOSAL ENTERPRISE FUND
Sanitation Fees 15,241,606 16,019,921 15,910,000
Landfill Fees 953,621 910,000 1,300,000
Methane Gas Revenue 120,272 96,000 135,000
Yard Waste 69,115 60,000 100,000
Compost Sale 119,196 85,000 100,000
Interest On Investments 8,682 8,000 8,000
Miscellaneous Revenue (22,718) 15,600 10,000
Contributions/Donations 2,039,153
Transfers 1,475,240
TOTAL WASTE DISPOSAL ENTERPRISE FUND 20,004,167 17,194,521 17,563,000
Return to Table of Contents
2012 2013 2014
ACTUAL (1) ADOPTED ADOPTED
CITY OF LITTLE ROCK
2014 OPERATING REVENUE
PARKING GARAGES
Business License - Auto/Truck 210,193 270,000 270,000
Street Repair Reimbursement 299,775 130,000 180,000
Parking Meters 489,047 470,000 500,000
Surface Lot Parking 88,683 88,683 93,117
Parking Deck Monthly 798,874 823,000 870,000
Parking Deck Daily 173,262 177,200 248,500
Parking Peabody 79,123 83,000 60,000
Interest on Investments 1,946 2,100 2,100
Miscellaneous Income - 800 450
TOTAL PARKING GARAGES 2,140,903 2,044,783 2,224,167
GRAND TOTAL ALL FUNDS 230,954,066$ 222,008,289$ 237,908,764$
(1) The 2012 Actual numbers have been adjusted to reflect the consolidation of the River Market,
Golf, Jim Daily Fitness and Aquatics Center, and Zoo Funds with the General Fund.
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
REVENUE TRENDS
OVERALL
The City’s General Fund revenues are primarily comprised of sales taxes, property
taxes, utility franchise fees, fines and fees and revenues from various licenses.
The largest source of revenue in the City’s General Fund is sales tax, which
contributes approximately 52% to the 2014 budget. The 2014 operating budget
includes an increase in sales tax of 1% over 2013 actual tax collections. In
September 2011, voters approved an overall one (1)-cent sales tax increase, with
5/8 cent dedicated for ongoing operating expenses and 3/8 cent dedicated to
capital projects over a ten (10) year period. The 2013 sales tax grew at a rate of
0.68% over 2012 actuals. Growth in monthly sales tax receipts compared to the
same period a year ago continued to be volatile throughout the year without any
definitive trends. 2013 sales tax revenue for January, July, and November sales
grew at a rate of over 4.5% in comparison to the same periods a year ago, while
revenues for March sales were more than 5% below the same period a year ago.
Consumer confidence appears to be on the rise, but sales taxes generated by retail
sales have remained relatively flat. The impact of increasing internet sales and
rebates for local sales tax on business, governmental, and non-profit purchases in
excess of $2,500 have stifled local tax growth. State statute restricts the level of
tax information available to municipalities which makes revenue forecasting very
difficult.
The 2014 budget includes the revenue and expense associated with separate
property tax millages and state turnback funds for the closed Police and Fire
Pension and Relief Funds. The revenue is passed through the General Fund and
contributed directly to the Police and Fire Pension Funds. In prior years, this
revenue has been reflected as a year-end adjustment and has not been included
in the annual budget. In 2014, the dedicated revenue of approximately $10.9
million is included in the General Fund budget. Excluding the dedicated pension
revenue, the projected change in operating revenues is approximately 2.5% over
the original 2013 operating budget.
REVENUES CHANGE
2010 Operating Revenues 131.1
2011 Operating Revenues 134.4 2.52%
2012 Operating Revenues 163.8 21.88%
2013 Operating Revenues 171.2 4.52%
2014 Operating Revenues 184.3 7.62%
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Property taxes comprise approximately 14.4% of 2014 General Fund budgeted
revenues. Assessments of real estate and personal property are levied in the
current year and collectible in the following year. Little Rock is in Pulaski County
which completed a real estate reappraisal in 2012. Historically, the reappraisal is
on a three (3) year cycle, however the Arkansas State Assessment Coordination
Department altered the reappraisal to a five (5) year cycle with the next appraisal
in 2017. Personal property is reappraised annually by May 31. The original charge
for 2013 property taxes to be collected in 2014 reflects a 2.4% increase over 2013.
Utility franchise fees comprise approximately 15% of 2014 General Fund budgeted
revenues. 2013 utility franchise revenues were approximately 2% above 2012.
Overall, there is a slight increase over the 2013 budget and a 1% reduction from
2013 actual revenues forecast for 2014. Weather plays a significant role in the
majority of the annual franchise fee revenues. The largest percentage changes
experienced in 2013 were associated with CenterPoint Energy, the gas utility,
Wastewater, and Comcast Cable. The price of natural gas increased substantially
over the past twelve months. The increase in natural gas prices, coupled with a
14.6% increase in usage, resulted in an increase in franchise fee revenues from
CenterPoint Energy of approximately 19%. Wastewater Utility implemented an
average 8% increase in rates in 2013. Central Arkansas Water and the
Wastewater utility have experienced significant reductions in water usage due to
efficiencies in technology, conservation efforts, and significant rainfall in the spring
and summer. There are a number of franchise rate adjustments announced for
2014. Entergy Arkansas, the electric utility, has announced a 4% reduction in rates
with the expiration of the Federal Energy Regulatory Commission (FERC) rider
associated with its exit from a multi-state agreement in which it had operated for
decades to equalize rates among member states. Central Arkansas Water
announced a scheduled rate increase of 4%. CenterPoint Energy announced a
5.24% increase in rates for the first quarter of 2014. Wastewater will implement
scheduled rate increases of an average of 7% in 2014 and 4.75% in 2016. The
downward revenue trend continues for local landline franchise fees. The trend
towards households with only wireless phones gains in popularity.
Telecommunication revenues are expected to further decrease as wireless
continues to increase market share. Long distance and fiber optic revenues
continue to remain consistent with prior year revenues.
Licenses and permits comprise approximately 5.7% of 2014 General Fund
revenues. 2013 revenues increased 4.4% over 2012 and are expected to increase
approximately 1% over the amended 2013 budget in 2014. The 2013 growth
consisted of a 3.9% increase in business licenses and a 13.4% increase in mixed
drink supplemental payments. Building and related permit revenue declined 2.5%
from 2012 levels. Fines and fee revenues increased approximately 9.8%
compared to one year ago but were below 2013 budget levels. Traffic and parking
fines increased slightly from one year ago along with animal control operating
revenues and fines.
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
PROPERTY TAXES
In general, all real and personal property situated in the City is subjected to ad
valorem taxation with some exceptions such as school property and libraries.
Residents, utilities, and businesses in Little Rock are assessed and levied property
taxes as follows:
Assessed value is an amount equal to twenty (20) percent of market value,
and the levied millage is applied against the assessed value to determine
the tax owed. With the passage of Amendment 79, the most that a
residential property appraisal can be increased annually is 5%, regardless
of the increase in market value of the property. A non-residential property
or an investment property is limited to an annual increase of 10%.
Any annual increase in the value of utility and carrier real property is limited
to 10% of the assessed value for the previous year.
Tax levies, expressed in terms of millage (one mill equals $1 in tax per
$1,000 in assessed value), are passed by local governments and certified
to the County Tax Collector, who bills and collects the tax.
A Little Rock resident living in the Little Rock School District is charged a
millage rate of 70.10.
Taxes are remitted to the City monthly by the Pulaski County Treasurer as
payments are received throughout the year.
The General Assembly exercised its homestead exemption authority with the
passage of Act 1598 of 2001 (Amendment 79). Effective with the assessment
year 2000 and thereafter, the amount of real property taxes assessed on the
homestead of each property owner is reduced by $350. A homestead is a property
which is an owner’s principal place of residence.
The City recently received notice of the original charge for 2013 property taxes to
be collected in 2014 which reflects an overall increase of 2.43%. The Pulaski
County Treasurer’s Office is experiencing a collection rate of approximately 96%,
which includes collection of delinquent taxes from previous years.
The City tax levies the past two years were as follows:
2012 Payable 2013 2013 Payable 2014
General Operation 5.00 5.00
Bond Retirement 3.00 3.00
Library System 5.20 5.20
Police & Firemen’s Pension 2.00 2.00
15.20 15.20
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
The dedicated one mill property tax levies for the Police and Fire Pension plans
are included in the General Fund budget in 2014. The revenue is reflected in the
General Fund and is contributed directly to the Police and Fire Pension Funds. In
prior years, this “pass-through” revenue was not included in the annual budget, but
was included in actual revenues as a year-end adjustment. The dedicated pension
property tax millage is expected to generate approximately $7,510,200 in
revenues.
In addition, the City receives approximately one-half of the collections from a 2.90
mill road tax levied by the County and restricted to use for street repair and
maintenance. The 2014 budget anticipates $5.47 million in property tax collections
from this tax.
In addition to the City millage of 15.20 and the County road millage of 2.90, a Little
Rock property owner’s tax assessment for 2013 includes 5.60 mills levied by the
County and 46.40 mills levied by the Little Rock School District. The total millage
for a Little Rock property owner is 70.10 for 2013 property taxes payable in 2014.
The general operations 5.0 mill levy is the maximum rate allowable under state law
for general city operations. Property taxes for 2013 increased slightly over 2012
receipts. Property taxes include Act 9 Payments which represent payments in lieu
of property taxes paid by certain industrial companies. Dillards, LM Wind Power
Blades, Inc., Novus, Ringwood Container, Sage V Foods, Welspun Pipes, Inc. and
Windstream are companies which are scheduled to make Act 9 payments in 2014.
COUNTY SALES TAX
The City receives a pro-rata share of a one (1) cent countywide sales tax.
Distribution is based on the Little Rock population as a percentage of Pulaski
County’s total population. According to the 2010 Census, Little Rock experienced
a 5.0% growth in population from the 2000 Census. The City comprises
approximately 50.56% of the County population and therefore receives this
percentage of the County sales and use tax. The projected revenue for 2014 from
this tax is $39,999,500, which represents a 1.75% increase over the anticipated
2013 year-end results at the time the budget was adopted and a 1.47% increase
over 2013 actual sales tax receipts.
Use taxes, paid mostly by businesses, resemble sales taxes. They apply to goods
purchased from out-of-state merchants such as catalog vendors. Use taxes
included in the projection are approximately $3,625,000 annually. The local city
sales tax of 1.5% grew at a slightly higher rate of 0.78% than the county’s sales
tax growth rate of 0.52%. On January 1, 2008, changes to Arkansas’s state and
local sales tax laws were implemented for purposes of compliance with the
Streamlined Sales Tax Agreement. Including Arkansas, the sales tax laws of
twenty-four (24) states have been amended to conform to the agreement.
LOCAL SALES TAX
Prior to 2012, the City of Little Rock levied one of the lowest sales tax rates in the
State of Arkansas at 0.5%. In September 2011, voters approved an overall one
(1) cent sales tax increase which is comprised of a permanent 5/8 cent dedicated
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
for ongoing operations and a temporary 3/8 cent dedicated to capital projects over
a ten (10) year period. The new tax went into effect on January 1, 2012. The
existing 1/2 cent sales tax generated $23,376,013. The new 5/8 cent tax dedicated
to ongoing operations generated an additional $29,220,016 in revenue in 2013.
The 3/8 cent tax for capital projects generated $17,568,444 in 2013 and is
expected to generate $195.8 million over the ten (10) year period for capital
projects. The 3/8 cent tax revenue is not reflected in General Fund revenues.
Instead, it is reported in a separate capital projects fund.
There is a two-month delay from the time the actual sales tax revenues are
collected by businesses and the time they are received by the City. Sales tax is
remitted by businesses to the State, which disburses this amount to the City, less
a 3% administrative charge. Prior to January 2014, local governments had limited
information regarding sales tax receipts which made forecasting these revenues
difficult. As a result of concerted efforts by the Municipal League and sponsoring
cities, the Arkansas Department of Finance and Administration now issues a
statistical report which classifies and summarizes tax collection and adjustment
information for businesses, reporting activity for the specific city or county by
NAICS code. Over time, the reports are expected to better assist in sales tax
forecasting. The report will include components that comprise negative
adjustments, such as refunds, rebates and corrections. The projected revenue for
2014 from the local city tax is approximately $53,177,100 which represents a
1.75% increase from anticipated 2013 year-end results at the time the budget was
adopted and 1.10% over actual 2013 receipts.
STATE TAX TURNBACK
The State General Assembly, through the Office of Budget, appropriates and then
distributes an amount for turnback to municipalities each July 1
st
, based on
population. The General Fund turnback for 2014 was reduced from $16.30 to
$15.20 per capita, or a 6.75% decrease. The Arkansas State Legislature
$9,000,000
$18,000,000
$27,000,000
$36,000,000
$45,000,000
$54,000,000
$63,000,000
Budget Budget Budget
Actual Adopted Adopted
2012 2013 2014
Sales Tax
County Sales Tax
City Sales Tax
State Tax Turnback
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
appropriated monies to be disbursed to county and local governments from the
surplus of the Property Tax Relief Fund. Historically, Little Rock has received
approximately $411,000 from this appropriation. A reduced surplus in the fund will
result in a reduced appropriation to Little Rock of $205,925. State turnback funds
should generate approximately $2.95 million dollars in General Fund revenue in
2014.
Month 2012 2013 2012 2013 2012 2013
January $6,537,582 $6,083,989 $537,347 $567,572 *$5,889,623 $5,890,046
February 7,103,104 6,402,534 485,628 728,037 1,889,245 1,897,309
March 6,111,823 5,816,498 809,524 742,998 1,889,603 1,889,913
April 6,508,820 6,019,069 508,320 646,154 1,882,530 1,890,084
May 6,925,015 6,643,763 375,733 589,734 1,889,362 1,884,772
June 7,148,253 6,880,560 395,418 671,509 1,889,865 1,889,911
July 7,043,887 6,750,810 375,174 803,621 ** 5,842,460 5,424,973
August 6,643,716 7,684,016 294,504 865,190 1,889,165 2,586,804
September 6,846,853 9,473,120 356,918 817,319 1,890,041 1,889,910
O
ct
ober 6,528,082 9,422,856 498,818 742,984 1,890,041 1,889,910
November 6,440,630 8,234,597 545,492 686,467 1,889,559 1,889,429
December 6,450,883 8,433,441 470,060 685,869 1,703,307 1,889,910
Total $80,288,648 $87,845,255 $5,652,935 $8,547,455 $30,434,803 $30,912,971
* Includes $4 million appropriation from the Property Tax Relief Fund
** Includes $3,516,786.65 supplemental in July 2012 and $3,516,799.83 in July 2013
State Turnback
State Turnback Year-to-Date 2013 with 2012 Comparison (shaded blue)
Street Severance General
Month 2013 2012 2013 2012 2013 2012 2013 2012
January $43,764,256 $37,846,866 $39,379,372 $37,289,267 $83,143,628 $75,136,134 $12,329 $12,533
February 51,585,273 46,523,853 44,215,215 44,592,756 95,800,488 91,116,609 26,338 22,619
March 42,875,487 40,360,002 38,040,827 36,819,087 80,916,314 77,179,089 8,508 13,222
April 44,204,032 41,324,697 39,707,294 37,882,489 83,911,326 79,207,186 24,953 27,247
May 47,315,206 46,157,943 42,055,467 41,661,276 89,370,673 87,819,219 5,611 8,489
June 46,455,658 43,883,127 41,846,373 40,430,123 88,302,031 84,313,250 27,062 30,892
July 47,227,642 44,736,261 42,580,665 40,688,525 89,808,307 85,424,786 7,773 11,606
August 47,615,222 45,618,216 43,352,547 41,616,180 90,967,768 87,234,396
25,
210 27,685
September 45,850,267 44,215,998 43,479,764 40,815,883 89,330,031 85,031,881 9,433 14,110
October 46,540,715 45,686,669 44,208,889 42,353,132 90,749,603 88,039,801 26,911 28,246
November 45,245,392 45,434,409 42,367,542 41,142,702 87,612,934 86,577,110 8,718 14,114
December 45,359,946 44,662,489 41,645,364 40,506,136 87,005,310 85,168,625 29,399 26,648
Total $554,039,096 $526,450,530 $502,879,319 $485,797,556 $1,056,918,413 $1,012,248,086 $212,245 $237,411
Averages $46,169,925 $43,870,878 $41,906,610 $40,483,130 $88,076,534 $84,354,007 $17,687 $19,784
Municipal Sles and Use Tax has an effect on local sles tax revenues and is one of the factors that affect local sales tax based on where
the purchaser takes receipt or delivery of the product or service.
Source: Debbie Rogers, Office of State Treasurer
Interest
Local Option Sales and Use Tax in Arkansas
Sale and Use Tax Year-to-Date 2013 with 2012 Comparison (shaded blue)
Municipal Tax County Tax Total Tax
Return to Table of Contents
94
City of Little Rock, Arkansas 2014 Operating Budget
INTEREST EARNINGS
Interest earned on the investments and bank deposits of the General Fund, certain
bond retirement funds, special projects and capital funds can legally be utilized for
any municipal purpose. The Federal Funds rate has decreased to a target range
of between 0.00% and 0.25% and has remained at historically low levels since
January 1, 2009. The Discount Rate currently remains at 0.75%. During the
second half of 2013, the yield on fixed-income investments held in the short-term
operating fund have increased slightly.
These securities are short in duration, backed by the U.S. government and are
among the safest securities in the world. Short term interest rates are scheduled
to remain in the exceptionally low range in 2014 with rates expected to rise only
modestly by the end of 2015. Slightly higher interest rates coupled with larger fund
balances should increase investment earnings in 2014. The City’s bank deposits
continue to yield a favorable 0.45% in 2014.
UTILITY FRANCHISES
Utility franchise fees are charged to public utilities for the privilege of using the
City’s streets and rights-of-way. The public utilities paying franchise fees are listed
below with the annual rate, which is typically based on the gross revenues of the
utility:
Entergy 5.20% of gross revenue collection for the
current calendar year or $8.8 million,
which-ever is greater
CenterPoint Energy 5.20% of gross revenue for the current
calendar year or $2.1 million, whichever is
greater
AT&T (Local Land Lines) 7.32% of local exchange access line
charges for the previous calendar year
All Other Local Land Lines 7.32% of local exchange access line
charges for the previous calendar year
Comcast Cable 5.00% of gross revenues
Central Arkansas Water 10.00% of gross revenues from water
sales to customers within the City plus
0.1545 times 20% of the book value of the
Water Works system inside the City limits
WasteWater Utility 10.00% of gross revenues
Fiber Optics 5.00% of gross revenues
Long Distance Franchise $0.004 per minute of toll calls
95
City of Little Rock, Arkansas 2014 Operating Budget
Overall franchise fee revenues in 2013 were 1.91% higher than 2012 levels.
CenterPoint Energy, the gas utility, experienced significant revenue increases
(19%) due to an increase in the price of natural gas and an almost 15% increase
in usage, the result of an unusually cold winter.
CenterPoint reports its natural gas costs to the Arkansas Public Service
Commission at the end of every October and those rates are passed along to
customers with no profit going to the utility. CenterPoint announced a 5.24% rate
increase for the first quarter of 2014. Certain franchise fee revenues, such as
Entergy, CenterPoint, and Central Arkansas Water are directly impacted by the
weather. An on-going national trend is that water consumption continues to
decrease due to water saving appliances and conservation measures.
A relatively mild 2013 summer resulted in a decrease in Entergy franchise
revenues of 1.67% while usage declined by almost 3%. Entergy Corp. announced
a 4% reduction in rates with the expiration of the Federal Energy Regulatory
(FERC) rider. The elimination of the FERC rider begins on January 1, 2014 upon
Entergy Arkansas, Inc. exiting its parent company (Entergy Corporation System)
and joining the Midwest Independent Transmission System Operation, Inc. The
Energy Cost Rate (ECR) is also expected to decrease slightly. The loss and
reduction in riders are projected to reduce revenues by 5% from 2013 totals.
Central Arkansas Water (CAW) announced a rate increase of 4% for 2014. The
rate increase was necessary to pay debt service on bonds issued to bring the
utility’s two treatment plants to EPA standards as required by the Clean Water Act.
The rate increase is expected to raise an average homeowner’s water bill by 48
cents in 2014. The average increase for a commercial user is expected to be
approximately 3.5%. In 2013, franchise fees received from Central Arkansas
Water were 7.81% lower than in 2012. According to CAW, 2012 was a record year
for total water usage while 2013 was a record low. The majority of the 2013
summer had ample precipitation and mild temperatures.
Little Rock Wastewater revenues increased 10.68% over the previous year. The
majority of the increase was attributed to an 8% increase in the sewer rate.
Wastewater Utility has announced an
overall rate increase of 7% for 2014
with 2.5% of the increase for
residential users. There is no
announced rate increase for 2015.
However, Little Rock’s sewer rate is
scheduled to increase 4.75% in
2016. The announced rate increases
were implemented to comply with the
terms of the Sierra Club lawsuit to
reduce sanitary sewer overflows in
Little Rock. Franchise fee revenues from local land line companies continue to
decline from a peak in 1998. This trend is expected to continue in the foreseeable
future, with more customers migrating from utilization of a home phone (land line)
$6,400,000
$12,800,000
$19,200,000
$25,600,000
$32,000,000
Budget Budget Budget
Actual Adopted Adopted
2012 2013 2014
Utility Franchise
Utility Franchise
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
and a mobile phone to only a mobile phone. Revenue from local land line providers
declined 2.99% in 2013 and are expected to further decrease in 2014.
The downward trend in traditional franchise fee revenues from long distance
providers is a result of an increase in wireless or mobile phone usage for long
distance calls. The franchise fee revenue from long distance actually increased
7.2% in 2013 after an 11% decrease in 2012. The increase in 2013 was attributed
to capturing the smaller long distance providers operating in Little Rock through
the Arkansas Public Service Commission. Long distance revenue is projected to
remain steady in 2014.
Franchise revenue from CenterPoint Energy, the gas utility, significantly improved
(19%) due to an increase in the price of natural gas and an almost 15% increase
in usage associated with the unusually cold winter. CenterPoint accumulates and
stores natural gas for the next heating season. The cost of natural gas makes up
between 70% and 80% of the typical bill. Natural gas prices have increased
approximately 5.6% in the prior twelve (12) months. CenterPoint reports its natural
gas costs to the Arkansas Public Service Commission at the end of every October
and those rates are passed along to customers with no profit to the utility.
CenterPoint announced a 5.24% rate increase for the first quarter of 2014,
however; the increase should be offset by lower consumption, resulting in a
relatively flat growth rate for 2014.
Fiber optic companies, such as AT&T U-Verse and Windstream, are now in direct
competition with Comcast Cable, which has historically been one of the City’s
leading growth franchise customers. Fiber optics franchise revenues remained
steady in 2013. A one-time refund of $46,000 to an exempt non-profit resulted in
an overall decrease in revenues from Windstream. Going forward, the exemption
of sales to the non-profit will result in an $18,000 decrease in franchise revenue
per quarter. Fiber optic companies rarely announce anticipated rate increases in
advance of the actual rate change. Cell phone and Internet usage is not included
in the franchise agreement.
Franchise fee revenues for fiscal year 2014 are forecast to be less than one
percent above 2013 receipts and relatively flat compared to the amended 2013
budget. Utilities may adjust rates during the course of the year which affects
revenues. In addition, severe weather or unusual weather patterns may impact
franchise revenues.
Entergy -4.00%
CenterPoint 5.24%
Waste Water Utility 7.00%
Central Arkansas Water (CAW) 4.00%
SW Bell (AT&T) 0.00%
Local Land Lines 0.00%
Long Distance 0.00%
Fiber Optics 0.00%
Announced Utility Rate Adjustments for 2014
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
BUSINESS LICENSES
Business licenses are required annually for every business operating within the
City limits. License fees are billed, collected, and administered by the City’s
Treasury Management Division. Business licenses continue to be a stable
revenue source with 2013 license fees increasing 3.88% to over $6.3 million. The
increase of over $235,000 for 2013 is attributed to an improved local economy and
aggressive collection of delinquent accounts. 2014 revenues are expected to
remain at 2013 levels with no scheduled rate increases. A business license
committee will review the fairness and equity of the business license fee structure
periodically and provide recommendations to the Board of Directors.
MIXED DRINK PERMITS AND SUPPLEMENTAL TAX
Hotels, restaurants, and bars are required to have a permit in order to sell alcoholic
beverages for on-premises consumption. In addition, a 10% supplemental tax is
levied on public liquor sales and a 5% tax is levied on sales by private clubs within
the City. 2013 mixed drink revenue was 13.43% above 2012 and 8.40% above
the 2013 original budget. The City enjoys a strong working relationship with the
State of Arkansas Alcohol Beverage Control Agency to ensure that every business
in Little Rock with a state alcohol permit is also registered with the Treasury
Management Office. The 2014 budget anticipates an increase of approximately
2.2% over 2013 actual revenues.
BUILDING AND RELATED PERMITS
Building and related permits, which include electrical permits, plumbing permits,
and heating ventilation and air conditioning (hvac) permits, were 8.3% above the
2013 amended budget but almost 2.5% below 2012 actuals. The 2013 budget
was reduced significantly because 2012 included the permitting of several large
apartment complexes, a hospital expansion and a new downtown hotel.
The City’s Planning & Development Department projects construction to remain
stagnant for residential permits, but commercial activity is expected to be above
2013 levels. Commercial projects planned in early 2014 include the new CARTI
campus ($50.7 million), the Residence at Brodie Creek Phase II, and the 72,000
square-foot Little Rock Medical Associates building in midtown. In addition, three
(3) downtown projects are expected to have a significant economic impact in 2014,
including Homewood Suites, MacArthur Commons and Hilton Garden Inn.
Construction of the 325,000 square-foot Gateway Town Center, which will be
home to an upscale outlet mall next to the Bass Pro Shop is planned to begin in
southwest Little Rock in the spring of 2014. Continued favorable interest rates
should continue to spur construction activity in Little Rock.
FINES
Fines and related fees comprise 1.74% of the 2014 budget. 2013 fines and fees
were approximately $260,500 or 9% above the previous year. Over $100,000 of
the increase is attributed to the inclusion of various RiverMarket fees such as
equipment rental, security, etc. in 2013 General Fund revenues. Previously,
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
RiverMarket revenues were included in a separate enterprise fund. Traffic fine
revenues were flat in 2013 but are expected to increase approximately 2.50% from
prior year as additional Police officers funded by the new 5/8 cent sales tax are
deployed. Parking fines increased approximately 25% in 2013 from 2012 totals.
Parking Enforcement attributes the increase in tickets issued to an additional motor
scooter and more operational meters than the previous year. 2013 parking fine
revenues did not experience a significant increase from the installation of the eight
(8) new pay and display solar meters servicing approximately 108 spaces in the
RiverMarket since they were installed in late October. The new meters should
contribute noticeable parking fine revenue in 2014. 2014 parking fines are
projected to be 11% higher than 2013 with the increase in operational meters.
PARK & ZOO REVENUE
General Fund park revenues are generated by three (3) golf courses, tennis fees,
community center fees, athletics fees, summer programs and pavilion rentals.
Prior to 2013, the Zoo, Jim Dailey Fitness & Aquatic Center, and the municipal golf
courses (Rebsamen, Hindman and War Memorial) were operated as separate
enterprise funds. At the end of 2012, these activities were consolidated into the
General Fund. General fund park and zoo revenues are expected to increase
11.60% or $1,169,000 from one year ago, primarily due to increased Zoo
admission charges and the reopening of Hindman Golf Course which was
renovated in 2013.
Excluding Transfers In and Donations, Zoo revenues decreased approximately 9%
or $312,040 from one year ago. Similar to park revenues, Zoo revenues are
heavily dependent on weather conditions. The spring of 2013 was unseasonably
cold followed by a very wet summer. Additionally, the popular train at the Zoo was
taken off-line for renovation. Overall, 2014 Zoo revenues are projected to be
approximately 14% higher than 2013 actual revenues. Zoo Admissions account
for approximately $420,000 of the increase to Park and Zoo revenue. Following a
2013 independent study of Zoo rates and services across the country, 2014 Adult
Zoo Admission fees will increase from $10.00 to $12.00, and rates for children,
ages 1-12 will increase to $9.00 from $8.00. Group Admission fees for fifteen (15)
people or more will increase $1.00 to $6.00 per person. The Zoo is in the process
of purchasing a train and renovating the train tracks with plans to make it available
for guests by the start of the spring busy season.
The City operates three (3) public golf courses and relies heavily on greens fees
and concessions to operate these courses. Historically, March is the start of the
busy season for golf courses. Similar to Zoo revenues, the cold spring months
coupled with the wet summer months reduced the number of patrons on each
course in 2013. Overall golf revenues were 16.92% below 2012 levels. 2013
Rebsamen Golf revenues decreased almost 13%. War Memorial revenues
decreased 4.79% from one year ago and Hindman Golf Course decreased
44.20%. The sharp decline in Hindman revenues were the result of a temporary
closure for the purpose of resurfacing all eighteen holes, including the practice
putting greens and for renovations to the pro shop. The improvements and new
renovations at Hindman are expected to increase 2014 revenues 8.54% over the
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
last full year of revenues. The 2014 Rebsamen golf revenues are projected to be
10.6% over last year, and War Memorial revenues are projected to increase
approximately 3%.
AIRPORT REIMBURSEMENT
The Little Rock National Airport reimburses the City for expenses related to police
and fire protection. In 2013, airport police reimbursements increased 7.77% to
$1.91 million and airport fire reimbursements increased 2.49% to $1.24 million.
Staffing levels and 2014 airport reimbursements should be consistent with 2013
levels. The increases in salaries and healthcare cost will offset the negotiated
$79,000 reduction in police overtime at the airport.
STREET GAS TAX TURNBACK
The City receives state turnback funds directed to the Street Department. The gas
tax turnback is allocated based on the latest census and gallons of fuel consumed.
Basically, 15% of the tax on gasoline consumption goes toward municipal aid or
gas turnback. 2013 revenues were 21.65% higher than 2012, the result of the
passage of Constitutional Amendment No. 1 in the general election of 2012. The
initiative provided additional funding for State, County and City streets and bridges
with a temporary one-half percent (0.5%) sales and use tax for road construction
and maintenance. The ten (10)-year sales tax is effective from July 1, 2013 through
December 2022. The measure increased the per capita funding for city streets
from $52 to $62. Gas turnback funds have been trending downward as a result of
lower gas consumption associated with more fuel efficient automobiles. The State
Highway Department’s turnback projection for 2014, including gas tax, severance
tax and sales tax is $12.1 million. The 2014 Street Turnback estimate includes
proceeds from the new highway 1/2-cent sales tax and severance tax on natural-
gas. Currently, approximately 7% of the turnback is attributed to the natural gas
severance tax. The 2014 budgeted increase of 13.7% is attributed to the first full
year of the new sales tax.
$0
$250,000
$500,000
$750,000
$1,000,000
Budget Budget Budget
Actual Adopted Adopted
2012 2013 2014
Golf Department
Green Fees
Equipment Rental
100
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
BOND & INTEREST FUND
Revenues from this fund were utilized to finance the debt service on the
$70,635,000 Limited Tax Bond Issue, Series 2004. In November 2003, voters
approved the continuance of a 3.3 annual property tax millage for debt service on
the bonds. The bonds were fully redeemed on April 1, 2013. The voters of Little
Rock approved a new annual ad valorem tax at a lesser rate of 3.0 mills at a special
election on September 11, 2012. The reduced millage replaces the previous 3.3
mill tax and is pledged for the financing of $105 million in street and drainage
improvements. On July 15, 2013, the City issued $58,105,000 of general obligation
debt ($42,000,000 for street improvements and $18,000,000 for drainage
improvements). The millage, along with the Homestead Credit, which is monies
generated from a state-wide half-cent sales tax, produced approximately $11
million toward 2013 debt service on the outstanding bonds.
WASTE DISPOSAL
The 2013 Waste Disposal charges for services revenues increased 8.87% over
2012 levels. Sanitation fees revenue increased 5.53% primarily attributable to
delinquent collections. Landfill fees increased almost 57%, the result of a full year
agreement with Waste Management and Waste Corporation for dumping fees.
Revenues from methane gas increased almost 45% as a result of the exclusive
vendor maintaining equipment online for the majority of the year. The monthly
residential rate for sanitation pickup remained at $22.02. There are approximately
58,000 households currently receiving garbage collection services.
In addition, approximately 280 commercial vendors pay an average rate of $33.37
a month for waste disposal services. The 2014 budget for sanitation fees of almost
$16 million is lower than 2013 actuals because it contains no anticipated
delinquent collections. Landfill fees are projected to drop 13% from one year ago
because of a decline from private haulers. In addition, 2013 revenues included a
significant amount of 2012 winter storm debris. Landfill fees are expected to
generate approximately $1,300,000 in 2014. Methane gas captured by the landfill
is piped to a vendor and is expected to generate $135,000 in annual revenues.
$1,000,000
$3,000,000
$5,000,000
$7,000,000
$9,000,000
$11,000,000
$13,000,000
Budget Budget Budget
Actual Adopted Adopted
2012 2013 2014
Street Fund
1/2 County Road Tax
Gas Turnback
101
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
VEHICLE STORAGE
Vehicle Storage revenues are generated from storage fees, wrecker fees, and
auction sales. These revenue sources contributed approximately 80% of total
2013 revenues which was a decrease of 10.3% from one year ago. The largest
decrease was associated with vehicle auctions which declined almost $168,000
from one year ago. 2012 Vehicle Auction revenue was overstated with some
wrecker fees included in the total. The 2014 revenue budget remains flat compared
to 2013 actuals. There were 3,257 tows to the Little Rock Vehicle Storage facility
in 2013 compared to 3,132 in 2012. The average sales price per vehicle auctioned
in 2013 was $601.
PARKING GARAGE FUND
The City of Little Rock operates two downtown parking garages. Garage revenues
are generated by daily and monthly parking fees at the Second and Main Street
Parking Facility and the River Market Parking Garage. In addition to garage fees,
annual business license fees received from the rental and/or leasing of
$0
$4,000,000
$8,000,000
$12,000,000
$16,000,000
$20,000,000
Budget Budget Budget
Actual Adopted Adopted
2012 2013 2014
Waste Fund
Sanitation Fees
Landfill Fees
$140,000
$280,000
$420,000
$560,000
$700,000
Budget Budget Budget
Actual Adopted Adopted
2012 2013 2014
Fleet Services Vehicle Storage Facility
Storage Fees
Wrecker Fees
Vehicle Auctions
102
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
automobiles and trucks, parking meter revenues, and street repair fees collected
from utility companies are pledged to debt service on the bonds issued to construct
the parking garages. Overall Parking Garage revenues were 1.30% lower in 2013
than 2012 but 3.3% higher than budget. Monthly revenues from the Statehouse
and the RiverMarket Garages were 10.14% higher in 2013 and 6.91% over budget.
Daily revenues from both garages remained consistent with 2012. In 2014, daily
RiverMarket parking is expected to increase with the reduction in available parking
spaces downtown.
Street cut revenues decreased over 51% from one year ago when with one fiber
optic company significantly increased the number of street cuts in order to replace
and install new fiber optic lines within the city. Street cut revenue has returned to
more normal levels and is expected to decrease slightly for 2014. Eight (8) new
solar-powered pay parking stations were installed in 2013 on President Clinton
Avenue and will be online for a full year in 2014. The installation decreased the
number of free parking spaces at the RiverMarket by 108 spaces. Monthly
revenues from the new meters are expected to generate $4,000 with 50% of this
total committed to reimburse the installation costs of the meters in the first full year.
103
Return to Table of Contents
General Fund Revenues
Sources and Trends
2009-2014
Revenues increased significantly with the implementation of a new
sales tax in 2012. The 5/8-cent portion of the tax for on-going
operations increased the existing 1/2-cent tax to a total of 1.125%.
Note: 2011 and 2012 Actual revenues have been adjusted to reflect
the consolidati on of the River Market, Golf, Jim Dailey Fitness &
Aquatic Center, and Zoo Funds with the General Fund.
104
Return to Table of Contents
Expenditures
CITY OF LITTLE ROCK
2014 BUDGET SUMMARY
ALL FUNDS EXPENSES
$237,965,157
Street
Fund
8.14%
Fleet
Services
5.52%
Waste
Disposal
7.42%
General
Fund
77.43%
Vehicle Storage
Facility
.56%
Parking
Garages
.93%
105
Return to Table of Contents
2012 2013 2013 2014 13/14 %
GENERAL FUND ACTUAL (1) ADOPTED AMENDED* ADOPTED DIFF CHANGE
General Administrative $22,014,866 $20,771,516 $20,400,162 $20,296,290 ($103,872) -0.51%
Board of Directors 217,312 234,774 282,447 338,527 56,080 19.86%
Community Programs 354,736 358,428 362,235 388,081 25,846 7.14%
City Attorney 1,497,920 1,706,756 1,584,169 1,769,774 185,605 11.72%
District Court First Division 1,149,358 1,381,441 1,278,561 1,392,505 113,944 8.91%
District Court Second Division 1,127,676 1,222,308 1,211,957 1,247,286 35,329 2.92%
District Court Third Division 550,961 565,562 561,888 627,185 65,297 11.62%
Finance 2,772,119 3,006,838 2,986,382 3,136,992 150,610 5.04%
Human Resources 1,334,084 1,549,857 1,548,499 1,632,677 84,178 5.44%
Information Technology 3,583,744 4,478,965 3,930,001 4,358,322 428,321 10.90%
Planning Development 1,837,969 2,499,148 2,129,139 2,583,968 454,829 21.36%
Housing & Neighborhood Programs 4,073,655 5,534,697 4,944,864 5,673,839 728,975 14.74%
Public Works 962,161 1,138,346 1,025,434 1,166,482 141,048 13.75%
Parks & Recreation 7,475,977 9,534,163 8,785,775 9,739,691 953,916 10.86%
River Market 1,185,528 1,197,800 1,197,800 1,208,675 10,875 0.91%
Golf 2,354,974 2,081,552 2,274,838 2,187,165 (87,673) -3.85%
Jim Dailey Fitness and Aquatic Center 864,202 891,475 803,405 896,565 93,160 11.60%
Zoo 5,315,033 6,091,304 5,896,684
6,488,801 592,117 10.04%
Fire 41,413,487 39,167,052 44,364,845 45,774,586 1,409,741 3.18%
Police 59,187,490 58,401,831 64,209,117 67,200,859 2,991,742 4.66%
Vacancy Savings (3,900,000) (5,000,000) (5,000,000)
Sub-total General Operating 159,273,252 157,913,813 169,778,202 173,108,270 3,330,068 1.96%
TRANSFERS OUT/OTHER EXPENSES
Transfer out to Street Fund 886,071 1,082,000 1,282,000 1,082,000 (200,000) -15.60%
Special Projects/PIT 12,946,749 9,505,347 9,829,347 9,074,260 (755,087) -7.68%
Waste Disposal 1,475,240 -
Police & Fire Pension 1,000,000 -
Contingency/Reserve 1,710,000 1,000,000 1,000,000
Zoo, Golf, Fitness - Consol. with Gen. Fund 11,827,285
Sub-total of Transfers Out 27,135,345 13,297,347 11,111,347 11,156,260 44,913 0.40%
TOTAL GENERAL FUND 186,408,597 171,211,160 180,889,549 184,264,530 3,374,981 1.87%
OTHER FUNDS 2,186,000
Public Works - Street 15,696,875 17,594,796 17,594,796 19,363,696 1,768,900 10.05%
Fleet Services 11,622,523 12,616,069 12,866,069 13,135,688 269,619 2.10%
Vehicle Storage Facility 1,284,946 1,293,257 1,293,257 1,321,150 27,893 2.16%
Waste Disposal 16,574,747 17,688,470 17,688,470 17,655,926 (32,544) -0.18%
Parking Garages 1,861,831 2,179,806 2,179,806 2,224,167 44,361 2.04%
Sub-total Other Operating Funds 47,040,922 51,372,398 51,622,398 53,700,627 2,078,229 4.03%
TOTAL ALL FUNDS 233,449,519$ 222,583,558$ 232,511,947$ 237,965,157$ 5,453,210$ 2.35%
* The 2013 Amended Budget includes a reduction in departmental budgets for vacancy savings achieved throughout the year.
Vacancy savings represents savings from authorized but unfilled positions. The 2013 vacancy savings goal was fully realized.
(1) Numbers have been adjusted to reflect the consolidation of the River Market, Golf, Fitness and Aquatics Center, and Zoo Enterprise Funds with the
General Fund.
CITY OF LITTLE ROCK
2014 OPERATING & OTHER BUDGETED EXPENDITURES
106
Return to Table of Contents
$0
$20,000,000
$40,000,000
$60,000,000
$80,000,000
2012 2013 2014
Police Fire
All Others General Administration
Transfers Parks & Recreation
General Government
Summary of Appropriations
2012-2014
107
Return to Table of Contents
2012 2013 2014
CATEGORY Actual (1) Budget (1) Budget
Salaries Wages and Employee Benefits $122,039,259 $121,361,267 $137,290,586
Supplies and Materials 5,898,410 6,697,932 6,403,155
Repairs and Maintenance 5,997,377 6,500,607 6,796,658
Contractual 20,759,135 20,557,903 20,914,528
Capital Outlay 167,650 400,062 380,000
Debt Service 4,411,421 2,396,042 1,323,343
Transfers 27,135,345 13,297,347 11,156,260
Net City Expenditures $186,408,597 $171,211,160 $184,264,530
Staffing Level 1,676 1,696 1,708
Ratio 9.01 9.92 9.28
GENERAL FUND SUMMARY
EXPENDITURES BY CATEGORY
(1) 2012 Actual expenditures were adjusted to reflect the consolidation of the River Market,
Golf, Fitness and Aquatics, and Zoo Enterprise Funds with the General Fund.
8.50
9.00
9.50
10.00
2012 2013 2014
STAFFING LEVEL PER MILLION DOLLARS BUDGETED
108
Return to Table of Contents
2012
A
ctual
Expend. (1)
2013
A
dopted
Budget
2014
Adopted
Budget
GENERAL FUND
GENERAL ADMINISTRATIVE
101001 City Clerk 181,167$ 173,253$ 189,276$
101002 Administrative & General 16,973,940 15,805,839 14,763,384
101003 Employee Benefits 3,262,791 3,226,212 3,468,472
101004 Racial and Cultural Diversity 142,112 199,255 150,368
101006 Mayor & City Manager Administration 1,093,163 1,021,011 1,374,533
101007 Emergency Management 64,035 56,533 59,668
101008 Small & Minority Women Owned Bus. Dev. 53,906 55,117 55,061
101009 Little Rock Television 243,752 234,296 235,528
Total General Administrative 22,014,866 20,771,516 20,296,290
BOARD OF DIRECTORS
101111 Board of Directors 217,312 234,774 338,527
COMMUNITY PROGRAMS
101501 Administration 278,517 285,167 299,358
101503 Operations 76,219 73,261 88,723
Total Community Programs 354,736 358,428 388,081
CITY ATTORNEY
101801 City Attorney 1,497,920 1,706,756 1,769,774
LITTLE ROCK DISTRICT COURT
102101 District Court First Division 1,149,358 1,381,441 1,392,505
LITTLE ROCK DISTRICT COURT
102201 District Court Second Division 1,127,676 1,222,308 1,247,286
LITTLE ROCK DISTRICT COURT
102301 District Court Third Division 550,961 565,562 627,185
FINANCE
102501 Administration 494,260 538,939 576,786
102515 Budget 161,518 168,746 173,999
102520 Internal Audit 157,361 164,529 169,346
102530 Accounting and Reporting 459,417 484,392 499,843
102531 Accounts Payable 259,955 310,154 331,036
102535 Payroll 192,075 206,675 212,873
102540 Treasury Management 511,963 556,924 573,309
102550 Purchasing 221,168 219,536 262,640
102555 Print Shop 118,412 96,629 68,673
102560 Grants Management 195,989 260,314 268,487
Total Finance 2,772,119 3,006,838 3,136,992
HUMAN RESOURCES
102701 Human Resources 1,334,084 1,549,857 1,632,677
INFORMATION TECHNOLOGY
103001 Administration 733,711 1,004,591 1,011,402
103010 Application Programming 983,621 1,381,555 1,205,301
103030 Networking 1,866,412 2,092,819 2,141,619
Total Information Technology 3,583,744 4,478,965 4,358,322
CITY OF LITTLE ROCK
2014 OPERATING EXPENSES
109
Return to Table of Contents
2012
A
ctual
Expend. (1)
2013
A
dopted
Budget
2014
Adopted
Budget
CITY OF LITTLE ROCK
2014 OPERATING EXPENSES
PLANNING AND DEVELOPMENT
103301 Administration & Budget 243,023 279,360 309,532
103310 Planning 232,306 427,316 430,229
103320 Zoning & Subdivision 632,257 840,113 856,908
103330 Building Codes 730,384 952,359 987,299
Total Planning and Development 1,837,969 2,499,148 2,583,968
HOUSING AND NEIGHBORHOOD PROGRAMS
103501 Administration 270,993 337,598 356,306
103510 Animal Services 887,001 1,175,865 1,162,608
103520 CDBG - Housing Programs 4,022 55,490 5,157
103530 Neighborhood Programs 1,848,730 2,793,911 2,936,213
103539 Neighborhood Alert Centers 629,604 680,602 744,129
103540 Neighborhood Resource Center 208,126 229,045 230,755
103550 Environmental Services 225,179 262,186 238,671
Total Housing and Neighborhood Programs 4,073,655 5,534,697 5,673,839
PUBLIC WORKS
104010 Building Services 962,161 1,070,935 1,095,023
104020 Asset Management 67,411 71,459
Total Public Works 962,161 1,138,346 1,166,482
PARKS AND RECREATION
104501 Administration 381,088 392,583 448,055
104503 Design Scheduling 338,478 351,456 308,473
104510 Resources Administration 339,091 450,586 464,904
104511 Cultural Museum 144,100 199,004 198,913
104512 Therapeutic 110,111 131,639 173,329
104521 Development and Maintenance 116,231 142,297 126,258
104522 Operations and Improvement Development 824,174 1,140,318 1,148,078
104523 Park Maintenance 1,930,630 2,261,195 2,407,313
104524 Horticulture 657,198 948,506 929,517
104525 Urban Forestry 241,549 399,162 449,953
104530 Recreation Administration 26,288 157,245 160,733
104531 Community Center Administration 147,451 121,066 113,169
104532 Dunbar Community Center 378,886 416,281 441,096
104533 East Little Rock Recreation Center 68,018 96,118 79,241
104534 Senior Programs 58,597 103,354 102,900
104536 Southwest Community Center 463,754 626,416 640,472
104537 Stephens Community Center 216,865 244,195 252,724
104538 The Centre at University Park 143,738 307,258 327,231
104556 Athletics/Playgrounds 576,894 591,601 596,296
104557 Tennis Center Operations 263,565 370,703 287,969
104558 N.W. Hill Community Complex 49,272 83,180 83,067
Total Parks and Recreation 7,475,977 9,534,163 9,739,691
RiverMarket 1,185,528 1,197,800 1,208,675
Golf
104701 Administration 10,568 12,262 94,495
104710 Rebsamen Golf Pro 439,853 387,961 391,941
104711 Rebsamen Golf Maintenance 660,911 520,526 521,777
104712 Rebsamen Pro Golf Concessions 88,935 58,533 58,533
104720 War Memorial Golf Pro 273,807 253,693 257,262
104721 War Memorial Golf Maintenance 297,578 302,582 314,459
104740 Hindman Pro Golf 323,388 288,692 292,934
104741 Hindman Golf Maintenance 259,933 257,303 255,764
Total Golf Fund 2,354,974 2,081,552 2,187,165
110
Return to Table of Contents
2012
A
ctual
Expend. (1)
2013
A
dopted
Budget
2014
Adopted
Budget
CITY OF LITTLE ROCK
2014 OPERATING EXPENSES
Jim Dailey Fitness and Aquatic Center 864,202 891,475 896,565
ZOO
106501 Zoo Administration 368,596 319,973 322,369
106510 Zoo Concessions 313,345 305,474 306,769
106520 Zoo Education 170,919 243,526 350,311
106530 Zoo Gift Shop 186,329 243,680 243,680
106540 Zoo Membership 54,672 57,966 57,966
106550 Zoo Special Events 106,171 103,430 103,430
106560 Zoo Marketing & Promotions 409,808 462,934 498,097
106570 Zoo Facilities Operation 1,479,190 1,869,698 1,989,065
106580 Animal Management 1,772,210 2,075,473 2,206,573
106590 Visitor Service Administration 453,792 409,150 410,541
Total Zoo Fund 5,315,033 6,091,304 6,488,801
FIRE
105101 Administration 910,806 1,123,694 1,082,358
105102 Fire Pension * 5,396,500 5,556,595
105120 Fire Suppressing and Rescue 33,074,203 35,846,158 37,144,014
105130 Fire Prevention - Investigation 469,598 501,570 512,823
105140 Fire Training 585,464 656,902 579,130
105150 Crash Fire Rescue - Airport 976,916 1,038,728 899,666
Total Fire 41,413,487 39,167,052 45,774,586
POLICE
105201 Administration 2,682,329 2,671,797 3,184,485
105202 Police Pension * 6,376,216 6,345,547
105210 Internal Affairs 79 28,871
105215 Organized Crime - Intelligence 5,190,690 4,993,388 5,744,576
105220 Training and Crime Prevention 3,097,373 4,209,794 2,233,737
105225 Detectives 5,472,849 5,642,434 5,666,861
105230 Downtown Patrol 9,565,331 9,628,175 11,291,529
105235 Southwest Patrol 7,662,053 8,732,863 8,354,085
105240 Special Operations 156,383
105245 WW Willams Northwest Substation 7,868,464 9,373,102 9,979,196
105250 Airport Police 1,992,419 2,037,813 1,929,214
105255 Police Records Support Service 5,966,901 7,162,320 8,360,054
105260 Communication Center 3,156,403 3,921,274 4,111,575
Total Police 59,187,490 58,401,831 67,200,859
Less Vacancy Reduction (3,900,000) (5,000,000)
General Fund Operating Total 159,273,252 157,913,813 173,108,270
TRANSFER/OUT OTHER EXPENSES
Transfer out to Street Fund 886,071 1,082,000 1,082,000
Grant Fund 912,027
Special Projects/PIT 12,946,749 8,593,320 9,074,260
Waste Disposal (Recycling) 1,475,240
Police & Fire Pension 1,000,000
Contingency/Reserve 1,710,000 1,000,000
Zoo, Golf, Fitness - Consol. with General Fund 11,827,285
Sub-total 27,135,345 13,297,347 11,156,260
GENERAL FUND TOTAL 186,408,597 171,211,160 184,264,530
* Actual 2012 Fire and Police Pension include pension contributions supported by a separate property tax levy and State
Pension Turnback funds. The 2014 budget includes an allocation for this purpose.
111
Return to Table of Contents
2012
A
ctual
Expend. (1)
2013
A
dopted
Budget
2014
Adopted
Budget
CITY OF LITTLE ROCK
2014 OPERATING EXPENSES
PUBLIC WORKS - STREET
204001 Administration 1,711,248 1,091,376 1,058,292
204002 Operations Administration 541,941 594,215 1,229,701
204003 Street and Drainage Maintenance 5,636,174 7,447,804 8,586,915
204005 Storm Drain Maintenance 791,093 972,911 925,032
204006 Work Pool 141,985 152,861 170,122
204007 Resource Control and Scheduling 357,774 388,487 406,340
204008 Control Devices 800,778 916,892 912,809
204010 Signals 836,908 915,973 917,220
204015 Parking Meters 95,647 101,924 106,689
204020 Civil Engineering 1,289,866 1,356,413 1,486,133
204025 Traffic Engineering 3,291,519 3,379,204 3,277,281
204030 Parking Enforcement 201,942 276,736 287,162
Total Street Fund 15,696,875 17,594,796 19,363,696
FLEET SERVICES
600001 Administration 675,071 556,740 825,640
600011 Acquisition & Disposal 7,144,118 7,773,805 7,823,780
600020 Financial Management 224,782 417,637 308,520
600031 Maintenance Administration 3,578,552 3,867,887 4,177,748
Total Fleet Services 11,622,523 12,616,069 13,135,688
VEHICLE STORAGE FACILITY 1,284,946 1,293,257 1,321,150
WASTE DISPOSAL
603101 Administration 2,480,922 2,001,270 1,907,192
603110 Collection 9,905,367 10,874,270 11,357,804
603120 Disposal 3,323,256 3,880,762 3,608,284
603125 Composting 482,165 597,568 563,746
603130 Waste Management 383,037 334,600 218,900
Total Waste Disposal Fund 16,574,747 17,688,470 17,655,926
PARKING GARAGES 1,861,831 2,179,806 2,224,167
GRAND TOTAL ALL FUNDS 233,449,519$ 222,583,558$ 237,965,157$
(1) 2012 Actual numbers have been adjusted to reflect the consolidation of the River Market, Golf, Fitness and Aquatics Center,
and Zoo Enterprise Funds with the General Fund.
112
Return to Table of Contents
CITY OF LITTLE ROCK
2014 ALLOCATION OF
FULL TIME PERSONNEL
Police
33.93%
Fire
19.95%
Parks
7.20%
All Other
General Fund
17.06%
Fleet
3.60%
Street
10.09%
Waste
5.36%
Zoo
2.80%
Police 716 Fire 421 Street 213
Waste 113 Zoo 59 All Other 360
General
Fleet & Vehicle Fund
Storage Facility 76 Parks 152
113
Return to Table of Contents
2012 2013 2014
Adopted Adopted Adopted
Budget Budget Budget
General Fund
General Administrative 26 26 31
Board of Directors 1 1 1
Community Programs 8 10 10
City Attorney 18 18 18
District Court First Division 21 21 21
District Court Second Division 17 17 17
District Court Third Division 7 7 8
Finance 40 41 41
Human Resources 19 19 19
Information Technology 38 39 39
Planning & Development 39 39 39
Housing & Neighborhood Programs 96 103 103
Public Works - General 13 13 13
Parks & Recreation 117 119 122
Golf 21 21 21
Jim Dailey Fitness Center 9 9 9
Zoo 56 57 59
Fire 421 421 421
Police 709 715 716
Subtotal General Fund 1,676 1,696 1,708
Other Funds
Public Works - Street 211 215 213
Fleet Services 59 61 61
Vehicle Storage Facility 15 15 15
Waste Disposal 112 113 113
Subtotal Other Funds 397 404 402
Total Personnel 2,073 2,100 2,110
CITY OF LITTLE ROCK
FULL TIME PERSONNEL BUDGET SUMMARY
114
Return to Table of Contents
CITY OF LITTLE ROCK
FULL-TIME PERSONNEL AUTHORIZATIONS
2010 - 2014
2016 2016
2073
2100
2110
2000
2020
2040
2060
2080
2100
2120
2140
2010 2011 2012 2013 2014
EMPLOYEES
The net change in personnel between 2013 and 2014 total positions are as indicated
in the chart below.
2013 Adopted Budget 2,100
General Administrative 5
District Court Third Division 1
Parks and Recreation 3
Zoo 2
Police 1
Street (2)
2014 Adopted Budget 2,110
115
Return to Table of Contents
CITY OF LITTLE ROCK
2014 GENERAL FUND EXPENDITURES
2012 2013 2014 Increase
Budget Budget Budget (Decrease)
SPECIAL PROJECTS
Children, Youth, & Families (CYF) $5,500,000 $5,500,000 $5,500,000
Facility Improvements 975,000 975,000 975,000
Annual Fleet Replacement 800,000 850,000 850,000
Supplemental Jail Funding (1) 300,000
Homelessness Outreach 250,000 250,000 350,000 100,000
Land Bank 168,420 168,420 84,210 (84,210)
Demolition (Residential & Commercial) (2) 150,000 300,000 (300,000)
Demolition (Residential) (2) 250,000 250,000
Demolition (Commercial) (2) 100,000 100,000
Board & Secure 100,000 100,000 50,000 (50,000)
Weed Lot Maintenance (2) 75,000 150,000 150,000
Curran Hall 35,000 35,000 35,000
Federal & State Legislative Consulting 45,000 45,000 45,000
Environmental Youth (Parks) 37,500 37,500 37,500
American Disability Act (ADA) 30,000 30,000 30,000
Work Boots 25,000 25,000 25,000
Junction Bridge 25,000 25,000 25,000
Sister Cities 20,000 30,000 30,000
Sustainability Summit 20,000 20,000
Neighborhood Challenge Grant 15,000 30,000 30,000
National Night Out 10,000 10,000 10,000
Worldfest 10,000 10,000 10,000
Neighborhood Connection 2,400 2,400 2,400
Total General Fund Projects 8,573,320 8,593,320 8,609,110 15,790
GRANT MATCH
Undesignated 150,000 150,000 150,000
AEDC-CNG Station Grant 114,695 400,000 (400,000)
EPA Main Street Water 165,150 160,150 (5,000)
Cities of Service 140,601 20,000 (120,601)
JARC DOT Van/Drivers for Homeless Center 56,276 (56,276)
Fire Grant Match:
Rescue Truck (20%) 66,714 75,000 75,000
Expanded Fire Program (20%) 10,000 10,000 10,000
Jumpstart (Metroplan) 25,000 50,000 50,000
Total Grant Match Requirement 366,409 912,027 465,150 (446,877)
GRAND TOTA
L
$8,939,729 $9,505,347 $9,074,260 ($431,087)
(1) Increased Jail funding is available in a special project funded by a $20 local fine dedicated
to supplemental jail funding.
(2) The General Fund increased funding for demolition and weed lot maintenance to accommodate
the reduction in funding from Waste Disposal. In addition, the demolition budget was separated.
116
Return to Table of Contents
CITY OF LITTLE ROCK
2014 OPERATING BUDGETS
BY SERVICE PROGRAM CATEGORY
Public Safety
$128,273,569
Public
Health/
Public
Utilities
$19,125,124
Economic
Development
$638,042
Housing &
Neighborhood
Revitalization
$8,168,909
Transportation
$26,456,000
Leisure
Services
$21,477,765
General
Government
$19,840,360
All Other
Expenditures
$13,985,688
$237,965,157
117
Return to Table of Contents
2013 % to 2014 % to
Service/Program Categor
y
Budget Total
B
u
d
get
Total
Public Safety
Police $58,401,831 $67,200,859
Fire 38,128,324 44,874,920
Street Lights, Traffic Signals & Signs 5,212,069 5,107,310
Little Rock District Court First Division 1,381,441 1,392,505
Animal Services 1,175,865 1,162,608
Little Rock District Court Second Division 1,222,308 1,247,286
Children, Youth & Families 5,500,000 5,500,000
Community Programs 608,428 738,081
Pulaski County Regional Detention Facility (1) 1,050,000 1,050,000
Total Public Safety 112,680,266 50.62% 128,273,569 53.90%
Public Health/Public Utilities
Waste Disposal 17,487,970 17,455,426
Little Rock District Court Third Division 565,562 627,185
Arkansas Emergency Physician Foundation 36,000 36,000
Saint Vincent's 25,381 25,381
Storm Drainage 972,911 925,032
Pulaski County Health Department 56,100 56,100
Total Public Health/Public Utilities 19,143,924 8.60% 19,125,124 8.04%
Economic Development/Employment
Little Rock Chamber of Commerce 200,000 200,000
Metroplan 178,042 178,042
Downtown Partnership/Empowerment Zone 160,000 160,000
Metro Little Rock Alliance 100,000 100,000
Total Economic Development/Employment 638,042 0.29% 638,042 0.27%
Housing and Neighborhood & Waste
Disposal Revitalization,
Growth & Development
Planning & Development Department 2,635,448 2,719,768
Alert Centers 680,602 744,129
Neighborhood Resource Center 229,045 230,755
Demolition, Weed Lot Maintenance, Board/Secure 1,021,820 937,610
Housing & Neighborhood Prog. Admin. 3,449,185 3,536,347
Total Housing & Neighborhood
Revitalization, Growth
8,016,100 3.60% 8,168,609 3.43%
CITY OF LITTLE ROCK
ADOPTED OPERATING BUDGETS BY SERVICE PROGRAM CATEGORY
2013 - 2014
(1) Supplemental jail funding is provided by a $20 local jail fine.
118
Return to Table of Contents
2013 % to 2013 % to
Service/Program Categor
y
Budget Total
B
u
d
get
Total
Transportation Services
Central Arkansas Transit Authority 8,208,468 8,922,333
Streets 11,176,156 12,694,833
Parking 378,660 393,851
Parking Garages 2,179,806 2,224,167
Vehicle Storage Facility 1,293,257 1,321,150
Airport Rescue 1,038,728 899,666
Total Transportation Services 24,275,075 10.91% 26,456,000 11.12%
Leisure Services/Cultural Support
/
Conventions & Tourism
Parks & Recreation 9,410,159 9,615,778
Golf 2,173,052 2,278,665
Jim Dailey Fitness Aquatic Center 891,475 896,565
River Market 1,197,800 1,208,675
Zoo 6,091,304 6,488,801
Cultural Institutes:
Arts Center 400,000 400,000
Museum of Discovery 200,000 200,000
MacArthur Military Museum 199,004 198,913
Sister Cities Commission 30,000 30,000
Racial & Cultural Diversity Commission 209,255 160,368
Total Leisure Services/Cultural
Support/Conventions
20,802,049 9.35% 21,477,765 9.03%
G
enera
l
G
overnmen
t
S
uppor
t
Board of Directors 234,774 338,527
General Administrative 10,446,497 6,437,586
Finance 3,006,838 3,136,992
Human Resources 1,574,857 1,657,677
City Attorne
y
1,706,756 1,769,774
Information Technolog
y
4,478,965 4,358,322
Building Services/Asset Management 2,113,346 2,141,482
Total General Government Support 23,562,033 10.59% 19,840,360 8.34%
All
Oth
er
E
xpen
dit
ures
Fleet Services 13,466,069 13,985,688
Total Other Expenditures 13,466,069 6.05% 13,985,688 5.88%
Grand Total $222,583,558 100% $237,965,157 100%
Adopted Operating Budgets by Service Program Category
2013 - 2014
City of Little Rock
119
Return to Table of Contents
$112,294,307
$110,888,572
$126,585,371
$-
$35,000,000
$70,000,000
$105,000,000
$140,000,000
2012 2013 2014
CITY OF LITTLE ROCK
PUBLIC SAFETY REVENUES &
EXPENDITURES
COMPARISIONS
2012 2013 2014
Fire $41,413,487 $39,167,052 $45,774,586
Police 59,187,490 58,401,831 67,200,859
District Court First Division 1,149,358 1,381,441 1,392,505
District Court Second Division 1,127,676 1,222,308 1,247,286
District Court Third Division 550,961 565,562 627,185
Alert Centers 629,604 680,602 744,129
Neighborhood Programs (Rental Inspection) 1,848,730 2,793,911 2,936,213
Animal Services 887,001 1,175,865 1,162,608
Prevention Intervention & Treatment 5,500,000 5,500,000 5,500,000
Public Safety Expenditures $112,294,307 $110,888,572 $126,585,371
General Fund Revenue $180,242,907 $171,211,160 $184,264,530
Percentage of General Fund Expenditures Devoted
to Public Safety 62% 65% 69%
(1) Actual includes contributions to the Police and Fire pension funds in the amount of $11,710,547
supported by a separate Property Tax levy and State Turnback funds. The 2014 budget includes an
allocation for this purpose.
120
Return to Table of Contents
CITY OF LITTLE ROCK
PUBLIC SAFETY OPERATING
EXPENDITURES AS A PERCENTAGE
OF GENERAL FUND REVENUE
2005-2014
$0
$20
$40
$60
$80
$100
$120
$140
$160
$180
$200
2005
Actual
2006
Actual
2007
Actual
2008
Actual
2009
Actual
2010
Actual
2011
Actual
2012
Actual
2013
Forecast
2014
Forecast
(Millions)
General Fund Revenue Public Safety Expenditures
$114.9
$119.7
$137.3
$143.9
$144.1
$141.1
$150.5
$180.2
$171.2
$67.5
$71.5
$85.2
$88.9
$97.2
$94.7
$99.9
$112.3
$110.9
$126.6
$184.3
59% 60% 62% 62% 67% 67% 61% 62% 65% 69%
121
Return to Table of Contents
This page left blank intentionally.
122
Return to Table of Contents
Capital Improvements
City of Little Rock, Arkansas 2014 Operating Budget
CAPITAL FUNDING
State laws limit the use of borrowing for municipal purposes. General obligation
bonds, when approved by voters and secured by property tax levies, may be
issued for long-term capital improvements. Revenue bonds are not general
obligations of the City but are secured by specific revenues associated with a
project. They may be issued for certain specified municipal purposes.
The Capital Improvement Program (CIP) is a multi-year plan for capital
expenditures to replace and expand the City’s infrastructure, vehicles and
equipment. The program is updated annually to reflect the latest priorities, updated
cost estimates and available revenue sources.
The purpose of the CIP is to fund capital projects and capital acquisitions that will
be of a long-term benefit to the citizens of Little Rock. The CIP is financed over a
period of time due to the long-term benefit of the projects. For program purposes,
the City defines a capital improvement as a major improvement or acquisition that
results in a capital asset costing more than $5,000 and having a useful life
(depreciable life) of two years or more. Exceptions are for infrastructure assets
which are defined as having a constructed cost greater than $250,000.
Capital assets are depreciated using the straight-line method over their estimated
useful lives ranging from 15 – 50 years for infrastructure, 10 – 75 years for buildings
and 3 - 25 years for land improvements, vehicles and equipment. Depreciation
expense is charged directly to the department/function based on the department
that utilizes the related asset.
In addition, appropriations for special projects are made each year by the Mayor
and Board of Directors to finance specific events and capital outlays. These
projects are carried forward from year to year until they are fully expended or
repealed by the Mayor and Board of Directors by ordinance.
CAPITAL PROJECT FUNDS PROVIDED BY BOND ISSUES
These funds are derived from the proceeds of selling City general obligation bonds
and are used for major capital improvements.
2007 Capital Improvements – The 2007 Capital Improvements were issued to
finance the advance refunding of the City’s Capital Improvement Revenue
Bonds1998A and to pay the cost associated with the issuance of the Series 2007
Bonds. The Series 2007 bonds are not a general obligation of the City but are a
special obligation payable solely from the revenue received by the City from all
franchise fees charged to public utilities for the privilege of using the City’s streets
and right-of-way. The remaining funds available from interest earnings on these
bond funds have been allocated to the South Loop and Scott Hamilton Drive
improvements described in the Other Significant Non-recurring Capital
Improvements section.
123
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
2009A and 2009B Parks and Recreation Capital Improvements – The 2009A
Capital Construction Revenue Bonds were issued for the purpose of acquiring,
constructing, equipping renovating, expanding and refurbishing certain zoo, parks
and recreation facilities of the City. The 2009A bonds provided approximately $6.8
million for Parks and Zoo projects. The Series 2009B Bonds were issued for the
purpose of currently refunding the outstanding Capital Improvement Revenue
Bonds (Parks and Recreation Projects), Series 1998A; to fund a debt service
reserve, funding an operating reserve, and to pay the cost associated with the
issuance of the Series 2009B Bonds.
2012 Library Construction and Refunding Bonds – The 2012 Library
Construction and Refunding Bonds are limited obligations payable through 2032.
The Library Bonds were issued to finance the cost of acquiring, constructing, and
equipping capital improvements to the City’s public libraries operated by the
Central Library System, to refund the City’s outstanding Library Construction
Bonds, Series 2004A, and to pay the cost of issuance of the bonds. The bonds
are limited tax obligations payable solely from a 0.9 mill annual ad valorem tax.
2013 Capital Improvement Bonds – On September 11, 2012, citizens of Little
Rock approved the issuance of $105 million in Capital Improvement Bonds for the
purpose of Street and Drainage infrastructure improvements. The bonds are
limited tax general obligations secured by all proceeds derived from a separate 3.0
mills annual ad valorem tax on real and personal property located within the City.
The first series of bonds were issued in July 2013 in the amount of $58,105,000.
A second series will likely be issued around 2016. Overall, a maximum of
$73,500,000 will be issued to finance street improvements and a maximum of
$31,500,000 will be issued to finance drainage projects throughout the City.
CAPITAL PROJECT FUNDS PROVIDED BY OTHER SOURCES
Short-term Financing – Accounts for proceeds of Short-term Financing, five year
notes, issued for the purpose of acquiring, constructing, installing, or renting real
property or tangible personal property having an expected useful life of more than
one year under and pursuant to and in full compliance with the Constitution and
laws of the State of Arkansas, including particularly Section 2 of Amendment 78 to
the Constitution of the State of Arkansas, and pursuant to an ordinance of the
Board of Directors of the City.
The City issued two short-term financing notes in 2012 and in 2013 in the amount of
$18,850,000 and $7.7 million to accelerate the completion of public safety projects
that will ultimately be funded by the ten (10) year three-eighths (3/8)-cent sales tax.
Proceeds of the three-eighths (3/8)-cent sales tax will be utilized to make principal
payments on the notes. Interest payments on the notes will be appropriated from
general fund revenues. In addition, the City may consider issuance of a new short-
term financing note in 2014 to further completion of the public safety projects and
fund additional information technology needs.
124
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Land and Buildings
Southwest Fire Station $459,000
459,000
Equipment and Vehicles
Public Safety Radio System Upgrade 2,891,000
311/911 Communications Software 2,350,000
Information Technology Capital 2,000,000
7,241,000
$7,700,000
Public Safety Buildings, Equipment, and Vehicles Total
Land and Buildings
12th Street Mid-town Police Station $7,976,000
West Little Rock Police Station 1,000,000
West Little Rock Fire Station 543,000
Southwest Fire Station - Land Acquisition 366,000
9,885,000
Equipment and Vehicles
Public Safety Radio Communication System Upgrade 6,109,000
Fleet - Police vehicles for new officers and Fire Truck for
West Little Rock Station
2,189,000
Code Enforcement Vehicles and Equipment 397,000
8,695,000
$18,580,000
The 2012 note included funding for the following projects:
The 2013 note included funding for the following projects:
Potential Projects for the 2014 Short-term Note:
Land and Buildings
12th Street Police Station - Final Phase $1,994,000
1,994,000
Equipment and Vehicles
Information Technology Capital 1,000,000
1,000,000
$2,994,000
125
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
2012 – 2021 Capital Project Fund – Accounts for the proceeds of a three eighths
(3/8)-cent local sales tax, implemented on January 1, 2012 for the purpose of
funding capital projects over a ten (10) year period. The temporary sales tax will
sunset in 2021 and is expected to raise approximately $196 million over the ten
(10) year period for the following projects:
3/8-Cent Sales Tax Capital Project Description Project Cost Estimate
Public Safety:
Police:
Police Equipment $303,000
Public Safety Radio System Upgrade 9,000,000
911 / 311 Communications Software 2,600,000
12
th
Street Mid-Town Police Station 9,970,000
Main Police Headquarters & Courts Building 9,000,000
West Little Rock Police Station 1,000,000
Fire:
West Little Rock Fire Station 800,000
Southwest Fire Station 4,050,000
Housing and Neighborhood Programs:
Code Enforcement Vehicles and Equipment 397,000
Animal Village Expansion 602,000
Fleet for New Public Safety Initiatives:
Fleet for new Police Staffing and Fire Stations 3,567,000
Total Public Safety $41,289,000
Public Works:
Street Resurfacing and Maintenance, and
Street and Drainage Reconstruction and Traffic
Signals
$67,500,000
Sidewalks 4,500,000
Total Public Works $72,000,000
126
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
3/8-Cent Sales Tax Capital Project Description Project Cost Estimate
Jobs/Economic Development:
Port Expansion: land acquisition, utilities, streets $10,000,000
Research Park: land acquisition, utilities, streets 22,000,000
Economic Development Infrastructure 6,000,000
Total Jobs/Economic Development $38,000,000
Parks and Recreation, Zoo and Tourism:
Parks and Recreation:
Equipment for Expanded Maintenance $250,000
Park Upgrades 4,500,000
West Central Community Center 6,000,000
Senior Center 980,000
Ottenheimer Center 54,000
War Memorial Park 500,000
MacAuthur Park & Museum 500,000
Otter Creek Park 500,000
Crump Park 1,000,000
Natural Steps Ball Complex 500,000
Western Hills Park 1,000,000
Trails 1,500,000
Zoo:
Capital Upgrades 8,000,000
Tourism:
State Fair Infrastructure 3,000,000
Total Parks and Recreation, Zoo and Tourism $28,284,000
Other Priorities:
Fleet Replacement $9,250,000
Information Technology Capital 7,020,000
Total Other Priorities $16,270,000
Grand Total $195,843,000
127
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
2014 CAPITAL IMPROVEMENTS
In September 2012, citizens authorized the issuance of up to $105 million in limited
tax general obligation bonds for street and drainage improvements. The City
issued the first series of bonds for this purpose in the amount of $58,105,000 in
July 2013.
In September 2011, citizens approved a new three-eighths (3/8)-cent sales tax
dedicated to capital improvements. The sales tax became effective on January 1,
2012. The tax is temporary, with a ten (10) year sunset.
In 2009 the City refunded the 1998 Parks and Recreation Bonds and issued new
bonds to fund approximately $6.8 million in Parks and Zoo improvements. In
addition, the City placed an emphasis on obtaining grants under the American
Recovery and Reinvestment Act.
Limited funding for capital improvements has also been available from capital grant
awards or from the remaining unspent proceeds and interest in the 2007 Capital
Improvements Bond fund, and Short Term Financing. The remaining balances are
authorized primarily for street and drainage improvements, waste collection and
disposal vehicles and equipment, and fire and police buildings and equipment.
The injection of new capital provided by the three-eighths (3/8)-cent sales tax,
bond issues, grant funds, and short-term financing, and the future impact of
completed projects on ongoing operations is considered in preparation of annual
departmental operating budgets.
Projects in the CIP can include:
Obligations for labor and materials and contractors involved in completing
a project
Acquisition of land or structures
Engineering or architectural services, professional studies, or other
administrative costs
Expenses for City vehicles and equipment
Renovating or expanding City facilities, grounds, or equipment
When both restricted and unrestricted resources are available for use, it is
generally the City’s policy to utilize restricted resources first. For projects funded
by tax-exempt debt proceeds and other sources, the debt proceeds are utilized
first.
Purchased or constructed capital assets are reported at cost or estimated historical
cost. Donated capital assets are recorded at their estimated fair value at the date
of donation.
128
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
MAJOR CAPITAL PROJECTS
Capital expenditures in the amount of approximately $48,250,000 are planned in
2014 and are funded by a variety of sources as described in detail below.
CIP – Significant Routine Capital Expenditures:
These expenditures are recurring in nature, replace existing assets on a rotating
schedule and do not have additional operating expense requirements.
CIP – Significant Non-Routine Capital Expenditures and Projects:
These expenditures occur less frequently and are more material. However; they
also replace existing assets and do not have additional operating expense
requirements.
Department Quanity
Estimated
Cost
Estimated
Useful Life Funding Source
Housing & Neighborhood Programs
CNG F250 Pickup 3 $100,000 6 - 8yrs 5/8-cent Sales Tax - Special Project
Public Works/Street Operations
Bucket Truck 1 98,500 8-10yrs 3/8-cent Sales Tax - Capital Project
Brush Chipper 1 29,000 6-8yrs 5/8-cent Sales Tax - Special Project
Light DutyTruck 1 22,500 6-8yrs 3/8-cent Sales Tax - Capital Project
Public Works/Building Maintenance
CNG VAN 1 35,000 8-10yrs 5/8-cent Sales Tax - Special Project
Parks & Recreation
Various Pieces of Golf Equipment (3 yr lease) TBD 211,000 6-8yrs 3/8-cent Sales Tax - Capital Project
Police Patrol
Various Patrol & Detictive Cars TBD 600,000 6yrs 5/8-cent Sales Tax - Special Project
Zoo
Carts 3 30,000 6 yrs 5/8-cent Sales Tax - Special Project
Fleet
Conversion of CNG vehicles 4 43,000 8-10yrs 5/8-cent Sales Tax - Special Project
$1,169,000
CNG=Compressed Natural Gas
Department Quanity
Estimated
Cost
Estimated
Useful Life Funding Source
Fire
Pumper Truck 1 $475,000 15-20yrs 3/8-cent Sales Tax - Capital Project
Fire Trucks (Lease Program) TBD 500,000 15-20yrs 3/8-cent Sales Tax - Capital Project
$975,000
TBD=To be determined
129
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
CIP - Significant Non-recurring Parks and Zoo Projects Funded by the 2009A
Parks and Recreation Capital Improvement Bonds:
These projects are unusual, non-recurring projects that were all funded wholly or
in a significant part by the issuance of Capital Construction Revenue Bonds.
The 2009A Parks and Recreation Capital Improvement Bonds were issued for the
purpose of acquiring, constructing, equipping renovating, expanding and
refurbishing certain zoo, parks and recreation facilities. The 2009A bonds provided
approximately $6.8 million for Parks and Zoo capital projects. Approximately $6.4
million was spent through 2013 on land improvements, building improvements and
other smaller projects. The remaining funded projects are expected to be
completed in 2014 as indicated below. The estimated operating cost per new acre
of park land with level-two (2) maintenance, including staffing, maintenance and
start up equipment, is approximately $4,500 per acre. After initial startup, ongoing
maintenance is estimated at $4,000 per acre.
War Memorial Park Improvements – War Memorial Park is undergoing a
transformation to create it as a premier park. Improvements are proposed to
increase participation from a large cross section of the community and to become
a destination park from early morning to late at night. Utilizing spaces focused on
Coleman Creek, park upgrades will entail better access and enhancements to the
pond area and along the entire stretch of Coleman Creek; restoration of Coleman
Creek; entry enhancements; approximately one mile of trail; playground; water
feature; new parking areas and supporting amenities.
Estimated Total Project Cost: $1,225,000
2014 Estimated Expenditures: $50,000
Estimated Completion Date: September 2014
Estimated Increase to Operating Expenditures: Increased operating
expense of $162,690 is projected for staffing, utilities, maintenance, and
supplies based on the acreage of the Park.
Natural Steps Athletic Fields – Located just below Lake Maumelle Dam on
Highway 300, this large flat area is ideal for development of game fields. Land
was donated to the City of Little Rock by Central Arkansas Water and a partnership
will be established to allow development and utilization of several soccer fields, a
playground, restrooms and parking areas.
Estimated Total Project Cost: $1,125,000
Funding Sources: $625,000 2009A Capital Construction Revenue Bonds;
$500,000 3/8-cent sales tax proceeds.
2014 Estimated Expenditures: $900,000
Estimated Completion Date: June 2014
Estimated Increase to Operating Expenditures: Increased operating
expense of $31,500 is projected for staffing, utilities, maintenance, and
supplies based on care for undeveloped acreage.
130
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
CIP - Other Significant Non-recurring Capital Improvements:
These projects are unusual, non-recurring capital improvement projects funded by
the new 3/8-cent sales tax, grant awards, short term financing, private donations
and other sources.
12
th
Street Police Station – The 12th Street Police Station will be a police facility
capable of eventually supporting a police patrol division similar to those currently
in service on Kanis Road in Northwest Little Rock and on Baseline Road in
Southwest Little Rock. The building is anticipated to be approximately 11,000
square feet and will provide office and equipment space for patrol officers and
detectives assigned to the general area surrounding the facility.
Estimated Total Project Cost: $12,500,000
Funding Sources: Short Term Financing allocations, Justice Assistance
Grant funds, CDBG Disaster Grant funds, Seized Money funds, and 3/8 cent
sales tax
2014 Estimated Expenditures: $8,331,000
Estimated Completion Date: August, 2014
Estimated Increase to Operating Expenditures: Increased operating
expense of $125,000 is projected for utilities, maintenance, and supplies,
which will be included in the 2014 Police Department general fund budget
allocation. Existing personnel and equipment will be reassigned to the new
station.
Public Safety Radio System Upgrade – The City’s public safety radio system is
a twenty year old analog 800MHz trunked radio communications network
consisting of three primary tower sites and supporting approximately 5,000
subscribers in Central Arkansas. The system is utilized by most public safety and
local government administrative services in Pulaski County including the City of
Little Rock, North Little Rock, Pulaski County (including 20 volunteer fire
departments), Metropolitan EMS, Maumelle, Central Arkansas Transit, Cammack
Village, Sherwood, and fifteen (15) area hospitals in Pulaski, Saline and Faulkner
counties, comprising over one-third of all hospital beds in the state. The upgrade
will transition the existing analog radio system to digital Association of Public
Communications Officials P25 standards and integrate system infrastructure with
the statewide Arkansas Wireless Information Network (AWIN) system.
Estimated Total Project Cost: $9,000,000
Funding Sources: Short Term Financing allocation, 3/8-cent sales tax
2014 Estimated Expenditures: $420,000
Estimated Completion Date: July, 2014
Estimated Increase to Operating Expenditures: There should not be any
additional operating expense associated with this upgrade; the renewed
maintenance agreement for 2014 was approximately $170,000 less than in
2013.
131
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
West Little Rock Police Station Renovation – The City plans to acquire and
renovate an existing structure in West Little Rock along the Highway 10 corridor.
The station will provide an additional fueling location and mini-substation for
officers assigned to the far west area of Little Rock.
Estimated Total Project Cost: $1,000,000
Funding Sources: Short Term Financing allocation, 3/8-cent sales tax
2014 Estimated Expenditures: $1,000,000
Estimated Completion Date: December 2014
Estimated Increase to Operating Expenditures: Increased operating
expense of approximately $150,000 is projected for fuel, utilities, and
supplies, which will be included in the 2015 Police Department budget
allocation.
911/311 Communications Software – Upgrade of the existing telephone and
recording systems in the Communications Center; upgrade of the 9-1-1 Computer
Assisted Dispatch (CAD) software; upgrade of the existing 3-1-1 Customer Service
Request (CSR) software; upgrade of consoles, furnishing and hardware support
environment in the Communications Center to accommodate new systems.
Estimated Total Project Cost: $2,600,000
Funding Sources: Short Term Financing allocation, 3/8-cent sales tax
2014 Estimated Expenditures: $800,000 (encryption, recording and
facilities improvements; telephone system upgrades already completed.)
Estimated Completion Date: December 2015
Estimated Increase to Operating Expenditures: There should not be any
additional operating expense associated with this upgrade, as the
anticipated maintenance expense is expected to be comparable to or less
than current maintenance requirements.
Southwest Little Rock Fire Station – The Little Rock Fire Department is
beginning plans for a new fire station in Southwest Little Rock, which will be funded
with proceeds of the 3/8-cent sales tax. The City plans to complete the purchase
of land for the new station in 2014 and begin architectural plans. Construction of
the station has been delayed until 2016.
Estimated Total Project Cost: $4,050,000
Funding Sources: Short-term financing allocation; 3/8-cent sales tax
proceeds
2014 Estimated Expenditures: $800,000
Estimated Completion Date: December 2016
Estimated Increase to Operating Expenditures: Twenty-four (24) new fire
fighters will be added to staff the new station at an estimated first year cost
of approximately $1.6 million. In addition, increased operating expense of
$50,000 is projected for utilities and supplies, which will be included in the
Fire Department budget allocation upon completion of the new facility.
132
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
West Central Community Center – The West Central Community Center and
Pool will be constructed over the next few years with proceeds from the new 3/8-
cent sales tax. The community center will be an approximately 24,000 square feet
facility to provide life style leisure and educational choices for family members as
well as a unique pool feature for outdoor water experiences.
Estimated Total Project Cost: $6,000,000
Funding Sources: 3/8-cent sales tax proceeds
2014 Estimated Expenditures: $1,300,000
Estimated Completion Date: July 2015
Estimated Increase to Operating Expenditures: The operating expense
for staffing, utilities, maintenance, and supplies is expected to be
approximately $565,000 in the first full year of operation. Parks staff will
determine costs in preparation for the 2015 operating budget.
Information Technology.The City will be upgrading various technology
infrastructure, hardware and software over the next ten (10) years with proceeds
from the temporary 3/8-cent sales tax. The total estimated allocation of proceeds
for technology expenditures from 2012 – 2021 is $7,020,000. The 2013 and 2014
funding will primarily be utilized for an active/active data center.
Estimated Total Project Cost: $7,020,000
Funding Sources: 3/8-cent sales tax proceeds
2013 Estimated Expenditures: $1,295,000
Estimated Completion Date: December 2014
Estimated Increase to Operating Expenditures: Ongoing maintenance
expenditures will be phased in with the completion of various projects and
will be included in the repairs and maintenance budget for the Information
Technology Department operations each year.
Scott Hamilton Drive – The City of Little Rock expects to receive approximately
$2.25 million from federal highway grants and the Arkansas State Highway
Department’s Transportation Improvement Program for improvement to the street
from Baseline Road to JE Davis Drive. The AHTD will handle the land acquisition
process and construction for the City.
Estimated Total Project Cost: $2,885,000; Includes engineering and
construction cost of $2,249,000 and right-of-way and utility relocation cost of
$636,000.
Funding Sources: Federal Highway Administration Discretionary Allocation
through Metroplan for Local Urban Projects (LUZA) - $2,250,000; 1998
Infrastructure Bonds - $635,000;
2014 Estimated Expenditures: $100,000
Estimated Completion Date: 2014
Estimated Increase to Operating Expenditures: Not applicable.
Maintenance will be performed with current annual public works allocations
for street maintenance in the Street Fund budget.
133
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
9
th
Street Extension – The City of Little Rock received a $1,900,000 grant from
the U.S. Department of Commerce, Economic Development Administration to
expand east 9th Street from its current termination point at Bond Street to the
Dassault Falcon Jet facility at the west side of the Little Rock National Airport. The
construction of a new four lane street will enhance productivity and
entrepreneurship by providing adequate modes of transportation for larger,
commercial vehicles and Dassault's workforce of two-thousand employees. At the
end of 2011, construction was nearly complete on Phase 1 of the project for the
segment of roadway from Bond Street to 6th Street. Construction commenced on
a second phase of the project in 2012 to widen and improve the remaining segment
of the extension from 6
th
Street to Dassault Falcon Jet. In addition, the second
phase includes construction of a traffic signal at the intersection of Bond and 9th
Streets which is complete. The street will be maintained in the future by the
Department of Public Works.
Estimated Total Project Cost: $4,630,000
Funding Sources: American Recovery and Reinvestment Act – Economic
Development Administration Grant $1,900,000; Arkansas Economic
Development Commission $1,800,000; City match funds from the Airport
Enhancement Fund $930,000.
2014 Estimated Expenditures: An estimated $200,000 will be expended in
2014.
Estimated Completion Date: The project was placed in service in 2013
and is now pending final inspection and payment in 2014.
Estimated Increase to Operating Expenditures: Not applicable.
Maintenance will be performed with current annual public works allocations
for street maintenance in the Street Fund budget.
South Loop Grade Separation – The City of Little Rock received approximately
$6.82 million from federal highway administration grants and the Arkansas State
Highway Department’s Transportation Improvement Program for construction of a
new street and railroad overpass connecting Mabelvale West Road to Alexander
Road. The initial right-of-way acquisition process was completed in 2011 and
construction was substantially completed in 2013.
Estimated Total Project Cost: $8.53 million; Includes engineering and
construction cost of $6.88 million and right-of-way and utility relocation cost
of $1.65 million.
Funding Sources: Federal Highway Administration Grants - High Priority
Project Funding $6,822,000; 1988 Capital Improvement Bonds - $1,147,000;
Street Fund $469,700.
2014 Estimated Expenditures: $100,000
Estimated Completion Date: The project was placed in service in 2013
and is now pending final inspection and payment by the AHTD in 2014.
Estimated Increase to Operating Expenditures: Not applicable.
Maintenance will be performed with current annual public works allocations
for street maintenance in the Street Fund budget.
134
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Arkansas River Trail Western Termini of the River Bluffs Section – Little Rock
received funding from the Department of Transportation, Transportation
Alternative Program (TAP) to complete another section of the trail. The new
construction will start from the eastern end of the North Cantrell Road at the Gill
Street Bridge and run along the river of the Dillard Department Store Headquarters’
western property line. The City of Little Rock funded an eight foot connector trail
that will tie trail to the sidewalk on the north side of Cantrell Road.
Estimated Total Project Cost: $626,119
Funding Sources: TAP Grant $390,258; match amount of $97,565 from
the General fund; and capital improvement funds of $138,296
2014 Estimated Expenditures: $626,119
Estimated Completion Date: 2014
Estimated Increase to Operating Expenditures: Not Applicable. Trail
maintenance will be performed with the current allocation included in the
Parks & Recreation budget.
North Central at Gill Street Bridge Replacement – Little Rock expects to receive
a State Aid Bridge Replacement grant from the Arkansas Highway and
Transportation Department. The project will replace an obsolete and deteriorating
bridge over Rose Bayou (Capitol Drain) with a new two lane bridge that will include
dedicated bike lanes for the River Trail.
Estimated Total Project Cost: $650,000
Funding Sources: Metroplan (Federal Highway Administration) $520,000;
and City matching funds $130,000.
2014 Estimated Expenditures: $350,000
Estimated Completion Date 2015
Estimated Increase to Operating Expenditures: Not applicable.
Maintenance will be performed with current annual allocations for street
maintenance in the Street Fund budget and from the Parks and Recreation
maintenance budget.
Arkansas River Trail Union Pacific Bridge – Little Rock received General
Improvement funds from Act 1210 of 2005 and the State of Arkansas to build a
pedestrian/bike bridge over the Union Pacific Rail Road Bridge as part of the
Arkansas River Trail. Construction will begin in the spring of 2014.
Estimated Total Project Cost: $1,033,000
Funding Sources: State of Arkansas General Improvement Fund in the
amount of $1,033,000.
2014 Estimated Expenditures: $1,033,000
Estimated Completion Date: August 2014
Estimated Increase to Operating Expenditures: The operating expenses
are included in the Parks & Recreation budget.
135
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
University Avenue Signal System Optimization – Little Rock received notice
from Metroplan that funding would be available to construct an adaptive traffic
signal control system in the University Avenue corridor from Cantrell Road (State
Highway 10) to Interstate 30. This system would reduce delay at signalized
intersection and improve traffic flow through the corridor.
Estimated Total Project Cost: $1,152,000
Funding Sources: Transportation Improvement Project Funds $921,600;
Street Fund $230,400
2014 Estimated Expenditures: $200,000
Estimated Completion Date: 2015
Estimated Increase to Operating Expenditures: Not applicable.
Maintenance will be performed with current annual public works allocations
for street maintenance in the Street Fund budget.
Geyer Spring Railroad Overpass – Little Rock received notice from Metroplan
and the Arkansas Highway and Transportation Department that funding would be
available to construct a long-planned street railroad on Geyer Springs just north of
65
th
.
Estimated Total Project Cost: $10 million
Funding Sources: Transportation Improvement Project Funds $8 million;
2013 Bond Funds $2 million
2014 Estimated Expenditures: $1,000,000
Estimated Completion Date: 2016
Estimated Increase to Operating Expenditures: Not applicable.
Maintenance will be performed with current annual public works allocations
for street maintenance in the Street Fund budget.
Main Street Water Quality Grant – Little Rock has received a grant from the
Arkansas Natural Resources Commission (ANRC) and the Environmental
Protection Agency to construct low impact development improvements on Main
Street from Markham to Capitol Avenue. The project includes a partnership with
the E-Stem School for water quality education.
Estimated Total Project Cost: $2.42 million
Funding Sources: ANRC Grant $900,000 million; Designated Grant Match
$478,000; 3/8-cent Sales Tax Funds $555,000; and 2013 Bond Funds
$487,000.
2014 Estimated Expenditures: $2 million
Estimated Completion Date: 2015
Estimated Increase to Operating Expenditures: Not applicable.
Maintenance will be performed with current annual public works allocations
for street maintenance in the Street Fund budget.
136
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Public Works 3/8-Cent Sales Tax Street Resurfacing and Drainage Projects –
The new 3/8-cent sales tax will provide funding for approximately $72 million in
street resurfacing and maintenance, street drainage reconstruction, traffic signals,
traffic calming, and sidewalks over the next ten (10) years. The Board specified
projects for the 2012 improvement program and all those projects are substantially
complete. Following a series of community meetings, the Board has specified
projects for the 2013 - 2015 improvement program. Additional community
meetings will be held beginning in 2015 to determine the 2016-2018 program and
in 2018 for the 2019-2021 program.
Estimated Total Project Cost: $72,000,000
Funding Sources: 3/8-cent sales tax
2014 Estimated Expenditures: $5.6 million
Estimated Completion Date: December 2016 (2012-2015 projects)
Estimated Increase to Operating Expenditures: Not applicable.
applicable. Maintenance will be performed with current annual public works
allocations for street maintenance in the Street Fund budget.
Project Location Project Cost
26th Street Fair Park to Harrison $525,000
36th St & Schackleford Shackleford to Dartmoth w/sidewalk on Shackford 515,000
8th & Brown St Drainage improvements 500,000
Abigail St 8th to 10th 370,000
Adams St 12th St north to I-630. 1,000,000
Bradberry Dr Drainage improvements Bradberry to Sawgrass 60,000
Breckenridge Drive Drainage improvements 2600 block 95,000
Broadmoor Subdivision Repair curb and gutter at multiple locations 20,000
Butler Rd Butler Road at Allyson Circle 15,000
Clarkson St C Street to H Street 300,000
Dartmoor at Mann Rd Drainage improvements 20,000
Dorado Beach Dr Replace culvert 1600 block 120,000
Dorado Beach Dr Drainage improvements 1400 block 40,000
23rd Street Drainage Drainage Pettaway Park to 23rd St. 80,000
Echo Valley Ct Drainage improvements 9900 block 100,000
Elm Street West 26th south to West 27th. 150,000
Florida Street L Street to M Street 280,000
Gamble Rd Arthur north to mid 200 block 960,000
Gristmill Rd Drainage improvements 190,000
Hawthorne / Tyler Drainage improvements at Tyler Street 170,000
Heatherbrae/Glenn Valley Culvert crossing Glenn Valley at Stone Creek 60,000
LaMarche Drive New roadway LaMarche Dr north to Taylor Loop 900,000
Lancaster Drainage 5900 block Lancaster Rd and Lyndell Dr. 150,000
Ledgelawn Dr Replace culvert at #7 80,000
Longlea Ct Drainage improvements at #63 105,000
Street and Drainage Projects (2012-2015 Projects)
Public Works 3/8-Cent Sales Tax
137
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Project Location Project Cost
Malloy St 42nd St to Col. Glenn 1,100,000
Marlborough St Young Road to Halifax 600,000
Maywood Subdivision Drainage improvements Aberdeen to Cantrell 200,000
MLK Blvd Drainage improvements 28th to 30th. 100,000
N Gaines Connect north end of Gaines to River Trail 25,000
N Pine St Lee to Kavanaugh 375,000
Northbrook Circle Drainage improvemetns Northbrook to Brookhaven 100,000
Overlook Drive Drainage Rebsamen to Greathouse 120,000
P St Peirce to Taylor 430,000
Pleasant Valley Drainage improvements near Fulbright School 120,000
Pleasant Valley Roundabout at Pleasant Valley and Arkansas Valley 600,000
Potter St Colonel Glenn to 40th St. 800,000
River Mtn Rd Corrugated metal pipe rehabilitation 175,000
Rodney Parham Bike lanes markings Valley Club north to Cantrell 470,000
Rodney Parham at Buff Drainage improvements at Buff Lane 175,000
Russ St Cantrell to Pankey Park 250,000
South Tyler West 30th to West 32nd. 370,000
Sandy Lane / Shady Brook Drainage improvements 150,000
Schiller St Drainage improvements 23rd to Roosevelt 100,000
Shelia Lane & Meyer Rd Drainage improvemetns Shelia Lane at Meyer 220,000
Sherrill Road Rebsamen Park to N Sherrill 650,000
Meadowcliff Sidewalk Meadowcliff School on Sheraton Dr. and Edgemont 330,000
Tamela Dr Drainage improvements Valley to Ramona Dr. 45,000
Taylor Loop Drainage Improvements on Taylor at Gooch 150,000
Thompson Rd Drainage improvements 85,000
Valmar Repair drainage at 2209 Valmar. 110,000
Victoria / Woodford Install underground drainage system. 250,000
Daisy L Gatson Bates Drainage improvements 2400 block 100,000
W Street Grant to University 275,000
Ward 1 Sidewalk Miscellaneous Sidewalk 140,000
Ward 4 Sidewalk Miscellaneous Sidewalk 100,000
Ward 5 Sidewalk Miscellaneous Sidewalk 30,000
Ward 6 Sidewalk Miscellaneous Sidewalk 165,000
Ward 7 Sidewalk Miscellaneous Sidewalk 50,000
Westminister Dr Street and drainage improvements at #45 20,000
White Willow Ct Drainage improvements 120,000
Windamere Phase 2 Continuation of drainage work Windamere to Carlyle 100,000
Woodlane St Drainage improvemetns Victory to Capitol Drain 400,000
Woodson Rd Young Road to Hallifax 900,000
Yarberry Lane Chicot to Deer Meadow 895,000
$18,200,000
Estimated 2014 Expenditure $5.6 million
Public Works 3/8-Cent Sales Tax
Street and Drainage Projects (2012-2015 Projects)
138
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Public Works 2013 Capital Improvement Bond Street Resurfacing, Street and
Drainage Projects – Following a series of community meetings, the Board
approved $60 million in projects to be completed for street resurfacing, street and
drainage reconstruction projects, traffic signals, traffic calming, and sidewalks.
Estimated Total Project Cost: $60,000,000
Funding Sources: 2013 Capital Improvement Bond Issue
2014 Estimated Expenditures: $20 million
Estimated Completion Date: December 2016
Estimated Increase to Operating Expenditures: Not applicable.
Maintenance will be performed with current annual public works allocations
for street maintenance in the Street Fund budget.
Project Location Total
17th St. Woodrow St to Brown St $1,000,000
36th Street Roundabout 36th Street and Romine Rd 300,000
44th St 44th Street West of Potter 700,000
Asher Ave Oak to Woodrow 3,000,000
Barrow Road Streetscape Kanis to 36th St. 2,000,000
Cecil Drive Drainage Cecil Drive and Shephards Drive 500,000
Cedar Hill Bridge Repair Riverdale 600,000
Chicot Rd & Mabelvale Pike Mabelvale Pike south to Chicot to Shetland 2,000,000
Coleman Creek Buchanon to H St. 50,000
Dailey Drive Sidewalk Baseline south to the Health Clinic 50,000
El Dorado / Hinson Drainage Hinson Rd at Eldorado Dr 500,000
Ellis / Steven Drainage Intersection of Ellis and Steven Dr 500,000
Elm St and Maryland St 8th to Maryland to Lewis 500,000
Fair Park Traffic Calming 12th to Asher 400,000
Geyer Springs Railroad Overpass 58th St to 65th St Grant Match 500,000
Hinson / Pebble Beach Intersection Hinson Rd at Pebble Beach Dr 500,000
Kanis Road Bowman to Point West 1,850,000
Kanis Road Shackleford to Embassy Suites Dr. 1,000,000
Kingsrow Drive 200 Block of Kingsrow 510,000
Mabelvale Cutoff Shiloh to Sardis 2,800,000
McAdoo Drainage Markham to Amherst, Pinnacle to H 1,050,000
Pine Manor Drainage Ranch Valley 500,000
Pine Valley Roundabout Pine Valley at Mckinley 400,000
Pinnacle Valley Cantrell to City Limits 3,000,000
Plantation Pickett Plantation Dr at Pickett Dr 200,000
Polk Street Improvements Lee Ave. to A St. 690,000
Ranch Blvd Signal Ranch Blvd at Cantrell Rd 250,000
Rodney Parham / 430 Interchange Rodney Parham 700,000
Scenic Drive Drainage Grant St. to N. Taylor St. 500,000
Public Works 2013 Capital Improvement Bonds
Street and Drainage Projects (2014-2016)
139
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Project Location Total
Scott Hamilton I-30 to 65th St 3,800,000
Taylor Loop Road Rahling to LaMarche Dr. 1,300,000
West 10th St Abigail St to Washington St 550,000
Wright Avenue Viaduct Grant match, bridge at the railroad 500,000
Zoo Dr. Roundabout Zoo Dr at Fairpark 400,000
Asphalt Overlay Program Asphalt Overlay in all Wards 21,000,000
City-wide Projects Projects of city-wide significance 5,900,000
$60,000,000
Estimated 2014 Expenditures: $20,000,000
Public Works 2013 Capital Improvement Bonds
Street and Drainage Projects (2014-2016)
140
Return to Table of Contents
Debt Management
City of Little Rock, Arkansas 2014 Operating Budget
DEBT MANAGEMENT
The City of Little Rock is authorized to issue General Obligation Bonds payable
from ad valorem taxes to finance capital improvements. These bonds require
majority voter approval prior to issuance. The Arkansas State constitution
provides that the amount payable out of property taxes shall not exceed 20% of
the City’s assessed valuation. The City of Little Rock falls well below this
statutory requirement. As of 12/31/13, the net amount of debt outstanding was
$119,963,867. The legal debt margin allows the City flexibility to issue up to an
additional $845,829,289.
Generally, the City has experienced a stable financial condition as well as sound
debt administration. For example, the City’s net general obligation long-term
debt per capita is $619.89 well below $1,200 per capita which would be a
warning trend. This has allowed the City to enjoy favorable bond ratings on its
General Obligation Bonds. The City has received an AA bond rating from
Standard & Poor’s and an Aa3 rating from Moody’s Investor Services. An AA
rating from Standard & Poor’s indicates that the bonds are high quality with a
very strong capacity to pay principal and interest.
CITY’S LEGAL DEBT MARGIN
Amount
2013 Assessed Value
(2013 Assessment Collected in 2014)
Real Property $2,840,238,586
Personal Property 765,722,146
Utility:
Personal Property 257,211,894
Total Assessment 3,863,172,626
Debt Limit (20% of assessment) 772,634,525
Short-Term Financing Debt Limit (5% of assessment) 193,158,631
Sub-Total Debt Limit 965,793,157
G.O. & Short Term Bonds Outstanding - 12/31/13 136,887,445
Less:
Amount available for Debt Service - 12/31/13 16,923,578
Outstanding Bonds, Net of Debt Service 119,963,867
Legal Debt Margin $845,829,289
141
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
The legal debt limit is the maximum issuance of general obligation bonds. The
debt limit is determined by combining the twenty percent (20%) of the assessed
value of real estate in the Little Rock city limits for General Obligation Bonds with
five percent (5%) of the assessed value of real estate in the Little Rock city limits
for Short-Term Financing. For 2013, the legal debt limit is $965,793,157 based
on a total assessment of $3,863,172,626. Each year it changes based upon the
assessed value of real estate.
Legal Debt Legal Debt
Margin Limit
2004 556,368,641 664,883,347
2005 611,096,546 713,061,578
2006 659,726,412 761,730,525
2007 725,407,499 820,379,036
2008 800,758,307 887,078,087
2009 807,405,018 899,996,683
2010 824,122,887 902,775,323
2011 869,712,492 931,761,237
2012 876,979,992 942,877,678
2013 845,829,289 965,793,157
Debt Applicable to Debt Limit 2004 - 2013
The City of Little Rock has three areas of current debt levels, which combined,
equal the total debt level of the city. Current general obligation level as of
December 31, 2013 is $111,415,000. The current revenue bond level is
$41,140,000. The short-term debt level is $25,472,446 for an overall current
debt level of $178,027,446.
Although the City may increase the general obligation and the short-term debt
levels to $965,793,157, resources to repay the bonds would require an increase
in the value of existing and new property and/or an increase in millage. For the
City of Little Rock, the millage required to fund over $965 million in debt is
approximately 17.15 mills. Currently, the property tax millage for the retirement
of general obligation debt is 4.9 mills. The millage may be increased to provide
funds up to the legal debt limit with voter approval. The City of Little Rock issued
the $70,635,000 Limited Tax General Obligation Bonds Series in 2004, secured
with a property tax millage of 3.3 mills, to finance capital improvements within the
City of Little Rock. In April 2013, the $70,635,000 bonds were redeemed in full
and the bonds were defeased. The citizens of Little Rock approved a new annual
ad valorem tax at a lesser rate of 3.0 mills at a special election held on
September 11, 2012. As a result of the new millage, the City’s master plan is to
142
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
issue up to $105,000,000 in general obligation debt to fund $73,500,000 in street
improvements and $31,500,000 in drainage Improvements. In July 2013, the
City of Little Rock issued the first series of Limited Tax General Obligation Bonds
for streets and drainage in the amount of $58,105,000. The City does not plan to
issue a second series of bonds until the 2016 – 2017 timeframe.
To issue additional general obligation debt without a dedicated revenue stream
would negatively impact the General Fund. The City will not issue such debt
without a voter approved millage increase to fund the retirement. By law, five (5)
mills is the maximum allowed to fund General Fund operations. The City’s
current operating millage is the maximum.
PRINCIPAL PRINCIPAL BONDS PRINCIPAL INTEREST
ORIGINAL MATURITY INTEREST BALANCE BONDS PAID IN RETIRED BALANCE PAID IN
GENERAL OBLIGATION DEBT
TRUSTEE AMOUNT DATE RATE AT 12/31/12 ISSUED 2013 2013 AT 12/31/2013 2013
-
2004 Limited Tax Capital Improvement Regions Bank $70,635,000 4/1/2013 3.75% - 4.00% $3,185,000 $0 $3,185,000 $0 $0 $59,719
2008 Library Construction and Imp. Bonds Regions Bank 4,000,000 3/1/2028 3.00% - 4.75% 3,095,000 0 160,000 160,000 2,775,000 127,146
2009 Library Construction and Imp. Bonds Regions Bank 28,000,000 3/1/2028 3.00% - 5.00% 22,940,000 0 1,140,000 1,210,000 20,590,000 911,328
2012 Library Construction and Imp. Bonds Regions Bank 31,015,000 3/1/2032 2.00% - 4.00% 31,015,000 0 0 1,070,000 29,945,000 971,225
2013 Limited Tax Capital Improvement First Security Bank 58,105,000 4/1/2033 1.00% - 5.00% 0 58,105,000 0 0 58,105,000 352,479
REVENUE BONDS
2007 Capital Improvement Revenue & Refunding Bonds U.S, Bank 13,350,000 10/1/2019 4.00% - 5.00% 8,445,000 0 1,055,000 0 7,390,000 379,050
2002 Junior Lien Revenue Bonds U.S. Bank 3,630,000 10/1/2018 3.50% - 4.65% 1,655,000 0 245,000 0 1,410,000 73,048
2009A Parks & Rec Revenue Bonds Bank of the Ozarks 7,830,000 1/1/2039 2.00% - 5.50% 7,255,000 0 135,000 0 7,120,000 365,208
2009B Parks & Rec Revenue Refunding Bonds Bank of the Ozarks 12,120,000 1/1/2039 2.00% - 5.375% 11,560,000 0 215,000 0 11,345,000 581,703
2003 Capital Imp.and Refunding Projects U.S. Bank 11,855,000 7/1/2028 1.50% - 5.30% 9,490,000 0 410,000 0 9,080,000 482,165
2007 Waste Disposal Revenue Bond Citizens Bank 3,400,000 5/1/2022 5.30% - 5.87% 2,560,000 0 200,000 0 2,360,000 140,048
2010 Waste Disposal Revenue Bonds BancorpSouth 6,570,000 5/1/2016 1.90% - 3.77% 4,625,000 0 2,190,000 0 2,435,000 105,796
TEMPORARY NOTE
2008 Temporary Note Capital One Public Funding 4,991,500 9/25/2013 4.69% 1,091,863 0 1,091,863 0 0 51,220
2011 Temporary Note Pinnacle Public Finance 4,600,000 12/22/2016 1.75% 3,711,641 0 903,905 0 2,807,736 64,954
2012 Temporary Note Banc of America Public Capital Corp. 18,580,000 3/28/2017 1.38% 18,580,000 0 3,615,291 0 14,964,709 255,869
2013 Temporary Note U.S. Bank 7,700,000 7/30/2018 1.61% 0 7,700,000 0 0 7,700,000 0
Grand Total
$286,381,500 $129,208,504 $65,805,000 $14,546,059 $2,440,000 $178,027,445 $4,920,957
PRINCIPAL PRINCIPAL BONDS PRINCIPAL INTEREST
ORIGINAL MATURITY INTEREST BALANCE BONDS PAID IN RETIRED BALANCE PAID IN
GENERAL OBLIGATION DEBT
TRUSTEE AMOUNT DATE RATE AT 12/31/13 ISSUED 2014 2014 AT 12/31/2014 2014
-
2008 Library Construction and Imp. Bonds Regions Bank $4,000,000 3/1/2028 3.00% - 4.75% $2,775,000 $0 $165,000 $0 $2,610,000 $117,008
2009 Library Construction and Imp. Bonds Regions Bank 28,000,000 3/1/2028 3.00% - 5.00% 20,590,000 0 1,175,000 0 19,415,000 841,978
2012 Library Construction and Imp. Bonds Regions Bank 31,015,000 3/1/2032 2.00% - 4.00% 29,945,000 0 1,185,000 0 28,760,000 978,728
2013 Limited Tax Capital Improvement First Security Bank 58,105,000 4/1/2033 1.00% - 5.00% 58,105,000 0 5,230,000 0 52,875,000 1,643,486
REVENUE BONDS
2007 Infrastruture Refunding U.S, Bank 13,350,000 10/1/2019 4.00% - 5.00% 7,390,000 0 1,105,000 0 6,285,000 334,213
2002 Junior Lien Revenue Bonds U.S. Bank 3,630,000 10/1/2018 3.50% - 4.65% 1,410,000 0 255,000 0 1,155,000 62,880
2009A Parks & Rec Revenue Bonds Bank of the Ozarks 7,830,000 1/1/2039 2.00% - 5.50% 7,120,000 0 140,000 0 6,980,000 361,063
2009B Parks & Rec Revenue Refunding Bonds Bank of the Ozarks 12,120,000 1/1/2039 2.00% - 5.375% 11,345,000 0 220,000 0 11,125,000 575,148
2003 Capital Imp.and Refunding Projects U.S. Bank 11,855,000 7/1/2028 1.50% - 5.30% 9,080,000 0 425,000 0 8,655,000 464,535
2007 Waste Disposal Revenue Bond Citizens Bank 3,400,000 5/1/2022 5.30% - 5.87% 2,360,000 0 210,000 0 2,150,000 128,770
2010 Waste Disposal Revenue Bonds BancorpSouth 6,570,000 5/1/2016 1.90% - 3.77% 2,435,000 0 785,000 0 1,650,000 70,338
TEMPORARY NOTE
2011 Temporary Note Pinnacle Public Finance 4,600,000 12/22/2016 1.75% 2,807,737 0 919,723 0 1,888,014 49,135
2012 Temporary Note Banc of America Public Capital Corp. 18,580,000 3/28/2017 1.38% 14,964,709 0 3,664,647 0 11,300,062 206,513
2013 Temporary Note U.S. Bank 7,700,000 7/30/2018 1.61% 7,700,000 0 1,491,204 0 6,208,796 123,970
Grand Total
$210,755,000 $178,027,446 $0 $16,970,574 $0 $161,056,872 $5,957,763
SUMMARY OF BOND INDEBTEDNESS
For the month ended December 31, 2014
SUMMARY OF BOND INDEBTEDNESS
For the month ended December 31, 2013
143
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
FUTURE DEBT SERVICE
YEAR PRINCIPAL INTEREST TOTAL
2014 $16,970,573.71 $5,957,762.69 $22,928,336.40
2015 $16,226,249.37 $5,580,247.29 $21,806,496.66
2016 $15,948,072.53 $5,148,052.87 $21,096,125.40
2017 $12,742,968.25 $4,727,832.85 $17,470,801.10
2018 $9,269,581.66 $4,332,956.70 $13,602,538.36
2019 $7,675,000.00 $3,967,163.80 $11,642,163.80
2020 $6,605,000.00 $3,615,323.79 $10,220,323.79
2021 $6,910,000.00 $3,308,454.41 $10,218,454.41
2022 $7,235,000.00 $2,984,270.03 $10,219,270.03
2023 $7,240,000.00 $2,650,377.53 $9,890,377.53
YEAR
PRINCIPAL INTEREST TOTAL
2014 $13,830,573.71 $3,960,817.65 $17,791,391.36
2015 $12,966,249.37 $3,708,702.75 $16,674,952.12
2016 $12,548,072.53 $3,412,628.83 $15,960,701.36
2017 $10,062,968.25 $3,130,181.56 $13,193,149.81
2018 $6,454,581.66 $2,864,586.66 $9,319,168.32
2019 $5,085,000.00 $2,625,941.27 $7,710,941.27
2020 $5,310,000.00 $2,396,042.52 $7,706,042.52
2021 $5,550,000.00 $2,155,530.02 $7,705,530.02
2022 $5,805,000.00 $1,901,760.02 $7,706,760.02
2023 $6,075,000.00 $1,633,028.77 $7,708,028.77
YEAR
PRINCIPAL INTEREST TOTAL
2014 $3,140,000.00 $1,996,945.04 $5,136,945.04
2015 $3,260,000.00 $1,871,544.54 $5,131,544.54
2016 $3,400,000.00 $1,735,424.04 $5,135,424.04
2017 $2,680,000.00 $1,597,651.29 $4,277,651.29
2018 $2,815,000.00 $1,468,370.04 $4,283,370.04
2019 $2,590,000.00 $1,341,222.53 $3,931,222.53
2020 $1,295,000.00 $1,219,281.27 $2,514,281.27
2021 $1,360,000.00 $1,152,924.39 $2,512,924.39
2022 $1,430,000.00 $1,082,510.01 $2,512,510.01
2023 $1,165,000.00 $1,017,348.76 $2,182,348.76
GENERAL OBLIGATION FUTURE DEBT SERVICE
REVENUE BOND FUTURE DEBT SERVICE
OVERALL FUTURE DEBT SERVICE
144
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Little Rock's
Debt Available for Percentage Share of
Governmental Unit Retirement Applicable Overlapping Debt
City of Little Rock, Arkansas $136,887,445 100% $136,887,445
Little Rock Public School District 196,693,140 100% 196,693,140
Total direct and overlapping debt $333,580,585 $333,580,585
Cit
y
of Little Rock, Arkansas
Direct and Overla
pp
in
g
Governmental Activities Debt
A
s of December 31, 2013
145
Return to Table of Contents
This page left blank intentionally.
146
Return to Table of Contents
Departmental
Information
City of Little Rock, Arkansas
Mayor
Mayor
Mission Statement
To make policies and provide representation for the citizens
of Little Rock; provide executive management and
administration of City affairs; provide legal advice and
representation for the City; serve as official recorder and
custodian of public documents; and to conduct municipal
judicial proceedings for criminal and traffic offences.
Citizens
Mayor
147
Return to Table of Contents
City of Little Rock, Arkansas
Mayor
2013 Department Priorities Status
Work with various economic development organizations
to attract and retain jobs for the community. Ongoing
Implement innovative approaches to combating crime,
adding new police officers to the force and reducing the
City's crime rate.
Ongoing
Work with community to make improvements to Main
street using new approaches to sustainable
development while implementing strategies to create the
"Creative Corridor". Ongoing
Ensure the new local sales tax is spent responsibly and
according to the plan laid out to the voters before the
election.
Ongoing
Working with the Greater Little Rock Community and
service providers, the City of Little Rock opened the
Homeless Day Resource Center and expanded the
offerings at the Center.
Completed
The City of Little Rock implemented the Neighborhood
Stabilization Program to strengthen neighborhoods,
rebuild residential neighborhoods, and allow for new
home ownership.
Completed
Collaborated with the Little Rock School District to
develop a joint operating agreement to expand
programming opportunities for the City's youth. Completed
Continue with the City's "Love Your School" initiative
focused on the childhood obesity epidemic by promoting
healthy living, eating, and exercising while reducing the
City's food deserts. Ongoing
Continue to fund and complete the Arkansas River Trail. Ongoing
Support the Mayor's Commission on Sustainability to
promote sustainable initiatives and to host an annual
summit on sustainability. Ongoing
Tourism: Continue to envision and create new
attractions, events, and festivals for the City. Ongoing
148
Return to Table of Contents
City of Little Rock, Arkansas
Mayor
2014 Department Goals
Open both the 12
th
Street Station and the West Little Rock (WLR) Police
Substation on Hi
g
hwa
y
10 for the LRPD.
Implement an apartment safety/crime free diagram.
Continue the Neighborhood Stabilization Program for the redevelopment of
neighborhoods in the Midtown Neighborhoods south of I-630.
Finalize the 12
th
Street Corridor plan through the Metroplan Jump Start
Grant; work with partners to identify development opportunities along the
corridor.
Continue to develop, with private sector investment, the Creative Corridor.
Concentrate on art, culture, science and technology.
Complete the “low impact development project along Main Street; work with
the development community to further invest along the Main Street Corridor.
Develop and implement an ordinance to provide recycling at the City’s
various multi-family housing complexes.
Improve programming and operations of the Homeless Day Resource
Center.
Begin the analysis on the revitalization of residential areas east of I-30.
Begin implementation of a master plan for Western Hills, Hindman Park, and
First Tee recreational areas.
The departmental goals and objectives link with the
Overall City Goals and Objectives.
149
Return to Table of Contents
This page left blank intentionally.
150
Return to Table of Contents
City of Little Rock, Arkansas
General Government and Administration
General Administrative
Mission Statement
To deliver the highest level of quality information on policies,
services, and activities of Little Rock City Government to the citizen
and facilitate the delivery of emergency response information to the
general public and make available, through electronic media,
information about city and community events.
Citizens
Mayor & Board
of Directors
City Attorney City Manager District Court Judges
Assistant City Manager
City Clerk
Racial & Cultural
Diversity
Small & Minority Women
Owned Business
Development
151
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
General Administrative
Expenditure Budget
2012 2013 2014
Description
Actual
Expenditures
Adopted
Budget
Adopted
Budget
Salaries and Employee Benefits $4,982,347 $6,080,081 $6,274,458
Supplies and Materials 79,112 61,294 60,665
Contractual 12,524,282 12,221,744 12,620,896
Repairs and Maintenance 16,063 12,355 16,928
Capital 1,641 00
Debt Service 4,411,421 2,396,042 1,323,343
$22,014,866 $20,771,516 $20,296,290
Staffing 26 26 31
$0
$3,250,000
$6,500,000
$9,750,000
$13,000,000
2012
2013
2014
Debt Serv ice CapitalRepairs and
Maintenance
ContractualSupplies and
Mater ials
Salaries and
Employee
Benefits
Total Allocations By Fiscal Year And Account Category
General Government includes Mayor and City Manager, City Clerk, Racial and Cultural
Diversity, Emergency Management, Small and Women Owned Business Development, and
LRTV. Approximately $194,000 of the personnel increase is attributed to salary, health
care, and pension contribution increases for non-uniform employees. The personnel
increase also includes the addition of one (1) LRTV position, three (3) Homeless Center
positions and one (1) Cities of Service position. The decrease in debt service is associated
with the retirement of a short-term note.
FY 14 % Change
Proposed from
Resources for Budget Budget Prior Year
100 General Fund $20,296,290 -2.29%
152
Return to Table of Contents
City of Little Rock, Arkansas
City Manager
2013 Department Priorities Status
Implement the priority needs infrastructure projects
funded by the 3/8 cent capital sales tax; provide regular
reports to the Little Rock Citizens Evaluation of New Tax
(LR CENT) Committee. Ongoing
Implement the operational elements of the 5/8 cent
operating sales tax; including the filling of identified
positions, purchase of equipment, implementation of
programs, and provide regular reports to the LR CENT
Committee.
Ongoing
Conduct additional Police and Fire Fighter recruit
classes to fill departmental vacancies as identified
through the new sales tax.
Ongoing
Opened the Homeless Day resource Center. Recruited
service partners to help provide service to the homeless
and moved independent service providers to the Center. Completed
Opened the Centre at University Park (formerly the
Adult Leisure Center) and developed new programming
to meet the needs of the participants. Completed
Installed the Information Technology Disaster Recovery
system focused on implementing an active operating
system.
Completed
Make significant progress on the construction of the
12th Street Police Station and begin planning for staffing
and operational elements of the station.
Ongoing
Implemented a new pension plan for non-union
employees as identified by the consultants. Held
information sessions to educate employees on the plan.
Completed
Acquire the land and begin the design phase of the new
Southwest Little Rock Fire Station.
Ongoing
Complete design work on the West Central Community
Center and prepare the bidding documents for the
construction.
Ongoing
153
Return to Table of Contents
City of Little Rock, Arkansas
City Manager
2014 Department Goals
Complete construction of the 12
th
Street Police Substation facility and develop
schedule for occupancy.
Continue to improve and expand Police Officer and Fire Fighter recruiting
efforts and conduct at least one (1) Recruit School for Police and Fire in 2014.
Acquire a suitable facility for additional Northwest Patrol facility along Cantrell
Road corridor and begin rehabilitation of the structure.
Complete construction of Cell 5 of the Class 1 landfill and continue construction
of Cell 3 of the Class 4 landfill.
Develop web applications for staff to better utilize Geographical Information
System (GIS) and move the current City of Little Rock web page zoning and
land use applications from Pulaski Area Geographical Information System
(PAGIS) maintenance and storage to the Department.
Continue the development of a Re-Entry Employment Readiness Training
Program throughout all City Departments and fully implement the pre-release
process and programming for returning Little Rock residents.
In collaboration with the Little Rock School District, implement a Skills Training
Pilot Project for eighteen (18) twenty-four (24) year old youth who are out of
school.
Open the City’s new Compressed Natural Gas Fueling Station at 501 Ferry
Street. Work to add electric charging stations by the end of 2014.
Initiate an eighteen (18) month plan to convert 20% of the City’s current late
model pick-up trucks to Compressed Natural Gas (CNG) and convert small
engine lawn equipment to propane power; continue to acquire alternative
fueled vehicles, including factory ready electric and CNG vehicles.
Initiate Quiet Title Actions on sixteen (16) Land Bank properties to spur
redevelopment in targeted neighborhoods; utilize Federal funds to outsource
and provide a more efficient turn-around for obtaining those actions.
Complete the first phase construction of Natural Steps Athletic Complex to
include four (4) athletic fields, an entrance road and parking.
Begin construction on a new Arkansas Farm exhibit set for a grand opening in
2015.
154
Return to Table of Contents
City of Little Rock, Arkansas
City Manager
2014 Department Goals (Continued)
Continue making improvements to the Animal Village Dog Park to include
addition of water fountains for individuals and the installation of a water play
area for dogs.
Continue providing support and making regular reports to the LR Cent
Committee and the Board of Directors regarding the status of the new one (1)
cent local sales tax revenues and the progress toward completion of capital
projects authorized under the 3/8 cent portion of the tax.
Increase the City’s utilization of social media to market City programs and
services. Inform and educate the public regarding activities and issues within
the community to broaden the constituency base.
Develop a Request for Proposal (RFP) to seek a firm to conduct a Disparity
Study for the City of Little Rock; contingent upon funding.
155
Return to Table of Contents
City of Little Rock, Arkansas
City Manager
Department: City Manager
Funding Source: General Fund
Budget: $20,296,290
Department Description:
To ensure the effective implementation, administration and evaluation of City programs established
through the policy directives of the Board of Directors; to provide administrative support to the City
Manager and Board of Directors and to serve as a resource for citizens and neighborhood groups.
2012 2013 2014
Actual
Budget Budget
Objective: Provide responses to City Board of Director requests in a timely manner.
Demand: Number of City Board of Director
requests. 225 250 250
Workload: Number of City Board of Director
requests completed. 220 225 225
Efficiency: Number of City Board of Director
requests completed in a timely manner. 200 225 225
Effect/Outcome: Percentage of City Board of
Director requests completed in a timely manner. 91% 100% 100%
Objective: Provide responses to citizen requests within a timely manner.
Demand: Number of citizens requests for
information. 200 200 200
Workload: Number of citizen requests for
information completed. 190 200 200
Efficiency: Number of citizen requests for
information completed in a timely manner. 185 180 180
Effect/Outcome: Percentage of total citizen
requests completed a timely manner. 97% 90% 90%
The departmental goals and objectives link with the
Board of Directors Statement of Management Policy for
Basic City Services.
156
Return to Table of Contents
City of Little Rock, Arkansas
Board of Directors
Board of Directors
Mission Statement
To make policies and provide representation for the citizens
of Little Rock; provide executive management and
administration of City affairs; provide legal advice and
representation for the city; serve as official recorder and
custodian of public documents; and to conduct municipal
judicial proceedings for criminal and traffic offences.
Citizens
Board of Directors
157
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Board of Directors
Expenditure Budget
2012 2013 2014
Description
Actual
Expenditures
Adopted
Budget
Adopted
Budget
Salaries and Employee Benefits $162,239 $176,630 $280,348
Supplies and Materials 24,598 2,990 2,990
Contractual 30,475 55,097 55,097
Repairs and Maintenance 0 57 92
Total $217,312 $234,774 $338,527
Staffing 111
$0
$75,000
$150,000
$225,000
$300,000
2012
2013
2014
Repairs and
Maintenance
ContractualSupplies and
Materials
Personnel
Total Allocations By Fiscal Year And Account Category
FY 14 % Change
Proposed from
Resources for Budget Budget Prior Year
100 General Fund $338,527 44.19%
Board staffing reflects the one (1) full time assistant dedicated to the Board of
Directors. The Board consists of ten (10) part-time elected officials representing the
City’s seven (7) Wards with three (3) at large positions. The increase in expenditures
is associated with an increase in the annual salary of each Board Member from
$12,000 to $18,000. In addition, the increase reflects an annual $3,000 expenditure
stipend for each Board Member.
158
Return to Table of Contents
City of Little Rock, Arkansas
Board of Directors
2014 Department Goals
Participate in professional development opportunities offered by the U.S.
Conference of Mayors, the National League of Cities, the Arkansas Municipal
League and other professional organizations.
Develop policies and programs to improve the City of Little Rock; focus on the
priority areas of public safety, economic development, infrastructure, basic
city services and quality of life.
Meet with neighborhoods and community groups to discuss and resolve
issues of concern.
Ensure the successful implementation of the City’s 3/8 cent capital projects
and the 5/8 cent operating sales tax funds.
159
Return to Table of Contents
City of Little Rock, Arkansas
Board of Directors
Department: Board of Directors
Funding Source: General Fund
Budget: $338,527
Department Description:
To provide executive management and administration of City affairs; provide legal advice and
representation for the city; serve as official recorder and custodian of public documents.
The departmental goals and objectives link with the
Overall City Goals and Objectives.
160
Return to Table of Contents
City of Little Rock, Arkansas
Community Programs
Community Programs
Mission Statement
To effectively administer and maximize the Future Little Rock PIT/CYF
funds authorized under Ordinance 16,496 (and other funds) in order to
provide the community with quality programs that utilize citizen
involvement, proven practices, and standardized process with the goal of
improving positive outcomes and the quality of life for the children, youth,
and families of Little Rock.
Assistant City
Manager
Director of
Community Programs
Administration Programs
Children, Youth &
Family
Anti - Tobacco
PIT
161
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Community Programs
Expenditure Budget
2012 2013 2014
Description
Actual
Expenditures
Adopted
Budget
Adopted
Budget
Salaries and Employee Benefits $344,235 $350,461 $380,059
Supplies and Materials 0 1,874 1,874
Contractual 10,501 6,000 6,000
Repairs and Maintenance 0 93 148
Total $354,736 $358,428 $388,081
Staffing 81010
$0
$100,000
$200,000
$300,000
$400,000
2012
2013
2014
Repairs and
Maintenance
ContractualSupplies and
Materials
Personnel
Total Allocations By Fiscal Year And Account Category
The majority of changes to the Community Programs budget is included in
General Fund Transfers Out which reflects the $5.5 million contribution to
Children Youth and Family prevention, intervention and treatment, and re-
entry programs.
FY 14 % Change
Proposed from
Resources for Budget Budget Prior Year
100 General Fund $388,081 8.27%
162
Return to Table of Contents
City of Little Rock, Arkansas
Community Programs
2013 Department Priorities Status
Implemented all program related contracts within first
quarter of the fiscal year.
Completed
Initiated hiring process to satisfy staffing needs. Completed
Worked with Finance and City Attorney to amend the
Tobacco ordinance. Completed
Provided updated monitoring guides for programs. Completed
Provided support for Children, Youth, & Families
Commission. Completed
163
Return to Table of Contents
City of Little Rock, Arkansas
Community Programs
2014 Department Goals
Continue development of the Reentry Employment Readiness Training
Program throughout the City of Little Rock departments; fully implementing
the pre-release process and programming for returning Little Rock
residents.
Develop specifications for an evidence based mentoring component for the
Reentry program.
Implement software to monitor program performance and participation in all
funded programs.
Revise the contracting process so that all contracts are fully executed within
six weeks following board action.
Work with a community youth council to address Tobacco ordinance
revisions.
Implement a skills training pilot project in collaboration with the Little Rock
School District for 18-24 year old youth who are out of school.
164
Return to Table of Contents
City of Little Rock, Arkansas
Community Programs
Department: Community Programs
Funding Source: General Fund
Budget: $388,081
Department Description:
To ensure the effective implementation, administration and evaluation of City social services and
human services programs assigned to the department and to serve as a resource for citizens,
resident groups, neighborhood associations and other community based organizations providing
these services.
2012 2013 2014
Actual
Budget Budget
Objective: To recruit youth, provide orientation, and approve youth to hire for summer
employment.
Demand: Youth available for recruitment and
orientation. 750 750 750
Workload: Youth recruited and processed through
orientation. 483 500 550
Efficiency: Youth processed and available for
employment in June. 483 500 500
Effect/Outcome: Percentage of youth processed
and available for work in June.
64% 66% 73%
Objective: To audit, approve, and process all reimbursement requests for payment within 14
days.
Demand: Requests available for process and
reimbursement. 530 570 570
Workload: Requests processed for
reimbursement. 530 570 570
Efficiency: Requests processed per month. 44 47 47
Effect/Outcome: Percentage of total requests
processed. 100% 100% 100%
The departmental goals and objectives link with the
Board of Directors Statement of Management Policy for a
Safe City and Quality of Life.
165
Return to Table of Contents
This page left blank intentionally.
166
Return to Table of Contents
City of Little Rock, Arkansas
City Attorney
City Attorney
Mission Statement
To provide legal assistance and representation for the City of
Little Rock and its Boards and Commissions.
Mayor and
Board of
Directors
City Attorney
Legal
Litigation Transaction
City Manager
Administration
Litigation
Transaction
167
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
City Attorney
Expenditure Budget
2012 2013 2014
Description
Actual
Expenditures
Adopted
Budget
Adopted
Budget
Salaries and Employee Benefits $1,352,995 $1,526,934 $1,600,553
Supplies and Materials 76,718 77,202 77,202
Contractual 68,206 90,953 90,953
Repairs and Maintenance 667 1,066
Capital 0 11,000
Total $1,497,920 $1,706,756 $1,769,774
Staffing 18 18 18
$0
$450,000
$900,000
$1,350,000
$1,800,000
2012
2013
2014
Capital
Outlay
Repairs and
Maintenance
ContractualSupplies and
Materials
Personnel
Total Allocations By Fiscal Year And Account Category
Approximately $73,600 of the personnel increase is attributed to salary,
health care, and pension contribution increases for non-uniform employees.
The decrease in Capital Outlay was a one-time allocation for a City/County
Attorney System in 2013.
FY 14 % Change
Proposed from
Resources for Budget Budget Prior Year
100 General Fund $1,769,774 3.69%
168
Return to Table of Contents
City of Little Rock, Arkansas
City Attorney
2013 Department Priorities Status
Continue transparent communication methods through
reports, alerts and various updates.
Ongoing
Continue providing legal advice on the Criminal Abatement
Program. Ongoing
Continue support staff cross-training and professional
development. Ongoing
Provide legal representation for the Land Bank. Ongoing
Maintain awareness of recent changes in federal law and
regulations. Ongoing
Continue to teach deadly force, civil liability and search
and seizure to Little Rock Police Department. Ongoing
Continue to prosecute litigation cases: traffic, truancy and
code violations. Ongoing
Continue to provide excellence to all those we serve. Ongoing
169
Return to Table of Contents
City of Little Rock, Arkansas
City Attorney
2014 Department Goals
Continue timely updates to Board and City management through reports,
alerts and memoranda.
Address legal issues for the Criminal Abatement Program.
Continue support staff cross-training and professional development.
Maintain awareness of recent changes in state and federal law.
Continue to teach deadly force, civil liability and search and seizure to Little
Rock Police Department.
Provide instruction for other programs as requested by City departments.
Continue to prosecute litigations cases; traffic, truancy, code violations and
represent City Board and Commissions.
Continue as need the drafting of contracts, ordinances and resolutions.
Encourage attorneys to participate in professional development organizations
such as the Arkansas City Attorneys Association, Arkansas Bar Association
and International Municipal Lawyers Association.
170
Return to Table of Contents
City of Little Rock, Arkansas
City Attorney
Department: City Attorney
Funding Source: General Fund
Budget: $1,769,774
Department Description:
To provide adequate administrative controls to ensure the delivery of effective legal review of all City
programs established by the Board of Directors and the administration of the City; to ensure that
effective legal representation is provided for all lawsuits brought by or against the City; and to
ensure that legal counsel is provided for all City boards, commissions, and departments.
2012 2013 2014
Actual
Budget Budget
Objective: To litigate cases.
Demand: Cases to be litigated. 50 67 82
Workload: Cases litigated. 50 67 82
Efficiency: Cases litigated per year. 50 67 82
Effect/Outcome: Percentage of litigated cases
closed per year.
n/a n/a n/a
The departmental goals and objectives link with the
Board of Directors Statement of Management Policy for a Safe City.
171
Return to Table of Contents
This page left blank intentionally.
172
Return to Table of Contents
City of Little Rock, Arkansas
District Court First Division
District Court
First Division
Mission Statement
To provide the public with impartial and timely adjudication of
criminal offenses; to divert offenders from criminal activity
and increase public accountability through probation, drug
testing, victim restitution and community service programs.
Citizens
District Judge
Administration
Domestic Violence Criminal Court Probation
City Manager
173
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
District Court First Division
Approximately $11,056 of the personnel increase is attributed to salary,
health care, and pension contribution increases for non-uniform employees.
$350,000
$700,000
$1,050,000
$1,400,000
2012
2013
2014
Repairs and
Maintenance
ContractualSupplies and
Materials
Personnel
Total Allocations By Fiscal Year And Account Category
Expenditure Budget
2012 2013 2014
Description
Actual
Expenditures
Adopted
Budget
Adopted
Budget
Salaries and Employee Benefits $1,089,206 $1,299,277 $1,310,333
Supplies and Materials 35,779 38,300 42,100
Contractual 23,458 42,150 38,350
Repairs and Maintenance 915 1,714 1,722
Total $1,149,358 $1,381,441 $1,392,505
Staffing 21 21 21
FY 14 % Change
Proposed from
Resources for Budget Budget Prior Year
100 General Fund $1,392,505 0.80%
174
Return to Table of Contents
City of Little Rock, Arkansas
District Court First Division
2013 Department Priorities Status
Acquire a new court building for all three (3) District
Courts, providing adequate space and a healthier
environment for employees and better security for the
Judge, public, staff and attorneys. Ongoing
Administer and provide justice to all in an equitable,
professional, manner. Ongoing
Continue to direct overall operations of the Criminal Court
within the guidelines of the Arkansas State Statutes and
the City of Little Rock ordinances and policies. Ongoing
Provide better management and direction to staff insuring
accountability, accessibility and courteous customer
service to citizens. Ongoing
175
Return to Table of Contents
City of Little Rock, Arkansas
District Court First Division
2014 Department Goals
Provide better administrative support to criminal court proceedings, respond to
public inquiries, maintain legal documents, court records and calendars
efficiently and in compliance with state statutes.
Provide fair and impartial adjudications for all criminal cases heard.
Continue community outreach to middle schools with educational information
about the criminal justice system and to reach out to the public in an effort to
resolve more outstanding cases with fines to be collected by scheduling special
sessions geared to those specific cases.
First District Court will provide court informed sentencing recommendations,
monitoring conditions and compliance with probationers. Additionally First
District Court will coordinate and evaluate community service programs, track
probation fees, and court fines while staying informed on all changing
legislation regarding fees and new statute requirements regarding the sealing
of records.
Continue to direct the overall operation of Criminal Court within the guidelines
of Arkansas State Statutes and the City of Little Rock ordinances and policies;
providing management direction to staff and ensuring accountability and
accessibility to citizens, while providing courteous customer service.
Continue to make this a better department that promotes teamwork and a
happier work environment.
176
Return to Table of Contents
City of Little Rock, Arkansas
District Court First Division
Department: District Court Criminal
Funding Source: General Fund
Budget: $1,392,505
Department Description:
To direct overall operations of Criminal proceedings ensuring legal compliance, efficiency, and
public accountability.
2012 2013 2014
Actual
Budget Budget
Objective: To process Criminal Bond information on a daily basis.
Demand: Bonds to be processed. 100 100 100
Workload: Bonds actually processed. 100 100 100
Efficiency: Bonds processed per court session. 100 100 100
Effect/Outcome: Percentage of Bonds processed
daily.
100% 100% 100%
The departmental goals and objectives link with the
Board of Directors Statement of Management Policy for a Safe City.
177
Return to Table of Contents
This page left blank intentionally.
178
Return to Table of Contents
City of Little Rock, Arkansas
District Court Second Division
District Court
Second Division
Mission Statement
We seek to administer justice and equity.
Citizens
District Judge
Administration
Probation
&
Support Staff
Court Clerks
&
Support Staff
City Manager
179
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
District Court Second Division
Expenditure Budget
2012 2013 2014
Description
Actual
Expenditures
Adopted
Budget
Adopted
Budget
Salaries and Employee Benefits $958,675 $1,029,365 $1,055,621
Supplies and Materials 12,877 22,200 22,200
Contractual 155,480 168,664 167,369
Repairs and Maintenance 644 2,079 2,096
Total $1,127,676 $1,222,308 $1,247,286
Staffing 17 17 17
FY 14 % Change
Proposed from
Resources for Budget Budget Prior Yea
r
100 General Fund $1,247,286 2.04%
$0
$300,000
$600,000
$900,000
$1,200,000
2012
2013
2014
Repairs and
Maintenance
ContractualSupplies and
Materials
Personnel
Total Allocations By Fiscal Year And Account Category
Approximately $26,000 of the personnel increase is attributed to salary,
health care, and pension contribution increases for non-uniform employees.
180
Return to Table of Contents
City of Little Rock, Arkansas
District Court Second Division
2013 Department Priorities Status
Second District Court processed 31,029 traffic violations. Completed
Second District Court disposed 34,455 traffic violations. Completed
Second District Court processed 325 "Driving While
Intoxicated" (DWI) violations. Completed
181
Return to Table of Contents
City of Little Rock, Arkansas
District Court Second Division
2014 Department Goals
Second District Court will continue to find innovative ways to improve overall
operations and provide the best customer service possible.
Implement a new case management and e-filing system offered through the
Arkansas Administrative Office of the Courts.
Second District Court will provide the best customer service possible.
182
Return to Table of Contents
City of Little Rock, Arkansas
District Court Second Division
Department: District Court Traffic
Funding Source: General Fund
Budget: $1,247,286
Department Description:
To direct the overall operation of the traffic court within established policies and laws; to provide
management direction to staff; to insure accountability and accessibility to the public; and to make
sure that the best customer service possible is provided. Management also seeks to provide the
necessary needs to staff members enabling them to perform their jobs to the best of their ability and
to provide the opportunity to obtain any additional training needed or requested.
2012 2013 2014
Actual
Budget Budget
Objective: To enter violations into the public safety system the same day received.
Demand: Violations to be entered. 29,983 31,019 31,200
Workload: Violations entered and processed. 29,983 31,019 31,200
Efficiency: Violations entered and processed per
month. 2,498 2,584 2,600
Effect/Outcome: Percentage of violations
processed same day received.
99% 99% 99%
Objective: To update dispositions into the public safety system within 24 hours.
Demand: Violations to be disposed. 33,740 34,455 34,500
Workload: Violations disposed. 33,740 34,455 34,500
Efficiency: Violations disposed of per month. 2,811 2,871 2,875
Effect/Outcome: Percentage of dispositions
processed within 24 hours. 99% 99% 99%
The departmental goals and objectives link with the
Board of Directors Statement of Management Policy for a Safe City.
183
Return to Table of Contents
This page left blank intentionally.
184
Return to Table of Contents
City of Little Rock, Arkansas
District Court Third Division
District Court
Third Division
Mission Statement
To provide impartial and timely adjudication and impose
sanctions for code violations to insure that neighborhood
conditions are improved to comply with accepted health and
safety standards. To provide the public with timely and
impartial adjudication of civil and small claim matters.
Citizens
District Judge
Administration
Environmental Court Civil/Small Claims
Court
City Manager
185
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
District Court Third Division
Expenditure Budget
2012 2013 2014
Description
Actual
Expenditures
Adopted
Budget
Adopted
Budget
Salaries and Employee Benefits $524,605 $534,233 $595,856
Supplies and Materials 10,836 11,813 11,813
Contractual 15,520 17,016 17,016
Repairs and Maintenance 0 2,500 2,500
Total $550,961 $565,562 $627,185
Staffing 778
$0
$175,000
$350,000
$525,000
$700,000
2012
2013
2014
Repairs and
Maintenance
ContractualSupplies and
Materials
Personnel
Total Allocations By Fiscal Year And Account Category
Approximately $61,500 of the personnel increase is attributed to salary,
health care, pension contribution increases for non-uniform employees and
the addition of a Deputy Court Clerk.
FY 14 % Change
Proposed from
Resources for Budget Budget Prior Year
100 General Fund $627,185 10.90%
186
Return to Table of Contents
City of Little Rock, Arkansas
District Court Third Division
2013 Department Priorities Status
Third District Court continues to upgrade information
technology systems and programs. Ongoing
Provide training and certification for Court Clerks,
Probation officers and the Judge. Ongoing
Continue to find ways to improve neighborhood conditions
to comply with the city code standards. Ongoing
Continue to find substantive programming for youth who
are under our jurisdiction for day and night time curfew
violations. Ongoing
Continue to look for ways to provide a safe environment
for the public, staff and judge during all court sessions. Ongoing
Third District Court seeks to provide substantive training to
all court staff. Ongoing
187
Return to Table of Contents
City of Little Rock, Arkansas
District Court Third Division
2014 Department Goals
Implement prevention, intervention and treatment programs for juveniles.
Continue to pursue getting truancy petitions filed in our court.
Continue to provide training and certification for office staff.
Continue to plan for implementation of Administrative Office of the Courts'
(AOC) computer program that will link all participating district courts.
Provide and administer justice and equity in a professional manner in the
courtroom and work place.
Convert court forms and documents to Spanish.
Update the City's website to accommodate civil/small claims and office
forms.
188
Return to Table of Contents
City of Little Rock, Arkansas
District Court Third Division
Department: District Court Environmental
Funding Source: General Fund
Budget: $627,185
Department Description:
To direct the overall operation of the Court to ensure legal compliance, provide
management direction, public accountability, impartial and timely adjudication and the
imposition of sanctions for code violations ensuring that neighborhood conditions are
improved to comply with accepted health and safety standards.
2012 2013 2014
Actual
Budget Budget
Objective: To process 99% of life-threatening violations within seven (7) days of the date
citation is written.
Demand: Citations to be processed.
80 85 90
Workload: Citations processed, recorded, and
entered into computer. 80 85 90
Efficiency: Citations processed per court session. 75 80 85
Effect/Outcome: Percentage of Citations
processed within thirty (30) days.
100% 100% 100%
Objective: Issue Warrants within twenty-four (24) hours of failure to appear in court.
Demand: Warrants to be processed. 60 65 65
Workload: Warrants issued, recorded and
entered into computer. 60 65 65
Efficiency: Warrants issued per court session. 610 12
Effect/Outcome: Percentage of Warrants
processed. 100% 100% 100%
The departmental goals and objectives link with the
Board of Directors Statement of Management Policy for a Safe City.
189
Return to Table of Contents
This page left blank intentionally.
190
Return to Table of Contents
City of Little Rock, Arkansas
Finance
Finance
Mission Statement
To manage the financial affairs of the City in accordance with
all legal requirements in the highest standards of ethical and
professional conduct; and to advise the City Manager and
other City departments on any financial issues.
City Manager
Director of
Finance
Administration
Budget and
Research
Controller
Accounting &
Reporting
Accounts
Payable/
Special Projects
Payroll
Grants
Management
Internal Audit Purchasing
Printshop
Treasury &
Revenue
Management
Parking
Garages
191
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Finance
Expenditure Budget
2012 2013 2014
Description
Actual
Expenditures
Adopted
Budget
Adopted
Budget
Salaries and Employee Benefits $2,288,007 $2,476,958 $2,607,924
Supplies and Materials 145,290 157,063 169,713
Contractual 318,400 254,877 225,677
Repairs and Maintenance 14,997 117,940 133,678
Capital 5,425 0 0
Total $2,772,119 $3,006,838 $3,136,992
Staffing 40 41 41
$0
$700,000
$1,400,000
$2,100,000
$2,800,000
2012
2013
2014
Repairs and
Maintenance
ContractualSupplies and
Materials
Personnel
Total Allocations By Fiscal Year And Account Category
Approximately $32,000 of the personnel increase is attributed to a six month
overlap in the Purchasing Manager position. The Purchasing Manager will
retire in June. A replacement has been hired to begin in January to work
alongside the Purchasing Manager to gain experience in this critical position.
In addition, approximately $98,000 of the increase is associated with salary,
health care, and pension contribution increases for non-uniform employees.
FY 14 % Change
Proposed from
Resources for Budget Budget Prior Year
100 General Fund $3,136,992 4.33%
192
Return to Table of Contents
City of Little Rock, Arkansas
Finance
2013 Department Priorities Status
Obtained Government Finance Officers Association
(GFOA) Certificate of Recognition for 2013 Budget
Preparation.
Completed
Obtained GFOA Certificate of Achievement for Financial
Reporting for FY12 Comprehensive Annual Financial
Report (CAFR). Completed
Provided support and quarterly reporting to the Little
Rock Citizens Evaluation of New Tax (LRCent)
Committee and the Board of Directors on the status of
the new one (1) cent local sales tax revenues and on
progress toward completion of capital projects
authorized under the 3/8 cent portion of the tax. Ongoing
Develop 3/8 Cent Capital Project financing plan, issue
temporary note, and ensure timely purchase of items. Ongoing
Continued on-going employee training for all Lawson
financial applications. Ongoing
Located additional grant funding opportunities as
American Recovery and Reinvestment Act (ARRA)
Grants are completed. Completed
Create a Grants Compliance Manual for City Staff. Ongoing
Redesigned the business license assessment forms,
statements and licenses to simplify them and make
them more user friendly. Completed
The Treasury page of the City’s web site was updated
to include local tax rates and information on the Citys
key revenue sources. Completed
Continue efforts to implement an integrated budget
module for the City’s Financial system. Ongoing
Finalized the update of the City’s Purchasing Manual and
posted it to the City web site. Completed
Monitored and provided support for the City and
Municipal League’s 2013 legislative package with a
focus on obtaining improved sales tax reporting from the
state. Completed
Facilitated the issuance of the 2013 Capital
Improvement Bonds. Completed
193
Return to Table of Contents
City of Little Rock, Arkansas
Finance
2014 Department Goals
Obtain Government Finance Officers (GFOA) Certificate of Recognition for
Budget Preparation.
Obtain GFOA Certificate of Achievement for Excellence in Financial Reporting
for FY13 Comprehensive Annual Financial Report (CAFR).
Provide support and quarterly reporting to the LRCent Committee and the
Board of Directors on the status of the one (1) cent local sales tax revenues
and on progress toward completion of capital projects authorized under the 3/8
cent portion of the tax.
Develop 3/8-Cent Capital Project financing plan, issue short-term financing note
if required, and ensure timely purchase of items.
Staff will monitor and report on infrastructure projects funded by the issuance
of the 2013 Capital Improvement Bonds for Street and Drainage Projects.
Continue on-going employee training program for all Lawson financial
applications.
Continue efforts to implement an integrated budget module for the City’s
Financial system.
Continue the aggressive pursuit of Federal, State, Local and private grant
opportunities.
Update the Grant Compliance Manual to include requirements of new OMB
circulars as they are released.
Review the current bid process and explore the possibility of alternatives for
implementation of a process that allows acceptance of electronic bids.
Perform quarterly review and maintenance of outstanding purchase orders.
Staff will work with Information Technology to replace the current mainframe
false alarm system and implement a web-based application to process false
alarm payments.
Continue to capture e-mail addresses for business license holders and continue
efforts to improve and promote the utilization of e-commerce for assessment
forms, statements and license applications.
194
Return to Table of Contents
City of Little Rock, Arkansas
Finance
Department: Finance
Funding Source: General Fund
Budget: $3,136,992
Department Description:
The Finance Department provides accounting and reporting, budgeting, internal audit, pension
administration, accounts payable, payroll, purchasing, treasury management, grants management,
and print shop services. In addition, Finance advises the City Manager and other departments on
financial issues. Monthly financial reports are presented to the Board of Directors and posted to the
City’s web site for transparency to citizens and other interested parties.
2012 2013 2014
Actual
Budget Budget
Objective: To monitor compliance with the annual adopted budget.
Demand: To prepare consolidated monthly
variance reports for department variances >
$50,000 and 5% of budget. 12 12 12
Workload: Prepared consolidated monthly
variance reports for department variances >
$50,000 and 5% of budget. 12 12 12
Efficiency: Consolidated variance reports
prepared monthly. 11 1
Effect/Outcome: Percentage of consolidated
monthly variance reports for department variances
> $50,000 and 5% of budget completed. 100% 100% 100%
Objective: To provide accurate and efficient accounting and reporting for all public funds
received for the City and maintained by the Finance Department.
Demand: Number of journal entries to be
processed and completed. 1,558 1,500 1,500
Workload: Number of journal entries
processed and completed. 1,558 1,500 1,500
Efficiency: Average number of journal entries
processed and reviewed per month. 130 125 125
Effect/Outcome: Percentage of journal entries
completed per year. 100% 100% 100%
Objective: To provide accurate and timely payment of all invoices properly submitted
according to policy and procedure guidelines. Payments should be issued within 30 days.
Demand: Number of invoices to be processed
and recorded. 79,416 70,000 75,000
Workload: Number of invoices processed,
recorded, and completed. 79,416 70,000 70,000
Efficiency: Number of invoices processed per
hour. 38 33 36
Effect/Outcome: Percentage of invoice
payments issued within 30 days. 98% 95% 95%
195
Return to Table of Contents
City of Little Rock, Arkansas
Finance
2012 2013 2014
Actual
Budget Budget
Objective: To provide and maintain a systematic method of accounting for and controlling
City’s assets.
Demand: Number of departmental annual asset
inventory counts scheduled. 41 41 41
Workload: Number of addition, retirement,
depreciation, transfer, and adjustment
transactions processed. 32,046 30,000 30,000
Efficiency: Number of departmental asset
inventory counts completed. 41 41 41
Efficiency: Transactions processed per month. 2,675 2,500 2,500
Effect/Outcome: Percentage of departmental
annual asset inventory counts conducted. 100% 100% 100%
Objective: To produce accurate and timely payroll service to the employees of the City.
Demand/Workload: Number of Payroll
transactions lines processed and recorded. 2,269,200 5,150,000 2,500,000
Efficiency: Payroll transaction lines processed
and posted per month. 189,100 429,166 208,333
Effect/Outcome: Percentage of payroll
transactions processed in the regular bi-weekly
cycle. 98% 98% 98%
Objective: To achieve a current business license fee collection rate of 99%.
Demand/Workload: Net amount billed annually
for business licenses. $6,191,622 $6,417,874 $6,490,260
Efficiency: Revenue collected from business
license fees. $6,070,952 $6,304,395 $6,363,000
Effect/Outcome: Percentage of business
license fees collected. 98% 98% 98%
The departmental goals and objectives link with the
Statement of Management Policy for Financial Reporting.
196
Return to Table of Contents
City of Little Rock, Arkansas
Human Resources
Human Resources
Mission Statement
To provide managers, administrators, and other employees
with services consistent with sound human resource
principles, that contributes to an effective and efficient work
force supportive of Little Rock Municipal Government
operations.
City Manager
Director of Human
Resources
Risk Management
Occupational Health
Safety/Loss Control
Benefits
A
dministration
Labor and Employee
Relations
HRIS/Records
Employment and
Classification
Employee
Classifications
Employment
Services
197
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Human Resources
Expenditure Budget
2012 2013 2014
Description
Actual
Expenditures
Adopted
Budget
Adopted
Budget
Salaries and Employee Benefits $1,064,468 $1,249,772 $1,315,171
Supplies and Materials 30,998 13,200 13,200
Contractual 237,911 285,764 302,514
Repairs and Maintenance 707 1,121 1,792
Total $1,334,084 $1,549,857 $1,632,677
Staffing 19 19 19
$0
$350,000
$700,000
$1,050,000
$1,400,000
2012
2013
2014
CapitalRepairs and
Maintenance
ContractualSupplies and
Materials
Personnel
Total Allocations By Fiscal Year And Account Category
Approximately $65,300 of the personnel increase is attributed to salary,
health care, and pension contribution increases for non-uniform employees.
The Contract allocation includes additional funds for various employee
events.
FY 14 % Change
Proposed from
Resources for Budget Budget Prior Year
100 General Fund $1,632,677 5.34%
198
Return to Table of Contents
City of Little Rock, Arkansas
Human Resources
2013 Department Priorities Status
Completed a review and updated the Administrative
Policies and Procedures Manual. Completed
Conducted Fair Labor Standards Act (FLSA) follow-up
meetings with Departments. Completed
Implemented a "New" Non-Uniform Pension plan;
including plan document, qualification filing and
employee enrollment meetings. Completed
Implemented safety initiatives with key departments. Completed
Reviewed Health Care renewal proposal including
additional requirements related to Patient Protection and
Affordable Care Act (PPACA). Completed
Revise the physical ability test for the firefighter position. Ongoing
Conducted additional hiring process training and
expanded the interviewing and background investigation
phases. Completed
Developed a notification system for "status of job
description" updates on employment requisitions. Completed
199
Return to Table of Contents
City of Little Rock, Arkansas
Human Resources
2014 Department Goals
Review onboarding procedures and implement changes to enhance City
processes.
Conduct an audit and review all current department independent contractors
to ensure compliance with Internal Revenue Service (IRS) regulations.
Conduct a self-audit of all overtime exempt classifications to ensure
compliance with Fair Labor Standards Act (FLSA) regulations.
Review the health care insurance renewal proposal and additional impacts
from the Patient Protection and Affordable Health Care Act (PPACA).
Provide training on the Employment Section of the Administrative Policies
and Procedures Manual.
200
Return to Table of Contents
City of Little Rock, Arkansas
Human Resources
The departmental goals and objectives link with the
Board of Directors Statement of Management Policy for Basic City
Services and Quality of Life.
Department: Human Resources
Funding Source: General Fund
Budget: $1,632,677
Department Description:
To provide administrative human resource management support to all departments; to establish,
implement, review, and modify policies and procedures.
2012 2013 2014
Actual
Budget Budget
Objective: To administer benefit programs provided for city employees, including insurance
coverage and to ensure that quality benefits are provided within financial and legal
parameters.
Demand: Total Enrollment meetings. 50 44 46
Workload: Number of enrollment meetings
conducted. 50 44 46
Efficiency: Completed enrollment meeting
materials by contract and or payroll deadlines. 100% 100% 99%
Effect/Outcome: Percentage of enrollment
meeting materials completed by payroll and
Contract targets. 100% 100% 100%
Objective: To process and maintain job descriptions and job specifications.
Demand: Number of active job classifications. 425 417 438
Workload: Number of classifications requests or
new position requests per year.(includes LRCVB) 79 155 95
Efficiency: Complete research and submit
completed documents for review by requesting
department within 60 days. 38 26 60
Effect/Outcome: Average number of days to
complete research and submit proposed job
descriptions/specification. 38 26 60
201
Return to Table of Contents
This page left blank intentionally.
202
Return to Table of Contents
City of Little Rock, Arkansas
Information Technology
Information Technology
Mission Statement
To provide systems management, administration, review and
development of IT policies and standards, technical support,
training, technology design and selection, technology
acquisition, and strategic planning services for all city
departments.
Assistant City Manager
Information Technology
Director
Administration
Application Programming Networking
203
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Information Technology
$0
$750,000
$1,500,000
$2,250,000
$3,000,000
2012
2013
2014
CapitalRepairs and
Maintenance
ContractualSupplies and
Materials
Personnel
Total Allocations By Fiscal Year And Account Category
The 2014 Personnel Budget for IT is less than the original 2013 Personnel
Budget. Funding for two (2) vacant positions has been eliminated. If the
positions are filled, the cost will be covered by special projects or grants.
Expenditure Budget
2012 2013 2014
Description
Actual
Expenditures
Adopted
Budget
Adopted
Budget
Salaries and Employee Benefits $2,398,187 $2,993,210 $2,876,466
Supplies and Materials 161,602 105,119 105,375
Contractual 262,044 471,514 468,119
Repairs and Maintenance 608,625 540,060 539,362
Capital 153,285 369,062 369,000
Total $3,583,744 $4,478,965 $4,358,322
Staffing 38 39 39
FY 14 % Change
Proposed from
Resources for Budget Budget Prior Year
100 General Fund $4,358,322 -2.69%
204
Return to Table of Contents
City of Little Rock, Arkansas
Information Technology
2013 Department Priorities Status
Created a Business Continuity Plan for the Information
Technology Department and assisted other City
Departments in creating plans for their respective areas. Completed
Developed a web-based impound system to upgrade and
replace the existing mainframe system. Completed
A
ssist the Little Rock District Courts with conversion to the
State of Arkansas Administrative Office of the Courts
(AOC) system by developing interfaces to the Little Rock
Police Department information required by the Little
District Courts. Ongoing
Assist Finance with the upgrade of the False Alarm billing
system. Ongoing
Assist Little Rock Police Department with the upgrade of
the 311 System's hardware and software. Ongoing
Assisted the Little Rock Police Department in upgrading
the 911 phone system. Completed
Upgrade and replace the current Little Rock Police
Department Incident System on the mainframe. Ongoing
Purchase 1400 Office 2013 licenses for all of the City's
workstations and update all the devices with the latest
possible version. Ongoing
Replaced the oldest 200 of the 1400 workstations in the
City's network. Completed
Assist the Community Programs Department in selecting
and implementing a contract management and service
tracking system. Ongoing
Upgrade and replace what is currently known today on the
mainframe as Little Rock Police Department "Person's
World System". Ongoing
Upgrade and replace the current Little Rock Police
Department Property Inventory System on the mainframe. Ongoing
Create an Administrative module to process code tables,
supplement transfers, or Little Rock number transfers. Ongoing
205
Return to Table of Contents
City of Little Rock, Arkansas
Information Technology
2014 Department Goals
Assist the Little Rock District Courts with conversion to the State of
Arkansas Administrative Office of the Courts (AOC) system by develop
interfaces to Little Rock Police Department information required by the Little
Rock District Courts.
Assist Finance with the upgrade of the False Alarm billing system.
Assist Little Rock Police Department with the upgrade of the 311 System,
both hardware and software.
Assist Little Rock Police Department with the upgrading of the Computer
Aided Dispatch (CAD) system.
Upgrade and replace the current Little Rock Police Department Incident
System on the mainframe.
Continue to move users to the latest version of Microsoft Office that their
respective machine can handle. Continue to provide user training on Office
2013.
Continue to work with departments to identify workstations that need to be
replaced.
Upgrade and replace portions of the City’s existing phone system to a Voice
over Internet Protocol (VOIP) phone system.
Assist Parks Department with technical requirements for the John Barrow
West Central Community Center facility.
Assist the Community Programs Department in implementing a contract
management and service tracking system.
Upgrade and replace what is currently known today on the mainframe as
Little Rock Police DepartmentPerson’s World System”.
Upgrade and replace the current Little Rock Police Department Property
Inventory System on the mainframe.
Create an Administrative module to process code tables, supplement
transfers, or Little Rock number transfers.
Create an Apartment Complex Billings to track the police responses, billing,
and payments.
Develop a Graphic Information System (GIS) utilizing open source software
to provide better graphical information for the Police and Fire departments.
Implement an Open Data System that can publish data sets for the citizens
of Little Rock; utilizing standard views, mapping tools, and file formats.
Assist the Little Rock Police Department in implementing a crime prediction
and analysis system.
206
Return to Table of Contents
City of Little Rock, Arkansas
Information Technology
Department: Information Technology
Funding Source: General Fund
Budget: $4,358,322
Department Description:
To provide systems management, administration, review and development of Information
Technology policies and standards, technical support, training, technology design and selection,
technology acquisition, and strategic planning services for all city departments.
2012 2013 2014
Actual
Budget Budget
Objective: To insure that the City's local area computer network is available 99% of the
available work hours.
Demand: Hours available in the work year. 8,760 8,760 8.760
Workload: Hours available for use per year. 8,760 8,760 8,760
Efficiency: Hours available for use per month. 730 730 730
Effect/Outcome: Percentage network is available
during work hours.
99% 99% 99%
Objective: To insure that the City's Mainframe is available 99% of the available work hours.
Demand: Hours available in the work year. 8,760 8,760 8.760
Workload: Hours available for use per year. 8,760 8,760 8,760
Efficiency: Hours available for use per month. 730 730 730
Effect/Outcome: Percentage of available work
hours. 99% 99% 99%
Objective: To insure that 97% of the city staff trouble tickets receive a satisfactory or better
rating.
Demand: Number of trouble ticket per year. 8,311 8,333 8,500
Workload: Number of ticket processed within the
year. 8,311 8,333 8,500
Efficiency: Number of satisfactory or better
tickets. 8,062 8,166 8,330
Effect/Outcome: Percent of satisfactory or better
rated tickets. 97% 98% 98%
The departmental goals and objectives link with the
Board of Directors Statement of Management Policy for Basic City
Services.
207
Return to Table of Contents
This page left blank intentionally.
208
Return to Table of Contents
City of Little Rock, Arkansas
Planning and Development
Planning & Development
Mission Statement
To enhance the quality of life for the citizens of Little Rock by
providing a department, which encourages quality growth,
development and redevelopment and stabilization of
neighborhoods through a concentrated effort of planning,
land use controls, permitting, and enforcement.
City Manager
Director of Planning and
Development
Administration
Zoning & Subdivisions
Plans Review
Plans & Enforcement
Subdivision Administration
Code Enforcement Zoning
& Sign
Planning
GIS/Graphics
Planners
Building Codes
Plans Examination
Permits & Inspection
Administration
Building Inspections
Plumbing & Gas Inspections
Electrical Inspections
Mechanical Inspections
209
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Planning and Development
Expenditure Budget
2012 2013 2014
Description
Actual
Expenditures
Adopted
Budget
Adopted
Budget
Salaries and Employee Benefits $1,670,312 $2,295,429 $2,356,928
Supplies and Materials 50,334 58,678 75,132
Contractual 53,105 73,178 72,357
Repairs and Maintenance 64,218 66,863 68,551
Capital 0 5,000 11,000
Total $1,837,969 $2,499,148 $2,583,968
Staffing 39 39 39
$0
$600,000
$1,200,000
$1,800,000
$2,400,000
2012
2013
2014
CapitalRepairs and
Maintenance
ContractualSupplies and
Materials
Personnel
Total Allocations By Fiscal Year And Account Category
Approximately $61,500 of the personnel increase is attributed to salary,
health care, and pension contribution increases for non-uniform employees.
In addition, there are slight increases in supplies and utilities in the 2014
budget.
FY 14 % Change
Proposed from
Resources for Budget Budget Prior Year
100 General Fund $2,583,968 3.39%
210
Return to Table of Contents
City of Little Rock, Arkansas
Planning and Development
2013 Department Priorities Status
Continue to provide staff support for various boards,
commissions and committees including Planning
Commission, City Beautiful Commission, Historic District
Commission, and the Board of Directors. Ongoing
Continue to work on the implementation of the Historic
Preservation plan and add an "Institutional" category to
the MacArthur Park Design Guidelines. Ongoing
Completed one area of review and updated the City's
future land use plan and started the process for one area
west of I-430. Completed
Coordinated with Planning Commission and Board of
Directors a needed review of the Zoning and Subdivision
ordinance. Completed
Staff reviewed and processed approximately 150 requests
for rezoning, conditional uses, variances, preliminary plats
and planned developments. Completed
Continue effort to address the issue of unsafe structures. Ongoing
Continue to be involved with the Main Street Revitalization
Committee and Subcommittees (Downtown Little Rock
Partnership) and various planning efforts, Green America's
Capital and the National Endowment for the Arts (NEA)
Our Town grant. Ongoing
Begin the process to undertake a review/analysis of the
zoning/subdivision ordinance if funding is identified.
(Process was not funded.)
Other
(Please Explain)
211
Return to Table of Contents
City of Little Rock, Arkansas
Planning and Development
2014 Department Goals
Continue to provide staff support for various boards, commissions and
committees including Planning Commission, City Beautiful Commission,
Historic District Commission, River Market Design Review Committee and
the Board of Directors.
Continue to work on the implementation of the Historic Preservation plan.
Complete one area of review and update the City's future land use plan and
begin the process for the northwest part of the City.
Coordinate with Planning Commission and Board of Directors any needed
review of the ordinance.
Staff will review and process approximately 150 requests for rezoning,
conditional uses, variances, preliminary plats and planned developments.
Continue effort to address the issue of unsafe structures.
Continue to be involved with the Main Street Revitalization Committee and
Subcommittees (Downtown Little Rock Partnership).
Continue to work with various planning efforts or groups, including Main
Street, a design overlay district for John Barrow Road and the Bicycle
Friendly Community Committee.
212
Return to Table of Contents
City of Little Rock, Arkansas
Planning and Development
Department: Planning and Development
Funding Source: General Fund
Budget: $2,583,968
Department Description:
To administer and enforce the City’s development ordinances and construction codes.
2012 2013 2014
Actual
Budget Budget
Objective: To process 95% of all applications within forty-five (45) days.
Demand: Land Use, Historic District, and River
Market District cases to be processed. 27 24 26
Workload: Land Use, Historic District, and River
Market District cases processed. 27 24 26
Efficiency: Cases reviewed/completed per month. 2 2 2
Effect/Outcome: Completion of cases 100% 100% 100%
Objective: To process all inspection request within one (1) day.
Demand: Building, Plumbing Mechanical, and
Electrical inspection requests possible. 14,000 14,000 14,500
Workload: Building, Plumbing Mechanical, and
Electrical inspection requests completed. 14,000 14,000 14,500
Efficiency: Inspection requests completed per
year 14,000 14,000 14,500
Effect/Outcome: Percentage of requests
completed. 100% 100% 100%
Objective: To complete zoning, subdivision, and sign code enforcement inspections,
and re-inspections within policy-directed time frames.
Demand: Zoning, subdivision and sign code
inspections and re-inspections to be completed. 4,703 6,500 6,000
Workload: Zoning, subdivision and sign code
inspections, and re-inspections completed. 4,703 6,500 6,000
Efficiency: Cases processed per year. 4,703 6,500 6,000
Effect/Outcome: Compliance and completion of
cases. 100% 100% 100%
Objective: To process 85% of all applications within forty-five (45) days of fling for Board of
Adjustment and Planning Commission and within ninety (90) days of filing for final Board action.
Demand: Processing of Conditional Use, Tower
Use, Special Use, Variances, Preliminary or Final
Plats, Planned Developments and Site Plan
Reviews.
249 295 275
Workload: Total Cases available per year. 249 295 275
Efficiency: Cases processed per year. 249 295 275
Effect/Outcome: Compliance and completion of
cases. 100% 100% 100%
213
Return to Table of Contents
City of Little Rock, Arkansas
Planning and Development
Objective: To review assess and respond to all Landscape Plan submittals within ordinance and
policy established time frames.
Demand: Landscape and Building Plan
submittals.
283 250 250
Workload: Review of plans, research of case
files, meetings with applicants, site inspections
and re-inspections, documenting files. 283 250 250
Efficiency: Cases processed per year. 283 250 250
Effect/Outcome: Compliance and completion of
cases. 100% 100% 100%
The departmental goals and objectives link with the
Board of Directors Statement of Management Policy for Basic City
Services.
214
Return to Table of Contents
City of Little Rock, Arkansas
Housing and Neighborhood Programs
Housing & Neighborhood
Programs
Mission Statement
To enhance the quality of life for the citizens of Little Rock by
encouraging quality, affordable development and
redevelopment while working closely with neighborhood
organizations to identify resources needed to strengthen and
make improvements in their areas; and to protect the health
and safety of the citizenry through the efficient
implementation and enforcement of environmental and
animal services codes.
Assistant City Manager
Director of Housing &
Neighborhood Programs
Administration
/
Landbank
Program
Neighborhood Programs
Code Enforcement
Demolition & Contract
Service
Neighborhood Alert
Centers
Neighborhood Resource
Center
CDBG & Housing
Programs
Community Development
Neighborhood
Revitalization
Housing Programs
Emergency Shelter
Grants
Animal Services
Enforcement
Shelter
Educations
Environmental Services
215
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Housing and Neighborhood Programs
Expenditure Budget
2012 2013 2014
Description
Actual
Expenditures
Adopted
Budget
Adopted
Budget
Salaries and Employee Benefits $3,256,350 $4,490,114 $4,702,178
Supplies and Materials 257,188 472,911 339,930
Contractual 365,647 359,233 414,866
Repairs and Maintenance 194,470 197,439 216,865
Capital 0 15,000 0
Total $4,073,655 $5,534,697 $5,673,839
Staffing 96 103 103
$0
$1,250,000
$2,500,000
$3,750,000
$5,000,000
2012
2013
2014
CapitalRepairs and
Maintenance
ContractualSupplies and
Materials
Personnel
Total Allocations By Fiscal Year And Account Category
Approximately $212,000 of the personnel increase is attributed to salary,
health care, and pension contribution increases for non-uniform employees.
Other changes reflect the additional supplies and operating funds required
for the operation of the Wright Avenue, Oak Forest, and Baseline Alert
Centers. The Fleet budget has been reduced based on changing fuel cost
and experience.
FY 14 % Change
Proposed from
Resources for Budget Budget Prior Year
100 General Fund $5,673,839 2.51%
216
Return to Table of Contents
City of Little Rock, Arkansas
Housing and Neighborhood Programs
2013 Department Priorities Status
Housing developed a quarterly news letter. Completed
Housing will implement a "Neighborhood of the Year"
program. Ongoing
Developed divisional brochures for the entire department. Completed
To increase public awareness, Housing will develop Public
Service Announcements for each division. Ongoing
Provide ongoing Code Officer training. Ongoing
Continue to acquire Land Bank properties through
donations, lien foreclosures and purchases for future
development. Ongoing
Expand the capacity at the dog park and animal village. Ongoing
Increased the number of animal adoptions exceeding
1,500 annually. Completed
217
Return to Table of Contents
City of Little Rock, Arkansas
Housing and Neighborhood Programs
2014 Department Goals
Housing will continue publishing a department quarterly newsletter.
Implement a "Neighborhood of the Year Program".
Develop Public Service Announcements (PSA) to highlight each division.
Increase staffing levels of Code Enforcement Officers while providing training
opportunities for both new and existing employees.
Continue city-wide adoption events to aid in the increase of adoptions and
sales of pet licenses.
Develop single family units within the Land Bank and the Neighborhood
Stabilization Program 2 (NSP2) boundaries.
Develop and implement a comprehensive marketing strategy that will
promote the housing availability within Rolling Pines subdivision.
Expand the Dog Park to include water fountains for people and a water play
area for dogs.
218
Return to Table of Contents
City of Little Rock, Arkansas
Housing and Neighborhood Programs
Department: Housing and Neighborhood Programs
Funding Source: General Fund
Budget: $5,673,839
Department Description:
To provide administrative and managerial support to the Department of Housing and Neighborhood
Program’s divisions and program activities; Community Development Block Grant, Neighborhood
Programs, Neighborhood Services/Alert Centers, Willie L. Hinton Neighborhood Resource Center,
and Environment Services.
2012 2013 2014
Actual
Budget Budget
Objective: To inspect neighborhood rental property.
Demand: Rental property to be inspected. 1,500 1,500 1,500
Workload: Rental property inspected. 840 944 1,500
Efficiency: Average Rental property inspected per
month. 70 79 125
Effect/Outcome: Percentage of rental inspections
completed yearly.
56% 63% 100%
Objective: To enforce nuisance codes through property inspections.
Demand: Nuisance code inspections to be
performed. 20,000 24,000 22,000
Workload: Nuisance code inspections
performed. 15,188 16,358 22,000
Efficiency: Average nuisance code inspections
done per month. 1,266 1,363 1,833
Effect/Outcome: Percentage of nuisance code
inspections completed per year. 76% 68% 100%
The departmental goals and objectives link with the
Board of Directors Statement of Management Policy for a
Safe City and Basic City Services.
219
Return to Table of Contents
This page left blank intentionally.
220
Return to Table of Contents
City of Little Rock, Arkansas
Public Works General Fund
Public Works
General Fund
Mission Statement
To ensure all construction, remodeling and repairs of City
owned buildings are construction according to plans and
specifications in the most economical, environmentally
friendly manner.
City Manager
Director of Public Works
Building Services
221
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Public Works General Fund
Expenditure Budget - General Fund
2012 2013 2014
Description
Actual
Expenditures
Adopted
Budget
Adopted
Budget
Salaries and Employee Benefits $587,103 $634,737 $677,498
Supplies and Materials 35,888 60,635 58,248
Contractual 136,885 139,495 135,690
Repairs and Maintenance 202,285 303,479 295,046
Total $962,161 $1,138,346 $1,166,482
Staffing 13 13 13
$0
$187,500
$375,000
$562,500
$750,000
20122
2013
2014
Repairs and
Maintenance
ContractualSupplies and
Materials
Personnel
Total Allocations By Fiscal Year And Account Category
Approximately $42,760 of the personnel increase is attributed to salary,
health care, and pension contribution increases for non-uniform employees.
FY 14 % Change
Proposed from
Resources for Budget Budget Prior Year
100 General Fund $1,166,482 2.47%
222
Return to Table of Contents
City of Little Rock, Arkansas
Public Works General Fund
2013 Department Priorities Status
Energy Efficient Building Maintenance: Continue to support
maintenance and construction that will make buildings
more energy efficient, less expensive to maintain and
environmentally friendly. Ongoing
Installation of Motion Sensors: Continue to install motion
sensors on lighting to conserve energy as funds become
available. Ongoing
223
Return to Table of Contents
City of Little Rock, Arkansas
Public Works General Fund
2014 Department Goals
Energy Efficient Building Maintenance: Continue to support maintenance and
construction that will make buildings more energy efficient, less expensive to
maintain and environmentally friendly.
Installation of Motion Sensors: Continue to install motion sensors on lighting to
conserve energy as funds become available.
224
Return to Table of Contents
City of Little Rock, Arkansas
Public Works General Fund
Department: Public Works
Funding Source: General Fund
Budget: $1,166,482
Department Description:
To ensure all construction, remodeling and repairs of City owned buildings are constructed
according to plans and specifications in the most economical, environmentally friendly manner.
2012 2013 2014
Actual
Budget Budget
Objective: To complete all building-related service work orders in a timely fashion.
Demand: Work orders to be completed from City
departments. 2,200 1,400 1,350
Workload: Work orders completed. 2,200 1,400 1,350
Efficiency: Work orders completed per month. 183.33 116.67 112.50
Effect/Outcome: Total percentage of work orders
completed. 100% 100% 100%
The departmental goals and objectives link with the
Board of Directors Statement of Management Policy for Basic City
Services.
225
Return to Table of Contents
This page left blank intentionally.
226
Return to Table of Contents
City of Little Rock, Arkansas
Parks and Recreation
Parks and Recreation
Mission Statement
To create a meaningful parks and recreation system that
provides quality leisure services, promotes the natural
environment, local economy and health of the community and
strengthens the diversity of a democratic society.
Assi stant
City Manger
Di rector of Parks
And
Recreation
Maintenance
Horticulture
Urban Forestry
Recreation
Programs
Program
Design
Cultural
Museum
Administration
Marathon River Market
Golf
Jim Dailey
Fi
t
n
ess
Ce
n
te
r
227
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Parks and Recreation
Expenditure Budget - General Fund
2012 2013 2014
Description
Actual
Expenditures
Adopted
Budget
Adopted
Budget
Salaries and Employee Benefits $4,952,469 $6,692,755 $6,957,661
Supplies and Materials 436,183 573,941 529,592
Contractual 1,350,890 1,504,077 1,451,465
Repairs and Maintenance 729,136 763,390 800,973
Capital 7,299 0 0
Total $7,475,977 $9,534,163 $9,739,691
Staffing
117 119 122
$0
$1,750,000
$3,500,000
$5,250,000
$7,000,000
2012
2013
2014
Repairs and
Maintenance
ContractualSupplies and
Materials
Personnel
Total Allocations By Fiscal Year And Account Category
The increases in the Parks Department reflect the continuation of the new
sales tax allocation to provide enhanced park maintenance and support for
the operating cost of the Centre at University Park for a full year. In addition,
several contract positions were reclassified as part-time employees during
the year. The budget is now reflected in personnel cost. The increases in
the Parks Department personnel are attributed to salary, health care, and
pension contribution increases for non-uniform employees and the addition
of a Therapeutic programming position, a Parks maintenance position, and a
Recreation programmer.
FY 14 % Change
Proposed from
Resources for Budget Budget Prior Year
100 General Fund $9,739,691 2.16%
228
Return to Table of Contents
City of Little Rock, Arkansas
Parks and Recreation
2013 Department Priorities Status
Arkansas River Trail: Continue to seek solutions to
complete the construction of the Arkansas River Trail. Ongoing
The Centre at University Park: The Centre at University
Park opened in the fall of 2013. Completed
Park Maintenance Upgrade: Park maintenance was
upgraded from Class C to Class B. Completed
Parks Revenue Bond Projects: War Memorial, Prospect
Terrace and Natural Steps revenue bond projects were
completed. Completed
Capital Projects: Continue the implementation of capital
projects funded via the 2012 City Sales Tax increase,
such as Natural Steps, Parks Upgrade, Trails, West
Central Community Center and Pool. Ongoing
Little Rock Parks and Recreation Master Plan: Update the
2001 Little Rock Parks and Recreation Master Plan. Ongoing
MacArthur Park Master Plan: Continue the implementation
of the MacArthur Park Master Plan. Ongoing
War Memorial Redevelopment Plan: Continue refinement
and implementation of the War Memorial Redevelopment
Plan. Ongoing
Little Rock Marathon Improvements: Increased Little Rock
Marathon participation and revenue by ten (10%) in 2013. Completed
Parks and Recreation Playground Inspection Program:
Staff conducted a thorough and detailed annual inspection
of every playground within Parks and Recreation
Inventory. Completed
Lights on After School: Continuation of the "Lights on
After School" Initiative, which will continue to promote the
critical importance of quality after-school programs. Ongoing
Step Up to Health Initiative: Continue promotion of the
Step Up to Health Initiative, which will inspire citizens to
pursue healthier lifestyles, creating a more livable
community. Ongoing
Summer Playground Program: Operated an eight (8)
week Summer Playground Program at seven (7) sites
around the City. Completed
229
Return to Table of Contents
City of Little Rock, Arkansas
Parks and Recreation
2014 Department Goals
Arkansas River Trail: Continue to seek solutions to complete the
construction of the Arkansas River Trail.
Parks Maintenance Upgrade: Continue to maintain our park system at a
Class B level which has as its goal to mow parks one (1) time every ten (10)
days.
West Central Sports Complex: Begin construction of West Central
Community Center and Pool.
Parks Revenue Bond Projects: Complete the Coleman Creek Restoration
within War Memorial Park.
Natural Steps Complex: Complete first phase construction of Natural Steps
athletic complex to include 4 athletic fields, entrance road and parking.
Little Rock Parks and Recreation Master Plan: Update the 2001 Little Rock
Parks and Recreation Master Plan.
MacArthur Park Master Plan: Continue the implementation of the MacArthur
Park Master Plan.
War Memorial Redevelopment Plan: Continue the refinement and
implementation of the War Memorial Redevelopment Plan.
Little Rock Marathon Improvements: Increase Little Rock Marathon
participation and revenue by 10% in 2014.
Parks & Recreation Playground Inspection Program: Continue to conduct a
thorough and detailed annual inspection of every playground within Parks and
Recreation inventory.
Lights on After School: Continuation of the "Lights on After School" Initiative,
which will continue to promote the critical importance of quality after-school
programs within the lives of children, their families and community.
Step Up to Health Initiative: Continue promotion of the Step Up to Health
Initiative, which will inspire citizens to pursue healthier lifestyles; creating a
more livable community.
Golf Courses: Continue to seek creative solutions to make all golf courses
self-sustaining.
Jim Dailey Fitness and Aquatic Center: Continue to seek creative ways in
which to market the Jim Dailey Fitness and Aquatic Center.
Parks Sustainable Margins: Continue researching the feasibility of developing
sustainable margins adjacent to woodlands in order to reduce mowing time
and enhance wildlife habitats.
230
Return to Table of Contents
City of Little Rock, Arkansas
Parks and Recreation
Department: Parks and Recreation
Funding Source: General Fund
Budget: $9,739,691
Department Description:
To ensure that all programs and facilities successfully promotes the natural environment, local
economy and health of the community such as; horticulture, urban forestry, recreation programs,
program design, cultural museum, the Little Rock Marathon, and various parks enterprises.
2012 2013 2014
Actual
Budget Budget
Objective: Provide the citizens and visitors of Little Rock accessible recreational program
opportunities, experiences and activities which promote active living, health and wellness,
socialization, self-esteem, growth and achievement.
Demand: Total recreational opportunities
available. 204,225 337,687 344,441
Workload: Recreational opportunities attended. 201,225 309,058 315,239
Efficiency: Average seasonal attendance. 50,306 77,264 78,933
Effect/Outcome: Percentage of attendance
versus opportunities available. 99% 92% 92%
Objective: Evaluate and upgrade existing capital projects based on need and fund availability.
Demand: Capital projects to be managed
annually. 79 97 95
Workload:
A
ctual projects managed annually. 48 92 90
Efficiency: Projects actively managed monthly. 24 66 70
Effect/Outcome: Percentage of capital projects
managed. 61% 95% 95%
Objective: Mow each park every ten (10) days during the mowing season.
Demand: Number of desired mowing cycles. 21 21 22
Workload: Number of mowing cycles. 14 21 22
Efficiency: Number of monthly mowing cycles
completed. 23 3
Effect/Outcome: Percentage of annual mowing
cycles completed 67% 100% 100%
The departmental goals and objectives link with the
Board of Directors Statement of Management Policy for
Quality of Life.
231
Return to Table of Contents
This page left blank intentionally.
232
Return to Table of Contents
City of Little Rock, Arkansas
River Market
River Market
Mission Statement
The River Market strives to be a carefully crafted, intentional,
and diverse medley of owner-operated shops, stalls, and/or
day tables existing to fill a public purpose and reflecting that
which is distinctive about a community while meeting its
everyday shopping needs.
Director of Parks and Recreation
River Market
233
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
River Market
Expenditure Budget - River Market
2012 2013 2014
Description
Actual
Expenditures
Adopted
Budget
Adopted
Budget
Salaries and Employee Benefits $532,282 $590,434 $605,930
Supplies and Materials 62,938 43,766 33,000
Contractual 560,376 513,600 524,300
Repairs and Maintenance 29,932 50,000 45,445
Total $1,185,528 $1,197,800 $1,208,675
Staffing 000
FY 14 % Change
Proposed from
Resources for Budget Budget Prior Year
100 General Fund $1,208,675 0.91%
$0
$162,500
$325,000
$487,500
$650,000
2012
2013
2014
Repairs and
Maintenance
ContractualSupplies and
Materials
Personnel
Total Allocations By Fiscal Year And Account Category
The Little Rock Convention and Visitor’s Bureau will continue to operate the
River Market on behalf of the City in 2014.
234
Return to Table of Contents
City of Little Rock, Arkansas
River Market
2014 Department Goals
Little Rock Convention and Visitors Bureau (LRCVB) will continue
management of River Market operations on behalf of the City for 2014.
The City will continue to provide support to the River Market at the level of
$250,000.
235
Return to Table of Contents
This page left blank intentionally.
236
Return to Table of Contents
City of Little Rock, Arkansas
Golf
Golf
Mission Statement
To provide the best golfing experience possible at an
affordable price, featuring quality facilities and friendly service
to all golfers.
Director of Parks and Recreation
Golf
237
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Golf
Expenditure Budget
2012 2013 2014
Description
Actual
Expenditures
Adopted
Budget
Adopted
Budget
Salaries and Employee Benefits $1,207,761 $1,193,686 1,301,109
Supplies and Materials 216,865 187,575 183,091
Contractual 597,888 442,577 443,384
Repairs and Maintenance 332,460 257,714 259,581
Total $2,354,974 $2,081,552 $2,187,165
Staffing 21 21 21
FY 14 % Change
Proposed from
Resources for Budget Budget Prior Year
100 General Fund $2,187,165 5.07%
$0
$375,000
$750,000
$1,125,000
$1,500,000
2012
2013
2014
Repairs and
Maintenance
ContractualSupplies and
Materials
Personnel
Total Allocations By Fiscal Year And Account Category
The increases in the Golf Department personnel are attributed to salary,
health care, and pension contribution increases for non-uniform employees.
In addition there were increases in fleet and utility expenses.
238
Return to Table of Contents
City of Little Rock, Arkansas
Golf
2013 Department Priorities Status
Maintained Rebsamen, Hindman and War Memorial Golf
Courses to established standards. Completed
Generate a minimum of $345,185 in revenue at Hindman
Golf Course, while keeping expenditures within budget. Not Completed
Generate a minimum of $364,960 in revenue at War
Memorial Golf Course, while keeping expenditures
within budget. Not Completed
Generate a minimum of $901,420 in revenue at
Rebsamen Golf Course, while keeping expenditures
within budget. Not Completed
239
Return to Table of Contents
City of Little Rock, Arkansas
Golf
2014 Department Goals
Generate a minimum of $992,800 in revenue at Rebsamen Golf Course, while
keeping expenditures within budget.
Generate a minimum of $389,850 in revenue at War Memorial Golf Course,
while keeping expenditures within budget.
Generate a minimum of $390,000 in revenue at Hindman Golf Course, while
keeping expenditures within budget.
Maintain Rebsamen, Hindman and War Memorial Golf Courses to established
maintenance standards.
Redo drainage in a minimum of three (3) sand bunkers at Rebsamen's
eighteen hole Championship Golf Course.
240
Return to Table of Contents
City of Little Rock, Arkansas
Golf
Department: Golf
Funding Source: General Fund
Budget: $2,187,165
Department Description:
Provide and maintain quality, affordable public golf facilities, and programs for citizens of Little Rock
as well as visitors to the City, while generating revenue to maintain courses at a high standard and
make improvements to existing facilities.
2012 2013 2014
Actual
Budget Budget
Objective: To provide affordable golfing experiences for the citizens of Little Rock.
Demand: Projected golf rounds. 65,000 67,500 70,000
Workload: Actual golf rounds. 69,120 55,963 70,000
Efficiency: Average rounds per month. 5,760 4,664 5,833
Effect/Outcome: Percentage of actual rounds of
golf. 106% 83% 100%
The departmental goals and objectives link with the
Board of Directors Statement of Management Policy for
Quality of Life.
241
Return to Table of Contents
This page left blank intentionally.
242
Return to Table of Contents
City of Little Rock, Arkansas
Jim Dailey Fitness and Aquatic Center
Jim Dailey Fitness and
Aquatic Center
Mission Statement
Our goal is to increase quality customer service and to offer a
variety of health and fitness programs to the citizens of Little
Rock.
Director of Parks and Recreation
Jim Dailey Fitness and
Aquatic Center
243
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Jim Dailey Fitness and Aquatic Center
Expenditure Budget
2012 2013 2014
Description
Actual
Expenditures
Adopted
Budget
Adopted
Budget
Salaries and Employee Benefits $507,201 $631,654 $639,032
Supplies and Materials 38,542 46,214 46,293
Contractual 221,560 181,529 179,307
Repairs and Maintenance 96,899 32,078 31,933
Total $864,202 $891,475 $896,565
Staffing 999
FY 14 % Change
Proposed from
Resources for Budget Budget Prior Year
100 General Fund $896,565 0.57%
$0
$175,000
$350,000
$525,000
$700,000
2012
2013
2014
Repairs and
Maintenance
ServicesSupplies and
Materials
Personnel
Total Allocations By Fiscal Year And Account Category
Approximately $7,300 of the personnel increase is attributed to salary,
health care, and pension contribution increases for non-uniform
employees.
244
Return to Table of Contents
City of Little Rock, Arkansas
Jim Dailey Fitness and Aquatic Center
2013 Department Priorities Status
Examine all health and wellness programs to ensure they
encourage a healthy lifestyle. Ongoing
Create productive partnerships with community
organizations and corporations, which foster health,
wellness, and fitness. Ongoing
245
Return to Table of Contents
City of Little Rock, Arkansas
Jim Dailey Fitness and Aquatic Center
2014 Department Goals
Jim Dailey Fitness and Aquatic Center: Continue to seek creative ways in
which to market the Jim Dailey Fitness and Aquatic Center.
246
Return to Table of Contents
City of Little Rock, Arkansas
Jim Dailey Fitness and Aquatic Center
Department: Jim Dailey Fitness Center
Funding Source: General Fund
Budget: $896,565
Department Description:
To provide a Fitness Center which provide citizens an opportunity to participate in a variety of health
and fitness activities.
2012 2013 2014
Actual
Budget Budget
Objective: To provide a safe, healthy, and clean environment that offers a variety of aquatic, fitness
and sport activities that will improve the health and fitness of the citizens of Little Rock at the Jim
Dailey Aquatic and Fitness Center.
Demand: Potential Program attendance capacity. 198,000 154,524 159,160
Workload: Actual program attendance. 170,000 99,253 101,238
Efficiency: Attendance per month. 13,650 14,166 15,666
Effect/Outcome: Percentage of actual attendance
over potential attendance. 86% 64% 64%
The departmental goals and objectives link with the
Board of Directors Statement of Management Policy for
Quality of Life.
247
Return to Table of Contents
This page left blank intentionally.
248
Return to Table of Contents
City of Little Rock, Arkansas
Zoo
Zoo
Mission Statement
To create and maintain an outstanding zoological institution,
which serves as a model for others in education, animal care
and response to community needs; providing our visitors with
recreation, educational and cultural experience and operating
on a sound financial basis.
Assistant City
Manager
Director of Zoo
Visitor Services Education Animal Care Facilities
Operation
Development
Marketing
Gift Shop
Ticket/
Membership
Zoo Cafe
Special Events
Administration
249
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Zoo
Expenditure Budget
2012 2013 2014
Description
Actual
Expenditures
Adopted
Budget
Adopted
Budget
Salaries and Employee Benefits $2,716,220 $3,185,466 $3,447,038
Supplies and Materials 1,000,738 1,044,494 1,081,353
Contractual 1,287,231 1,249,008 1,260,648
Repairs and Maintenance 310,844 612,336 699,762
Total $5,315,033 $6,091,304 $6,488,801
Staffing 56 57 59
$0
$1,000,000
$2,000,000
$3,000,000
$4,000,000
2012
2013
2014
Repairs and
Maintenance
ContractualSupplies and
Materials
Personnel
Total Allocations By Fiscal Year And Account Category
The increase in personnel cost is attributed to salary, health care, and
pension contribution increases for non-uniform employees and reflects the
addition of one (1) Zoo Animal Registrar position and one (1) Administration
Office Assistant.
FY 14 % Change
Proposed from
Resources for Budget Budget Prior Year
100 General Fund $6,488,801 6.53%
250
Return to Table of Contents
City of Little Rock, Arkansas
Zoo
2013 Department Priorities Status
Update and replace all graphical representations and
logos relating to the Zoo. Ongoing
Reinstated the Zoo's Education Division. Completed
Zoo updated the Zoo's Master Plan. Completed
Upgraded the horticulture throughout the zoological
garden. Completed
Improve and promote diversity within the Zoo department. Ongoing
251
Return to Table of Contents
City of Little Rock, Arkansas
Zoo
2014 Department Goals
Zoo will implement the completed Master Plan.
Zoo will continue to implement the recommendations of the Strategic Plan.
Update walkways, pathways, and the graphics associated to enhance
Americans with Disability Act (ADA) accessibility.
Replace & Update Zoo graphics on all operations media and advertising
material.
Reinstate the Zoo Education division to further promote and stimulate
interest within the Zoo.
Upgrade the horticulture throughout the entire zoological gardens and
exhibits.
Install new train tracks for a train owned and operated by the Zoo.
Zoo will break ground on the new Arkansas Farm Exhibit and upgrade the
chimpanzee, elephant, bear and otter existing exhibits.
252
Return to Table of Contents
City of Little Rock, Arkansas
Zoo
Department: Zoo
Funding Source: General Fund
Budget: $6,488,801
Department Description:
The Little Rock Zoo provides educational and recreational opportunities in a fun environment that
inspires people to conserve the natural world. The Zoo is accredited by the Association of Zoos and
Aquariums (AZA) and displays more than 700 animals on 33 acres of beautifully landscaped
parkland. The Zoo offers educational programming, special events, and other activities to entertain
and educate the public and is a leading cultural attraction in central Arkansas.
2012 2013 2014
Actual
Budget Budget
Objective: To track annual gate attendance.
Demand: Anticipated annual attendance. 214,468 180,000 222,487
Workload: Actual annual attendance. 211,766 172,728 222,487
Efficiency: Average attendance per month. 17,647 14,394 18,541
Effect/Outcome: Percentage of workload over
demand. 99% 96% 100%
The departmental goals and objectives link with the
Board of Directors Statement of Management Policy for
Quality of Life.
253
Return to Table of Contents
This page left blank intentionally.
254
Return to Table of Contents
City of Little Rock, Arkansas
Fire
Fire
Mission Statement
Protecting life and property through service and education.
LRFD 24/7
City Manager
Fire Chief
Administration
Assistant Chief
Operations
Assistant Chief
Fire Prevention &
Community Outreach
Assistant Chief
Training &
Professional
Develo
p
ment
Assistant Chief
Administration &
Planning
255
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Fire
Expenditure Budget
2012 2013 2014
Description
Actual
Expenditures
Adopted
Budget
Adopted
Budget
Salaries and Employee Benefits $38,246,771 $35,625,874 $42,231,299
Supplies and Materials 889,499 1,103,779 1,035,644
Contractual 678,124 776,634 743,250
Repairs and Maintenance 1,599,093 1,660,765 1,764,393
Total $41,413,487 $39,167,052 $45,774,586
Staffing 421 421 421
% Change
Proposed from
Resources for Budget Budget Prior Year
100 General Fund $45,774,586 16.87%
$0
$12,500,000
$25,000,000
$37,500,000
$50,000,000
2012
2013
2014
Repairs and
Maintenance
ContractualSuppliesPersonnel
Total Allocations By Fiscal Year And Account Category
The Fire Department budget reflects increased funding for salaries, health
care, and pension contributions for existing staff and includes all SAFER
positions previously funded by a grant.
256
Return to Table of Contents
City of Little Rock, Arkansas
Fire
2013 Department Priorities Status
Purchased land for the Southwest Little Rock Fire Station. Completed
Institute Fire Apparatus Engineer certification programs
for all existing driver operators and firefighters. Ongoing
Successfully implemented mandatory Post Incident
Analysis of all large loss incidents. Completed
Implement a "Mass Smoke Alarm Distribution Campaign";
distributing smoke alarms to targeted demographics. Ongoing
Launch the Jr. Fire Cadet Program administered by the
Little Rock School District with direct assistance from the
Little Rock Fire Department. Ongoing
Instituted “Don’t Text and Drive Campaign"; department
video distributed to local networks and Little Rock
Television (LRTV). Completed
257
Return to Table of Contents
City of Little Rock, Arkansas
Fire
2014 Department Goals
Continue the process of Accreditation as the department embarks on Step II of
the accreditation process.
Continue to work on implementing a web-based training curriculum.
Transition Little Rock School District/Little Rock Fire Department Fire Cadet
Program to the Senior Fire Cadet Program.
Collaborate with Fire Service agencies within Central Arkansas to create and
support a comprehensive Crisis Intervention Team to better serve first
responders.
Develop a Battalion Chief's Academy and complete a correlation
developmental task book.
Establish a partnership with Central Arkansas Transit to develop strategies to
equip each CATA bus with an Automatic Electronic Defibrillator (AED).
Upgrade and utilize technology to better communicate and deploy resources.
Enhance public awareness of departmental activities.
Collaborate with Emergency Management to ensure department knowledge of,
The Hazard Mitigation Plan, Little Rock's Emergency Response Plan and
emergency support functions.
258
Return to Table of Contents
City of Little Rock, Arkansas
Fire
Department: Fire
Funding Source: General Fund
Budget: $45,774,586
Department Description:
To protect the safety, health and general welfare of the public through fire prevention and
community outreach, fire suppression, Emergency Medical Service, and special operations
response; and to ensure a competent workforce through training and education.
2012 2013 2014
Actual
Budget Budget
Objective: Train certified personnel to meet the individual training hours required by Insurance
Services Organization (ISO) and improve the competence level of the workforce.
Demand: Total number of hours of training
completed. 91,440 91,440 90,228
Workload: Total number of hours of individual
training required per year. 106,739 138,383 90,288
Efficiency: Average number of training hours per
person. 280 349 228
Effect/Outcome: Percentage of training hours vs.
required hours. 117% 151% 100%
Objective: Perform inspections of commercial structures including schools, daycare centers,
nursing homes, high-rise buildings, and hospitals.
Demand: Number of inspections on commercial
structures required annually. 2,424 2,430 2,454
Workload: Commercial Building and Structures
inspected annually. 6,208 6,304 6,367
Efficiency: Commercial Building and Structures
inspected per month. 517 525 531
Effect/Outcome: Percentage of inspections
completed annually. 256% 259% 259%
The departmental goals and objectives link with the
Board of Directors Statement of Management Policy for a Safe City.
259
Return to Table of Contents
This page left blank intentionally.
260
Return to Table of Contents
City of Little Rock, Arkansas
Police
Police
Mission Statement
To provide essential law enforcement service to the residents
of Little Rock by performing those tasks necessary to protect
life and property and to preserve the peace.
City Manager
Chief of Police
Executive Services Bureau
Administrative Services
Manger
Detective Bureau Uniformed Services Bureau
Public Affairs
Accreditation/ Staff Inspection
Internal Affairs Division Detective Division
Special Investigations
Divisions
Downtown Patrol
Northwest Patrol
Special Operations
Support Services Division
Training/Crime Prevention
Central Communications Southwest Patrol
261
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Police
Expenditure Budget
2012 2013 2014
Description
Actual
Expenditures
Adopted
Budget
Adopted
Budget
Salaries and Employee Benefits $53,197,826 $52,204,197 $61,075,124
Supplies and Materials 2,332,423 2,614,884 2,513,740
Contractual 1,861,151 1,704,793 1,697,270
Repairs and Maintenance 1,796,090 1,877,957 1,914,725
Total $59,187,490 $58,401,831 $67,200,859
Staffing 709 715 716
$0
$15,500,000
$31,000,000
$46,500,000
$62,000,000
2012
2013
2014
Repairs and
Maintenance
ContractualSupplies and
Materials
Personnel
Total Allocations By Fiscal Year And Account Category
Police Department increases reflect the continued effort to fill vacant uniform
and 911/311 call taker positions. In addition, the full cost of twenty (20)
officer positions previously funded by the American Recovery and
Reinvestment Act are included in the budget in 2014. Approximately $2.6
million of the increase in personnel cost is associated with salary, health
care and pension cost. In addition, the Police Department added a
Communications Dispatch and a Property Technician position.
FY 14 % Change
Proposed from
Resources for Budget Budget Prior Year
100 General Fund $67,200,859 15.07%
262
Return to Table of Contents
City of Little Rock, Arkansas
Police
2013 Department Priorities Status
The Police Department will continue "Click It or Ticket"
seatbelt usage campaign. Ongoing
Little Rock Police Department (LRPD) endeavors to
reduce the number of crimes against persons and
property. Ongoing
Partner with the State of Arkansas Highway Safety
Project to administer the Driving While Intoxicated
(DWI)/Driving Under Influence (DUI) enforcement
campaigns. Ongoing
LRPD will administer the Command Staff development
program. Ongoing
LRPD conducted at least one (1) Recruit school for new
officers. Completed
The department will continue to monitor the construction
of the 12th Street Police Substation. Ongoing
263
Return to Table of Contents
City of Little Rock, Arkansas
Police
2014 Department Goals
Complete the construction of the 12th Street Police Station.
Implement a new National Incident Based Recording System (NIBRS)
compliant Records Management System.
Improve and expand Police Officer recruiting efforts and conduct at least one
(1) Recruit School during 2014.
Emphasize the utilization of the Criminal Abatement Program in coordination
with the City Attorney's Office.
264
Return to Table of Contents
City of Little Rock, Arkansas
Police
Department: Police
Funding Source: General Fund
Budget: $67,200,859
Department Description:
The Police Department is to provide the citizens of Little Rock with a law enforcement system that
effectively integrates and utilizes departmental, civic and community resources, to protect life and
property, preserve law and order, enforce state law and city ordinances, within the framework of the
Constitution.
2012 2013 2014
Actual
Budget Budget
Objective: To respond to high priority calls
Demand: Calls to respond 155,175 155,525 155,687
Workload: Calls responded 155,175 155,525 155,687
Efficiency: Total minutes from dispatch to arrival 9.3 9.3 9.1
Effect/Outcome: Percentage of calls with
response time under 14 minutes
98% 98% 98%
The departmental goals and objectives link with the
Board of Directors Statement of Management Policy for a Safe City.
265
Return to Table of Contents
This page left blank intentionally.
266
Return to Table of Contents
City of Little Rock, Arkansas
Public Works Street Fund
Public Works
Street Fund
Mission Statement
To provide an efficient and economical infrastructure for the
City of Little Rock, provide quality management in all
activities of the Public Works Department, and to provide
professional service to our customers.
City Manager
Director of Public Works
Administration
Assistant Director Assistant Director
Building Services
Civil Engineering
Parking Enforcement
Traffic Engineering
Composting
Public Works Operations
Solid Waste Services
267
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Public Works Street Fund
Expenditure Budget - Street Fund
2012 2013 2014
Description
Actual
Expenditures
Adopted
Budget
Adopted
Budget
Salaries and Employee Benefits $8,055,375 $9,243,209 $9,983,570
Supplies and Materials 1,006,131 1,248,662 1,176,055
Contractual 2,856,680 3,016,319 2,890,856
Repairs and Maintenance 2,341,297 2,646,889 2,784,328
Capital Outlay 85,575 973,500 1,680,000
Transfers Out 1,351,817 466,217 848,887
Total $15,696,875 $17,594,796 $19,363,696
Staffing 211 215 213
$0
$2,500,000
$5,000,000
$7,500,000
$10,000,000
2012
2013
2014
Transfers OutCapital OutlayRepairs and
Maintenance
ContractualSupplies and
Materials
Personnel
Total Allocations By Fiscal Year And Account Category
In addition to salary and benefit cost increases, expenditure changes include
an additional allocation for capital equipment and infrastructure from the ½-
cent sales tax. Two (2) sidewalk and six (6) access ramp positions were
transferred back from special projects. Overall personnel headcount was
reduced by two (2) positions.
FY 14 % Change
Proposed from
Resources for Budget Budget Prior Year
200 Street Fund $19,363,696 10.05%
268
Return to Table of Contents
City of Little Rock, Arkansas
Public Works Street Fund
2013 Department Priorities Status
Storm Water Pollution Prevention Plan: Continue the
Central Maintenance Facility annual and quarterly
inspection and reports in accordance with the facility's
Storm Water Pollution Prevention Plan. Ongoing
2013 to 2015 Infrastructure Program: Take public input
plan and initiate design on a three year infrastructure
improvement program. Ongoing
Second Year Infrastructure Program: Complete design
and begin moving 2013 projects to construction. Ongoing
First Year Infrastructure Program: Completed construction
of the first year (2012) infrastructure program. Completed
269
Return to Table of Contents
City of Little Rock, Arkansas
Public Works Street Fund
2014 Department Goals
2013 Street Resurfacing Program: Complete the 2013 Street Resurfacing
Program.
2014 Street Resurfacing Program: Complete the annual street resurfacing
program.
2014 Sidewalk Program: Complete the annual sidewalk program with revenue
from the 2011 Sales tax.
Expand street light patrol area for downtown to ensure lighting levels are
maintained.
Continue the street overlay program where it impacts the traffic control
systems.
Continue preventive maintenance program and update Central Traffic Control
software.
Design and complete traffic signal installation at Cantrell Road and Ranch
Boulevard.
Scott Hamilton (Baseline Road to J.E. Davis Drive): Assist the Arkansas
Highway and Transportation Department in contract award and construction
with a goal of construction completion in 2014.
Design bicycle lanes for Wright Avenue, Dr. Martin Luther King, Jr. Drive, and
Chester Street.
Design bicycle lanes for 9th Street from Interstate 30 to Commerce Street.
270
Return to Table of Contents
City of Little Rock, Arkansas
Public Works Street Fund
Department: Public Works
Funding Source: Street Fund
Budget: $19,363,696
Department Description:
To maintain and improve a comprehensive infrastructure system that meets the changing needs of
the community while protecting the integrity of the environment.
2012 2013 2014
Actual
Budget Budget
Objective: To review and approve commercial building permits for consistency with Code
requirements for streets, drainage, and environmental programs.
Demand: Permits for review 88 89 90
Workload: Permits reviewed 88 89 90
Efficiency: Permits processed per month. 7.3 7.4 7.5
Effect/Outcome: Percentage of permits completed. 100% 100% 100%
Objective: Administer Street Sweeping Program to clean the streets, remove debris, and
prevent interference with the City’s drainage system and providing a clean and aesthetically
pleasing environment.
Demand: Annual Street Sweeping Program
miles. 30,000 30,000 30,000
Workload: Sweeping Program Street Lane
miles. 24,389 20,773 30,000
Efficiency: Program Miles Completed per
month. 2,032 1,731 2,500
Effect/Outcome: Percentage of miles completed. 81% 69% 100%
Objective: To respond to citizen requests/complaints regarding Traffic Issues affecting
neighborhoods and/or other parts of the City.
Demand: Requests for review. 353 350 350
Workload: Requests reviewed 353 350 350
Efficiency: Requests completed per month. 29 29 29
Effect/Outcome: Percentage of requests
submitted/completed. 100% 100% 100%
The departmental goals and objectives link with the
Board of Directors Statement of Management Policy for
Infrastructure and Quality of Life.
271
Return to Table of Contents
This page left blank intentionally.
272
Return to Table of Contents
City of Little Rock, Arkansas
Fleet Services
Fleet Services
Mission Statement
It is the mission of the City of Little Rock Fleet Services Department
to provide quality and cost efficient vehicles and work equipment,
fuel, vehicle storage and other fleet support services to our
customers in a timely, environmentally friendly atmosphere. We
seek to maintain a safe and wholesome work environment and
opportunity for all employees while being frugal with the tax dollars
of the citizens of Little Rock.
Assistant City
Manager
Director of
Fleet Services
Special Programs
Support Services
Maintenance
Administration
Vehicle Storage
273
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Fleet Services
Expenditure Budget
2012 2013 2014
Description
Actual
Expenditures
Adopted
Budget
Adopted
Budget
Salaries and Employee Benefits $3,041,298 $3,490,205 $3,686,321
Supplies and Materials 6,135,116 6,625,630 6,694,650
Contractual 2,275,706 2,209,134 2,399,642
Repairs and Maintenance 15,769 161,600 249,875
Depreciation 109,634 129,500 105,200
Transfers Out 45,000 00
Total $11,622,523 $12,616,069 $13,135,688
Staffing 59 61 61
$0
$1,750,000
$3,500,000
$5,250,000
$7,000,000
2012
2013
2014
Transfers OutDepreciationRepairs and
Maintenance
ContractualSupplies and
Materials
Personnel
Total Allocations By Fiscal Year And Account Category
The Fleet Services budget is balanced with projected net income of
approximately $8,800. Fuel cost is reflected at an estimated purchase price
of $3.35 per gallon for unleaded fuel and $3.40 per gallon for diesel fuel.
FY 14 % Change
Proposed from
Resources for Budget Budget Prior Year
All Operating Departments $13,135,688 4.12%
274
Return to Table of Contents
City of Little Rock, Arkansas
Fleet Services
2013 Department Priorities Status
Establish and maintain a Fleet Replacement fund. Ongoing
Locate, acquire or have written a database for vehicle and
equipment insurance files; research and implement plans
to reduce the City's expenses for vehicle and equipment
insurance coverage. Ongoing
Open a new fueling station at 501 Ferry Street, with
diesel, unleaded, compressed natural gas (CNG) and
electric charging capabilities; close the fueling site at the
Central Fire station. Ongoing
Fleet will find "Clean Air" grants for purchasing alternative
fuel vehicles, and vehicle retrofitting. Ongoing
Continue the development of a comprehensive Fleet
Services emergency preparedness plan that can be
incorporated into the City's emergency plan under the
auspices of the Emergency Management Office. Ongoing
Convert current late model pickup trucks to compressed
natural gas (CNG), and small engine lawn equipment to
propane power. Fleet will continue to acquire alternate
fueled vehicles, including factory ready electric and
compressed natural gas (CNG) vehicles while adding
electric charging stations on City owned properties. Ongoing
Provide continuing educational and testing opportunities
for all staff members to achieve Automotive Service
Excellence (ASE), Blue Seal, and Emergency Vehicle
Technician (EVT) shop certification status. Ongoing
Continue efforts to become industry certified through Fleet
Consulting Services (FCS, aka Fleet Sentinel) and
Government Fleet Management Alliance (GFMA). Ongoing
Fleet applied for and received recognition as a "100 Best
Fleet of North America" through that program. Completed
A
pply for and receive recognition as a "Government Green
Fleet" through that program. Ongoing
Increase City wide vehicle/equipment utilization and
equipment reassignment to become more productive. Ongoing
Fleet finished the 2013 replacement and capital projects. Completed
Initiated a process for filing labor claims against vendors
who supplied defective parts to recapture lost productivity
time; charging the source vendor to compensate the City
of Little Rock for time that was duplicated due to their
defective part supplied. Completed
275
Return to Table of Contents
City of Little Rock, Arkansas
Fleet Services
2014 Department Goals
Open a new fueling station at 501 Ferry Street, with diesel, unleaded,
compressed natural gas (CNG) and electric charging capabilities; close the
fueling site at the Central Fire station.
Develop and implement a fleet unit pool program.
Continue efforts to establish and maintain a Fleet Replacement fund and
investigate creative financing options.
Convert 20% of late model pick-up trucks to compressed natural gas (CNG)
and convert small engine lawn equipment to propane power.
Continue to acquire alternatively fueled vehicles, including factory ready electric
and compressed natural gas (CNG) vehicles.
Continue efforts to become industry certified through Fleet Consulting Services
(FCS, aka Fleet Sentinel) and Government Fleet Management Alliance
(GFMA).
Begin using an automated scanning system to receive, issue and/or transfer
parts in FASTER fleet management software.
Assist in locating and applying for Clean Air grants for purchasing alternatively
fueled vehicles, vehicle retrofitting, etc.
Investigate the feasibility of upgrading to a web-based fleet management
software system, which would enable Automotive Technicians to order parts
without leaving the work station.
Conduct, execute and complete the annual Nation Fire Protection Association
(NFPA) inspections of all Fire Department apparatus.
Provide staff the opportunity to attend Emergency Vehicle Technician (EVT),
Automotive Service Excellence (ASE) and Compressed Natural Gas (CNG)
training classes; to achieve Automotive Service Excellence (ASE) and Blue
Seal shop certification status.
276
Return to Table of Contents
City of Little Rock, Arkansas
Fleet Services
Department: Fleet Services
Funding Source: Fleet Services Internal Service Fund
Budget: $13,135,688
Department Description:
To provide quality and cost efficient vehicles and work equipment, fuel and other fleet support
services to our customers in a timely, environmentally friendly atmosphere.
2012 2013 2014
Actual
Budget Budget
Objective: To complete 95% of fleet unit preventative maintenance before or on the due
date, as per Fleet Sentinel standards.
Demand: Preventative work orders scheduled. 1,774 2,045 2,048
Workload: Preventative work orders opened and
closed.
1,442 1,676 1,950
Efficiency: Preventative work orders closed on or
before due date. 1,154 1,341 1,560
Effect/Outcome: Percentage of work orders
closed on or before due date vs. total scheduled
work orders. 65% 66% 76%
Objective: To increase the number of direct shop hours to 85% of total shop hours.
Demand: Total number of shop hours. 69,071.30 73,089.63 75,000
Workload: Shop hours categorized as direct shop
hours. 54,313.77 57,879.73 63,750
Efficiency: Average direct shop hours per month. 4,526.1 4,823.3 5,312.5
Effect/Outcome: Percentage of direct shop hours
/total available shop hours. 79% 79% 85%
The departmental goals and objectives link with the
Board of Directors Statement of Management Policy for Basic City
Services and Infrastructure.
277
Return to Table of Contents
This page left blank intentionally.
278
Return to Table of Contents
City of Little Rock, Arkansas
Vehicle Storage Facility
Vehicle Storage Facility
Mission Statement
To provide support to City law enforcement entities by
providing safe storage for vehicles until they are reclaimed by
the registered owner(s) and disposal of unclaimed and
abandoned vehicles through public auction as required by
law.
Director of
Fleet Services
Vehicle Storage
Facility Manager
Storage
Operations
Auction
Operations
Transportation
Code
Enforcement
279
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Vehicle Storage Facility
$0
$225,000
$450,000
$675,000
$900,000
2012
2013
2014
DepreciationRepairs and
Maintenance
ContractualSupplies and
Materials
Personnel
Total Allocations By Fiscal Year And Account Category
Expenditure Budget
2012 2013 2014
Description
Actual
Expenditures
Adopted
Budget
Adopted
Budget
Salaries and Employee Benefits $610,454 $635,000 $656,232
Supplies and Materials 48,207 47,691 47,750
Contractual 583,190 563,610 562,980
Repairs and Maintenance 21,586 21,476 28,188
Depreciation 21,509 25,480 26,000
Total $1,284,946 $1,293,257 $1,321,150
Staffing 15 15 15
FY 14 % Change
Proposed from
Resources for Budget Budget Prior Year
601 Vehicle Storage Facility Fund $1,321,150 2.16%
280
Return to Table of Contents
City of Little Rock, Arkansas
Vehicle Storage Facility
2013 Department Priorities Status
Amended the Transportation Code for taxicab driver
permit applicants with a felony conviction background. Completed
Conduct taxi driver training in partnership with Little Rock
Convention and Visitors Bureau (LRCVB). Not Completed
Staff attended the International Association for
Transportation Regulators (IATR) conference. Completed
Provide leadership and management training to
supervisors. Ongoing
Provide customer service training to staff. Ongoing
Collaborate with the Little Rock Police Department
(LRPD) to build a new crime scene bay and use existing
space to open a store for selling miscellaneous items. Ongoing
281
Return to Table of Contents
City of Little Rock, Arkansas
Vehicle Storage Facility
2014 Department Goals
Collaborate with Little Rock Convention and Visitors Bureau to provide
customer service training to taxi-cab drivers.
Install a generator for the facility; in the event of a power outage.
Collaborate with Little Rock Police Department in relocating the crime scene
bay from it's current location to an area located on the Vehicle Storage lot
where vehicles are stored.
282
Return to Table of Contents
City of Little Rock, Arkansas
Vehicle Storage Facility
Department: Vehicle Storage Facility
Funding Source: Vehicle Storage Enterprise Fund
Budget: $1,321,150
Department Description:
Provide entities safe storage for vehicles until they are reclaimed by the registered owner(s) and
disposal of unclaimed and abandoned vehicles.
2012 2013 2014
Actual
Budget Budget
Objective: To release 100% of eligible vehicles within 60 days of impoundment.
Demand: Impounded vehicles 2,329 3,100 2,400
Workload: Impounded vehicles eligible for release 2,279 3,050 2,350
Efficiency: Eligible vehicles released within 60
days. 2,279 3,050 2,350
Effect/Outcome: Percentage of eligible vehicles
released within 60 days.
98% 98% 98%
The departmental goals and objectives link with the
Board of Directors Statement of Management Policy for Basic City
Services and Infrastructure.
283
Return to Table of Contents
This page left blank intentionally.
284
Return to Table of Contents
City of Little Rock, Arkansas
Waste Disposal
Waste Disposal
Mission Statement
To enhance citywide aesthetics and improve the quality of life
of our citizens by providing solid waste collection, recycling,
composting, and disposal.
Director of
Public Works
Assistant Director of
Public Works
Solid Waste Manager
Administration
Solid Waste
Waste Management
Waste Collections
Waste Disposal
Waste Composting
285
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Waste Disposal
Expenditure Budget
2012 2013 2014
Description
Actual
Expenditures
Adopted
Budget
Adopted
Budget
Salaries and Employee Benefits $4,808,225 $4,910,913 $5,338,107
Supplies and Materials 1,498,199 1,666,100 1,666,100
Contractual 2,854,307 3,389,223 3,422,715
Repairs and Maintenance 2,682,231 2,848,080 3,137,296
Closure/Post Closure 227,072 247,945 247,945
Depreciation 2,231,970 2,913,355 2,060,000
Debt Service 383,037 334,600 218,900
Transfers Out 1,889,705 1,378,254 1,564,863
Total $16,574,746 $17,688,470 $17,655,926
Staffing 112 113 113
$0
$1,500,000
$3,000,000
$4,500,000
$6,000,000
2012
2013
2014
Transfers
Out
Debt ServiceDepreciationClosure/Post
Closure
Repairs and
Maintenance
ContractualSupplies and
Materials
Personnel
Total Allocations By Fiscal Year And Account Category
The increase in personnel cost reflects salary and benefit cost increases for
non-uniform employees. The increase in repairs and maintenance expenses
reflects maintenance for aging vehicles and equipment. The decrease in
depreciation is associated with utilization of equipment that has been fully
de
p
reciated.
FY 14 % Change
Proposed from
Resources for Budget Budget Prior Year
603 Waste Disposal Fund $17,655,926 -0.18%
286
Return to Table of Contents
City of Little Rock, Arkansas
Waste Disposal
2013 Department Priorities Status
Implement a bulky item collection program with the town
of Cammack Village. Explanation - City of Little Rock
Board of Directors elected to not enter into an
agreement.
Other
(Please Explain)
Design and construct the next cell in the Class 1 Landfill. Ongoing
Design and construct the next cell in the Class 4 Landfill. Ongoing
287
Return to Table of Contents
City of Little Rock, Arkansas
Waste Disposal
2014 Department Goals
Increase permitted tonnage on compost facility.
Receive additional tonnage from North Little Rock through their bulky item
collection program.
Finish construction and begin utilizing the new cell in Class 1 Landfill.
Finish construction and begin utilizing the new cell in Class 4 Landfill.
288
Return to Table of Contents
City of Little Rock, Arkansas
Waste Disposal
The departmental goals and objectives link with the
Board of Directors Statement of Management Policy for Basic City
Services and Quality of Life.
Department: Waste Disposal
Funding Source: Waste Fund
Budget: $17,655,926
Department Description:
To provide all elements of effective efficient solid waste management in a manner that meets
Environmental Protection Agency (EPA) and state regulations, protects health, improves the
t
environment, and provides cleaner neighborhoods to support a high quality of life for all citizens.
2012 2013 2014
Actual
Budget Budget
Objective: To promote recycling and increase annual tonnage collected.
Demand: Curbside recycling tonnage to be
collected 8,250 10,800 10,000
Workload: Curbside recycling tonnage collected. 8,250 10,800 10,000
Efficiency: Curbside recycling tonnage
collected/month. 687 900 834
Effect/Outcome: Percentage of tonnage collected
annually. 100% 100% 100%
Objective: To monitor incoming tonnage to the Class I and Class IV Landfill Cells.
Demand: Class 1 & Class 4 tonnage to be
disposed. 102,500 104,000 130,000
Workload: Class 1 & Class 4 tonnage received. 102,500 104,000 130,000
Efficiency: Average monthly tonnage disposed
of in Class 1 and Class 4 landfills. 8,541 8,666 10,833
Effect/Outcome: Percentage of tonnage
collected annually. 100% 100% 100%
289
Return to Table of Contents
This page left blank intentionally.
290
Return to Table of Contents
Appendix
City of Little Rock, Arkansas 2014 Operating Budget
State and City Budget Statutes
State Statutes
Arkansas statutory law grants the City of Little Rock the authority to operate
under the City Manager form of government pursuant to the City’s form of
government.
1. The Mayor and City Manager shall prepare the municipal budget annually
and submit it to the Board for its approval or disapproval. The City
Manager is responsible for its administration after adoption.
2. The City Manager shall prepare and submit to the Board, within sixty (60)
days after the end of each fiscal year, a complete report on the finances
and administrative activities of the City during the fiscal year.
3. The City Manager shall keep the Mayor and Board advised of the financial
condition and future needs of the City and make such recommendations
as to him may seem desirable.
The City complies with item 1 above in its budget process. It complies with items
2 and 3 by submitting monthly, quarterly, and annual financial reports to the
Board.
City Ordinances
Sections 2-211 through 2-218, of the Code of Ordinances establish budget
requirements for preparation, administration and financial reporting. Sections 2-
222 and 2-226 also pertain to the budget.
Sec. 2-211. Nature and Scope.
The budget for the city shall set forth all proposed expenditures for the
administration, operation, maintenance and improvement of all offices and
departments and expenditures for capital projects to be undertaken and/or
executed during the year. In addition thereto, the budget shall set forth the
anticipated revenues and other means of financing proposed expenditures for the
fiscal year. The budget shall be adopted for the ensuing fiscal year period, while
information for subsequent fiscal periods shall be considered a fiscal plan.
Sec. 2-212. Preparation.
The City Manager shall submit to the Board of Directors a budget and an
explanatory budget message for the ensuing year. The City Manager shall
compile the budget with the assistance of the Finance Department and other
291
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
departments or agencies, estimating all revenues and expenditures detailed by
organization unit, service program, or object or expenditure, as appropriate.
Sec. 2-213. Public records; distributing copies.
The budget and budget message and all supporting schedules shall be a public
record in the office of the City Clerk open to public inspection by anyone. The
City Manager shall cause sufficient copies of the budget and budget message to
be prepared for distribution to interested persons.
Sec. 2-214. Adoption. *
On or before December 30 of each year the Mayor and Board of Directors shall
adopt a budget for the ensuing year.
Sec. 2-214. Budget document – Generally.
The budget document, setting forth the financial plan of the city for the ensuing
fiscal period, shall include the following:
(1) Any explanatory budget message;
(2) A summary of the budget by fiscal year;
(3) A detail of the revenue projections upon which the budget is based; and
(4) The detailed budget plan.
Sec. 2-216. Budget message.
(a) The budget message submitted by the City Manager to the Mayor and
Board of Directors shall be explanatory of the budget, shall contain an
outline of the proposed financial policies of the city for the budget year and
shall describe in connection therewith the important features of the budget
plan. It shall set forth the reasons for salient changes from the previous
year in cost and revenue items and shall explain any major changes in
financial policy.
(b) Attached to the budget message shall be such supporting schedules,
exhibits and other explanatory material in respect to both current
operations and capital improvements, as the City Manager shall believe
useful to the Mayor and Board of Directors.
* Little Rock, Arkansas, Code of Ordinances
292
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Sec. 2-217. Summary.
At the head of the budget, there shall appear a summary of the budget, which
need not be itemized further than by principal sources of anticipated revenue and
total proposed expenditures of each department, in such a manner as to present
to taxpayers a simple and clear summary of the estimates of the budget.
Sec. 2-218. Complete budget plan.
The budget shall provide a complete plan for the operation of all City
Departments and offices for the ensuing budget year. It shall contain in tabular
form:
Detailed estimates of all anticipated revenues.
All proposed expenditures.
Sec. 2-222. Emergency appropriations.
At any time in any budget year, the Mayor and Board of Directors may make
emergency appropriations to meet a pressing public need.
Sec. 2-248 – 2-251. Financial reporting.
Fund balance reports shall be prepared and submitted to the Mayor and Board of
Directors by the City Manager and Director of Finance within 20 business days
after month end close. A quarterly fund report will also be prepared and widely
distributed. Semi annual reports will be prepared published in the newspaper and
made available to the public within 30 calendar days after the month end close
for June and December of each fiscal year.
Sec. 2-258 – 260.1. Restricted reserve fund.
Restricted reserve fund means a portion of the governmental fund type’s net
assets that are accounted for in a restricted fund balance that is not available for
appropriation without special actions of the Mayor and Board of Directors. This
fund shall be considered to be fully funded as a part of the annual City budget
when the restricted fund balance shows an amount equal to $10,000,000, or 10%
of the annual General Fund revenues for a budgeted year, whichever is greater.
Revenues shall be deposited in this fund in such amounts determined by the
Mayor and Board of Directors to assure that the fund shall be fully funded by
December 31, 2005.
293
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Sec. 2-260.2. Notice of downward economic trends.
The City Manager and Director of Finance shall notify the Mayor and Board of
Directors in writing at the first available opportunity if economic trends indicate
that the revenues projected as a part of the annual City budget are not meeting
projections and require the Board to consider reduction in force, city services or
the use of restricted reserve fund monies to meet the City’s obligations funded in
the annual City budget.
294
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
STATISTICAL INFORMATION
Date of Incorporation November 7, 1831
Date of Adoption of Charter November 2, 1835
Form of Government City Manager
Date of City Manager Government July 27, 1993
Area - Square Miles 122.36
Miles of Streets and Alley:
Total Streets 2,461.12
Streets Graded and Surface Treatment 421.92
Paved - Permanent (Concrete and Asphalt) 2,039.20
Alleys Maintained 62.96
Drainage Ditches Maintained 1,578.55
Storm Sewers Maintained 360.69
Miles of Water Lines 1,389.5
Sanitary Miles 1,365
Traffic Controls:
Signals Malfunctions 2,568
Solid Waste/Garbage Collection:
Class I and IV tonnage 131,773
Curbside/Drop-off recycling 41,427
Yard Waste 47,881
On-call Service 26,649
Building Permits:
Year
Permits Issued Estimated Cost
2004 5,032 475,269,768$
2005 5,330 620,819,782$
2006 4,694 531,752,025$
2007 2,734 614,588,257$
2008 1,957 433,788,975$
2009 3,690 394,776,760$
2010 2,832 343,976,010$
2011 3,304 356,450,894$
2012 2,011 391,789,405$
2013 2,000 385,865,486$
295
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
819
1154
1897
1276
825
1271
640
647
551
1350
670
618
0
200
400
600
800
1000
1200
1400
1600
1800
2000
2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
Number of Permits
Years
City of Little Rock
Housing Unit Permits
2001 - 2013
Single-Family Multi-Family Total
Pulaski Heights/ Northwest West LR W. Pulaski/ SW LR Little Rock
Overall Hillcrest Little Rock Maumelle North Far W LR South Downtown
2013 $191,423 $303,664 $239,918 $224,313 $184,669 $390,111 $53,600 $171,802
2012 $187,078 $282,953 $245,866 $217,908 $189,924 $379,035 $67,868 $161,603
2011 $172,195 $305,893 $243,774 $211,311 $187,157 $377,467 $60,771 $142,711
2010 $175,794 $289,156 $230,183 $204,687 $183,438 $401,310 $69,816 $132,243
2009 $172,051 $259,219 $231,557 $206,126 $174,101 $372,225 $72,202 $163,358
2008 $174,018 $274,978 $236,749 $211,212 $189,401 $443,600 $83,413 $108,183
2007 $174,742 $283,178 $243,150 $208,178 $184,178 $403,413 $89,522 $236,286
2006 $172,907 $256,815 $240,033 $212,078 $176,725 $398,395 $82,000 $114,990
2005 $169,000 $288,489 $225,499 $209,970 $175,104 $397,294 $72,396
2004 $154,805 $223,637 $211,786 $190,552 $162,870 $370,972 $67,065
2003 $142,278 $196,602 $189,760 $180,773 $151,508 $317,548 $66,669
Chg 12-1
3
$4,345 $20,711 -$5,948 $6,405 -$5,255 $11,076 -$14,268 $10,199
2.5% 7.2% -2.6% 3.1% -2.9% 2.8% -20.4% 7.7%
Chg 03-1
3
34.5% 54.5% 26.4% 24.1% 21.9% 22.9% -19.6%
All prices represent average sales price.
Compiled by
Metroplan
Central Arkansas Real Estate Values
296
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Sales Tax Rate:
Local 1.5%
County 1.0%
State 6.0%
Bond Rating:
General Obligation Bonds
Standard and Poor’s AA
Moody’s Aa2
Fire Protection:
Number of Stations 21
Number of Uniformed Employees 415
Number of Calls 27,042
Insurance Rating for Insurance Service Office (ISO)
City of Little Rock Class II
Police Protection:
Number of Stations 7
Number of Uniformed Employees 574
Calls for Service 158,635
Recreation:
Number of Parks, Including Park Development 59
Total Acres (developed & undeveloped) 6,319
Number of Playgrounds 46
Number of Tennis Courts 48
Number of Basketball Courts 37
Number of Museums 1
Number of Golf Courses 3
Number of Ball Fields 25
Number of Play Fields 20
Number of Community Centers 5
Number of Swimming Pools 3
Number of Adult Centers 1
Number of Soccer Fields 9
Number of Fitness Centers 1
River Market 1
Riverfest Amphitheatre 1
Total Recorded Park Attendance - 2013 617,537
Number of Zoos 1
Total Zoo Attendance – 2013 313,762
Total Zoo Outreach Program 37,018
297
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Medical Facilities Number of beds
(private occupancy rooms):
Arkansas Children’s 370
Arkansas Heart Hospital 112
Baptist – Little Rock 827
Baptist Rehabilitation Institute 120
Baptist Health Extended Care 37
Select Specialty Hospital 43
St. Vincent Infirmary Medical Center 615
University of Arkansas Medical Center 436
Veteran Health Care System 195
Total Number of Beds 2,755
Year Number
1910 45,941
1920 65,142
1930 81,657
1940 88,039
1950 102,310
1960 107,813
1962 Special Census 125,671
1964 Special Census 128,929
1970 Census 144,824
1974 Special Census 139,703
1978 Special Census 144,824
1980 Census 159,024
1985 Special Census 178,134
1990 Census 175,795
1992 U.S. Census Bureau Estimate 176,870
2000 Census 183,133
2010 Census 193,524
2011 Special Census* 195,310
2012 Special Census** 194,439
2013 Special Census** 196,814
* Source: American Community Survey
** Source: Metroplan
POPULATION
298
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Age
Ranges Male Female
Under 5 6,254 6,906
5 to 9 5,688 6,281
10 to 14 4,795 5,295
15 to 19 6,370 7,033
20 to 24 7,845 8,662
25 to 34 13,941 15,393
35 to 44 12,771 14,101
45 to 54 12,191 13,462
55 to 59 6,031 6,660
60 to 64 5,785 6,387
65 to 74 6,483 7,158
75 to 84 3,461 3,822
85 + 1,920 2,119
City of Little Rock 2012 Population By Age and Sex
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
18,000
Population
Age Ranges
City of Little Rock 2012 Census By Age And Sex
Age
Male
Gender:
Male 47.5%
Female 52.5%
299
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
LITTLE ROCK AND ENVIRONS
Per Capita Income (2012) $28,152
Median household income (2012) $45,951
U.S. Consumer Price Index (November 2012) 235
Percent inflation over past year (December 2012) 1.5%
Average unemployment percentage rate (Nov. 2010 – Nov. 2011) 6.7%
Median Age (2012 special census) 36.6%
Race (2012):
White 49.4%
Black or African American 44.1%
American Indian and Alaska Native 0.1%
Asian/Pacific 3.1%
Other* 3.3%
*Hispanic is an overlay category that includes multiples races.
Source: Metroplan
5.5%
5.1%
4.6%
4.6%
5.8%
9.3%
9.6%
8.9%
8.1%
7.4%
5.3%
4.9%
5.1%
4.9%
4.8%
6.5%
7.4%
7.2%
6.8%
6.7%
0.0%
2.0%
4.0%
6.0%
8.0%
10.0%
12.0%
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
Percentage
Years
Little Rock and United States
Unemployment Rate
2004 - 2013
United States Little Rock
300
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Education (Little Rock School District):
Number of School Buildings 48
Number of Teachers/including Principals, Supervisors 2,206
Number of Registered Students 25,149
Number of Kindergarten Students 2,220
Average Daily Attendance - Elementary Schools 10,074
Average Daily Attendance - High/ Middle Schools 10,498
Average Daily Attendance - Special Schools 321
Average Daily Attendance - Kindergarten 2,029
Tax Rate: (Mills)
Real 46.4
Personal 46.4
PULASKI COUNTY STATISTICS
Population 25 years and over 131,125
Percent of Population Age 25+ 67%
Education level in years of formal schooling:
High School or Equivalent 24.4%
Some college, no degree 21.3%
Bachelor’s degree 23.3%
MA/Professional degree or higher 15.8%
Institution Fall 2010 Fall 2012
University of Arkansas at Little Rock 13,176 12,872
University of Arkansas for Medical Sciences 2,836 2,809
Philander-Smith College 696 667
Arkansas Baptist College 1,121 1,082
Webster University 435 311
Totals 18,264 17,741
* Sources: Arkansas Business Book of Lists 2013, 20th Edition
Enrollment
LITTLE ROCK INSTITUTIONS OF HIGER EDUCATION
2010-2012
301
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
City Government Total Full-Time Part-Time
AFSCME 392 392
IAFF 415 415
FOP 577 577
Non-union 1,186 726 460
2,570 2,110 460
Commissions
Wastewater Utility 206 205 1
Bill & Hillary Clinton National Airport 160 154 6
LR Convention & Visitors Bureau 205 121 84
Port Authority 8 8
Metropolitan Emergency Medical Services 348 285 63
Central Arkansas Transit Authority 201 200 1
Arkansas Museum of Discovery 36 24 12
Arkansas Arts Center 86 43 43
Central Arkansas Library 254 203 51
1,504 1,243 261
Total Employment 4,074 3,353 721
EMPLOYEES AS OF DECEMBER 31, 2013
Rank Employer Product/Service Employees
1 State Government (MSA) Government 32,200
2 Local Government (MSA) Government 28,800
3 Federal Government (MSA) Government 9,200
4 University of Arkansas for Medical Sciences Education/Medical Services 8,500
5 Baptist Health Medical Services 7,000
6 Little Rock Air Force Base Government 4,500
7 Acxiom Data Processing 4,388
8 Little Rock School District Schools/Colleges/Education 3,511
9 Central Arkansas Veterans HealthCare System Medical Services 3,500
10 Entergy Arkansas Utility (Electric) 2,738
11 Pulaski County Special School District Schools/Colleges/Education 2,700
12 AT&T Utility (Telephone) 2,613
13 St. Vincent Health System Medical Services 2,600
14 Arkansas Children's Hospital Medical Services 2,470
15 Dillard's Department Store 2,400
Source: Greater Little Rock Chamber of Commerce,
Compiled by
site accessed 2/10/2014 Metroplan
2/10/2014
Little Rock Area Major Employers
2013
302
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
City of Little Rock, Arkansas
Principal Sales Tax Payers
December 31, 2013
The City of Little Rock, Arkansas’s largest own-source revenue is sales tax.
Sales tax revenues consist of a local 1.5% tax, with 1.125% dedicated to ongoing
operations and the remaining 0.375% dedicated to capital projects. The capital
portion of the tax is a temporary tax that will sunset on December 31, 2021. In
2013, the combined 1.5% local sales tax generated revenue of $70,164,473. In
addition, the City receives a share of the county’s 1% tax based on population.
The State is required to keep the identity of individual taxpayers confidential
pursuant to Arkansas State Statutes. Therefore, the City of Little Rock is unable
to identify the top ten (10) taxpayers. However; Little Rock enjoys a diverse
economic sales tax base.
Little Rock Top Ten 1 1/2 Cent Sales Taxpayers Tax
Industry Collected % of Total
All Other General Merchandise 6,658,608 9.49%
Full Service Restaurants 5,486,862 7.82%
Grocery Stores 4,273,016 6.09%
Electric Power Generation, Transmission and Distribution 3,515,240 5.01%
Building Materials and Supplies Dealers 2,722,382 3.88%
Electronics and Appliance Stores 2,708,349 3.86%
Clothing Stores 2,645,201 3.77%
Sporting Goods, Hobby, and Musical Instrument Stores 2,575,036 3.67%
Electrical Goods Wholesalers 2,168,082 3.09%
Department Stores 2,083,885 2.97%
Totals 32,752,776 49.65%
Little Rock Top Ten 1 Cent County Sales Taxpayers Tax
Industry Collected % of Total
All Other General Merchandise 4,569,995 11.60%
Full Service Restaurants 3,011,254 7.65%
Grocery Stores 2,286,041 5.80%
Electric Power Generation, Transmission and Distribution 1,987,795 5.05%
Building Materials and Supplies Dealers 1,726,889 4.38%
Electronics and Appliance Stores 1,435,615 3.64%
Sporting Goods, Hobby, and Musical Instrument Stores 1,357,587 3.45%
Telecommunications 1,330,370 3.38%
Clothing Stores 1,227,252 3.12%
Department Stores 1,129,570 2.87%
Totals 20,062,368 50.94%
303
Return to Table of Contents
This page left blank intentionally.
304
Return to Table of Contents
Glossary
City of Little Rock, Arkansas 2014 Operating Budget
GLOSSARY OF KEY BUDGET TERMS
Accrual Basis of Accounting - A basis of accounting that recognizes the
financial effect of transactions, events, and interfund activities when they occur,
regardless of the timing of related cash flow.
Agency - A division of City government commonly referred to as a City
department. Examples are Police, Fire, Parks and Recreation, and Public Works
departments. The term "other agencies" is used to identify entities outside of but
related to City operations. These include the County Health Department, Library,
Arts Center, Museum, and others.
Amusement Park Lease - Share of revenue from train rides at Civitan House at
the Little Rock Zoo.
Appropriation - An amount of money authorized by the Board of Directors to incur
obligations and to make expenditures/expenses of resources.
Assessed Valuation of Property - The taxable value of real and personal
property in Little Rock, established at 20 percent of market value by the Pulaski
County Assessor.
Board of Directors - The eleven elected Board members who form the City's
governing body.
Bonds - Certificates of indebtedness issued by an entity which guarantee payment
of principal and interest at a future date.
Basic Budget - An annual financial plan that identifies revenue sources and
amounts, services to be provided, and amounts of money appropriated to fund
these services.
Budget Amendment – Legal means by which an adopted estimated revenue or
expenditure authorization limit is increased or decreased.
Budget: Operating - A financial document designed to provide funding for
operating or "ongoing" annual programs of service.
Budget: Capital - A financial plan for the purchase or construction of major assets
such as buildings, land, streets, sewers, and recreation facilities.
Capital Assets – Assets of long-term character that are intended to continue to be
held or used, such as land, buildings, machinery, furniture, and other equipment.
Capital assets may also be referred to as fixed assets.
305
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Capital Equipment - Generally, equipment with a value greater than $5,000 and
an expected life of more than one year.
Capital Outlay - The portion of the annual operating budget that appropriates
funds for the purchase of long-lived items often separated from regular operating
items such as personal, supplies and maintenance and contractual. The capital
budget includes funds for purchases such as furniture, vehicles, machinery,
building improvements, data processing equipment and special tools, which are
usually distinguished from operating items according to their value and projected
useful life.
Commission - A unit of city government authorized under State statutes to
provide a municipal service without control by the City elected governing body.
For example, the Housing Commission.
Contingency Reserve - A budgetary reserve set-aside for emergencies or
unforeseen expenditures, not otherwise included in the basic budget.
Contractual Services - Goods and services acquired under contract that the city
receives from an outside company. Professional services, utilities, rentals, and
insurance are examples of contractual services.
Debt Service - Expenditures for principal and interest on outstanding bond issues.
Depreciation - An accounting allocation of a portion of the cost of an asset to the
operating expenditures of the current fiscal period, that is designed to indicate the
funds that will be required to replace the asset when it is no longer serviceable.
Discrete Component Unit - A separate fund that is ultimately dependent upon the
City Board of Directors for oversight or approval of its operations.
Encumbrance - An amount of money committed for payment of a specific good or
service not yet received. Funds so committed cannot be used for another
purpose.
Enterprise Fund - A self-contained fund operated to account for services
supported by user charges and fees. Examples are the Golf, Zoo and Waste
Disposal funds.
Expenditures - Decreases in net financial resources under the current financial
resources measurement focus, and pertains to payment of normal operating
costs and encumbrances. Expenditures are measured according to
governmental accounting rules.
Expenses - The cost of doing business in a proprietary organization, and can be
either direct outflows or the using up of an asset such as the depreciation of
capital assets.
306
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Fiduciary Fund - A separate fund utilized to account for the pension obligations to
a specific group of City employees. A Board of Trustees that exercises a fiduciary
responsibility for the fund governs each fund.
Fiscal Year - A period of twelve (12) consecutive months designated as the
budget year. Little Rock's fiscal year is the calendar year.
Fleet Services - A management organization accounted for as an internal service
fund and responsible for acquiring and maintaining the City's vehicle fleet.
FUTURE-Little Rock - A community goal setting process utilized to assess the
City's problems and needs and deliver recommended solutions to the Board of
Directors. The process which involved hundreds of citizens over an eighteen-
month period resulted in the City’s half cent local sales tax.
Fund - A fiscal entity composed of a group of revenue and expenditure accounts
maintained to account for a specific purpose. See the section "Little Rock's
Financial Structure" for a description of the funds controlled by the Board of
Directors, various Commissions, and by Pension Trustees.
Fund Balance - The balance in a fund remaining from all revenues, expenditures
and carryover funds that is subject to future appropriation.
Gain/Loss Sale of Fixed Assets – The amount of proceeds from the sale or
disposal of an asset after deduction of the cost of the asset net of depreciation.
General and Administrative Cost - Cost associated with the administration of
general City Services.
General Obligation Bonds - Bonds secured by the full faith and credit of the City.
Generally Accepted Accounting Principles (GAAP) – A widely accepted set of
rules, conventions, standards, and procedures for reporting financial information,
as established by the Financial Accounting Standards Board.
Government Fund Type - Funds generally used to account for tax-supported
activities. There are five different types of government funds: The General Fund;
Special Revenue Funds; Debt Service Funds; Capital Project Funds; and Trust
Funds.
Grant - Contribution by one government unit or funding source to another unit.
The contribution is usually made to aid in a part of a specified function, but is
sometimes available for general purposes.
Grant Match - City funds, private funds, or in-kind services required to be
contributed or raised by the receiving entity for the purpose of matching funds
obtained from Federal and State grant programs.
307
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Industrial Development Revenue Bonds - Bonds issued by the City to finance
construction or expansion of an industrial facility. The City is in no way obligated
to repay these bonds; rather they are the sole obligation of the industry that
benefits from the financing.
Infrastructure – Infrastructure includes the basic public works of a city, such as
roads, bridges, sewer and water systems, drainage systems, and essential public
utilities.
Internal Service Fund - This fund operates like an Enterprise Fund to account for
citywide vehicle and maintenance costs and the revenue from charge-backs to
user departments. It provides a mechanism for identifying vehicle costs and
charging them to the property budget program.
Investment - Securities purchased and held for the production of revenues in the
form of interest.
Lapsing Appropriation – An appropriation made for a certain period of time,
generally for the budget year. At the end of the specified period, any unexpected
or unencumbered balance lapses or ends, unless otherwise provided by law. Most
operating funds are lapsing funds.
Maintenance - Maintenance encompasses a variety of materials and services for
land and equipment of a permanent or semi-permanent nature or for software for
the renewal, replacement, repair, minor renovation, and other cost associated
with keeping an asset in proper condition or working order.
Millage - The tax rate(s) levied on real and personal property. One mill equals $1
per $1,000 of assessed property value.
Modified Accrual Basis of Accounting - A basis of Accounting according to
which (1) revenues are recognized in the accounting period in which they
become available and measurable and (2) expenditures are recognized in the
accounting period in which the fund liability is incurred, if measurable, except for
un-matured interest on general long-term debt and certain similar accrued
obligations, which should be recognized when due.
Net Position – The residual of all other elements presented in a statement of
financial position. The term incorporates deferred outflows of resources and
deferred inflows of resources as defined by GASB Statement No. 63 into the
definitions of the required components of the residual measure and by renaming
that measure as net position, rather than net assets.
Non-Lapsing Funds – A fund whose unencumbered appropriation balance
remains available for expenditure after the end of the fiscal year. A non-lapsing
fund remains open and available for use until all appropriations are expended,
308
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
transferred, or closed by budgetary action. Grants and Capital Funds normally
operate as non-lapsing funds.
Non-Operating Fund - A fund established to account for revenue and
expenditures that are not recurring and, therefore, not part of the annual operating
budget. Examples of these revenues are sales taxes set aside for special items,
and one-time revenue collections such as litigation settlements. Examples of
expenditures are those for special programs and projects, and for capital projects.
Non-Operating Income or Expense - A non-recurring, unusual type of revenue or
expense that would distort financial results if presented as an operating item.
These items are reflected below the operating income line on statements of
income and expense.
Operating Revenues – Regular and recurring sources of income for an entity.
Operating Expenses – Recurring costs required to provide a service or maintain
an operation.
Other Reimbursements – Usually nonrecurring funds received from another
entity. Amounts refunded for costs incurred or expenses paid.
Outside or Other Agency - These are local organizations that are not a part of
City government, but that receive appropriations from the City in exchange for
services provided to citizens. Examples are the Central Arkansas Transit
Authority, the County Health Department, and the Pulaski County Jail.
Program - A division or sub-unit of an agency budget, which identifies a specific
service activity to be performed. For example, a snow and ice removal program is
funded in the Public Works Street Maintenance Budget.
Proprietary Fund Type - Funds that focus on the determination of operating
income, changes in net assets – or cost recovery – financial position, and cash
flows. There are two different types of proprietary funds: Enterprise Funds and
Internal Service Funds.
Rating - Ratings are issued by several institutions as an indication of the likelihood
that an obligation will be repaid. The highest rating is triple A, which is awarded to
debt securities of the U. S. Government. Little Rock's general obligation bonds are
rated AA by two rating agencies, which indicate a high level of confidence in the
City's ability to repay its obligations.
Recycling - Share of proceeds from the sale of newspaper, metal, and glass
collected by a private company from sanitation routes.
309
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Redemption - The repayment of a bonded indebtedness. Redemption can occur
at a specified date, or can be subject to early retirement, should funds be available
to do so.
Reserve - The Board of Directors may set aside moneys into an account called a
reserve to provide for future needs or to meet unknown obligations. For example,
the City self-insures for workers' compensation claims and maintains a reserve to
meet any unforeseen future claims. The City also maintains a general working
capital reserve to meet unknown emergency needs.
Restricted Reserve - A specific amount of cash set aside by action of the Board
of Directors for funding unforeseen contingencies such as destruction from a
tornado, flooding, or litigation.
Retained Earnings - The excess of revenue or expenditures that has
accumulated since the inception of a Proprietary Fund.
Revenue(s) - Increases in the net current assets of a Governmental Fund Type
from other than expenditure refunds, general long-term debt proceeds and
operating transfers in.
Risk Management - A program to effectively deal with the varied risks faced by
the City. This includes protecting the public and City employees by providing
commercial or self-insurance coverage for fire, vehicle, and public official and other
liabilities, developing and maintaining safe driving programs, and maintaining a
safe working environment.
Salaries Wages and Employee Benefits - All costs associated with providing
personnel for an agency or program including salaries, wages, social security and
Medicare tax payments, retirement contributions, health, dental, life, disability,
unemployment insurance and Workers' Compensation coverage.
Special Project - Generally, a project funded for a specific purpose. Special
projects may be for capital improvements or other non-operating items, or for
specific programs such as Children, Youth, and Family initiatives.
State Tax Turnback - The State of Arkansas returns a portion of its tax receipts to
incorporated cities within the state. Certain turnback revenues may be used for
general purposes, while other turnback funds are restricted to street
improvements.
Sundries - Revenue received from miscellaneous sources.
Supplies - Supplies are articles that when consumed or used, show a material
change in their physical condition. These items generally last less than one year.
Examples of supplies are office supplies, clothing, cleaning and janitorial
supplies, petroleum products and chemicals, medical & laboratory expenses.
310
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
Transfers In - Reimbursements or allocations from other funds.
User Charges - The direct payment by the public for a specific service provided.
For example, a monthly charge for garbage pickup.
Undesignated Fund Balance - The amount of money remaining in a fund that
has not been appropriated or committed for any purpose.
Utility Franchise Fee - A City fee levied upon the gross receipts of local privately
owned utilities (power, gas, and telephone). Under State law, this fee may be
passed on to the utility user.
Vehicle Storage Fees - Charges for release from the impound lot of vehicles
that have been abandoned on the street, towed from illegal parking zones, or
seized after violation of vehicular laws.
311
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
GLOSSARY OF KEY ACRONYMS
ADA American Disability Act prohibits discrimination and ensures equal
opportunity for persons with disabilities in employment, State and local
government services, public accommodations, commercial facilities, and
transportation. It also mandates the establishment of TDD/telephone relay
services.
AFSCME – American Federation of State, County and Municipal Employees
Union
ARNRC – Arkansas Natural Resource Commission.
ARRA American Recovery and Reinvestment Act of 2009
AZA – Association of Zoos and Aquariums
CAFR – Comprehensive Annual Finance Report
CATA – Central Arkansas Transit Authority
CDBG – Community Development Block Grant representing federal block grants
used primarily for street improvements, community services and community
center operations.
CIP – Capital Improvement Program is a multi-year plan for capital expenditures
to replace and expand the City’s infrastructure, vehicles and equipment.
COBRA/Retiree – Omnibus Budget Reconciliation Act of 1985 is an insurance
premium reduction plan for retired employees.
COPS – Community Oriented Policing Services funded by a federal grant.
CYF – Children, Youth and Families promotes a comprehensive and holistic
approach that reaches out to families and children that are most at risk of losing
a safe, nurturing, self-determining, drug-free and violence-free environment. The
Program requires the full partnership of City and government agencies, local
educational agencies, public and private business community, and dedicated
organizations working directly in the neighborhoods.
DWI/DUI – Driving while intoxicated/Driving under the influence.
FEMA – Federal Emergency Management Administration
312
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
FCC Federal Communications Commission is an independent United States
government agency. The FCC was established by the Communications Act of
1934 and is charged with regulating interstate and international communications
by radio, television, wire, satellite and cable. The FCC's jurisdiction covers the 50
states, the District of Columbia, and U.S. possessions.
FULR – Future Little Rock initiatives paid from a half cent sales tax initiated in
1994.
FOP – Fraternal Order of Police Union
GAAP – Generally Accepted Accounting Principles are accounting rules used to
prepare, present, and report financial statements for a wide variety of entities,
including publicly traded and privately-held companies, non-profit organizations
and governments.
GASB Government Accounting Standards Board is currently the source of
generally accepted accounting principles used by State and Local governments
in the United States of America. It was established to improve standards of state
and local governmental accounting and financial reporting that will result in useful
information for users of financial reports and guide and educate the public,
including issuers, auditors, and users of those financial reports.
GFOA – Government Finance Officers Association promotes the professional
management of governments for the public benefit by identifying and developing
financial policies and best practices and promoting their use through education,
training, facilitation of member networking, and leadership.
IAFF International Association of Fire Fighters
HIPP – Home Investment Partnership Funds are expended to provide housing or
housing assistance to qualifying citizens, to improve neighborhood streets and
drainage and to operate community health and recreation facilities.
LR Cent Committee – Little Rock Citizens for Evaluation of New Tax is a
committee of citizens, which is made up of two (2) Co-Chairs, individuals from
each of the City’s seven (7) Wards, and three (3) At-Large Members. The LR
Cent Committee meets on a quarterly basis to evaluate the spending of the
additional revenue generated by the one (1)-cent sales tax increase approved by
voters in September 2011 that went into effect on January 1, 2012.
LUZA – Local Urban Projects is a program for land redevelopment in areas of
moderate to high density urban land use. Urban renewal may involve relocation
of businesses, the demolition of historic structures, the relocation of people, and
the use of eminent domain (government purchase of property for public use) as a
legal instrument to take private property for city-initiated development projects.
313
Return to Table of Contents
City of Little Rock, Arkansas 2014 Operating Budget
MBE – Minority Business Enterprise is an American term which is defined as a
business which is at least 51% owned (male and female), operated and
controlled on a daily basis by one or more (in combination) American citizens of
the following ethnic minority classifications: African American, Asian American
(includes West Asian Americans (India etc.) and East Asian Americans (Japan
Korea etc.), Hispanic American – not of the Iberian peninsula and Native
American including Aleuts.
NHSP – Neighborhood Housing Special Project Fund - Section 108 Guaranteed
Loan Program to provide housing and housing assistance to qualifying citizens
and to improve neighborhood infrastructure.
NUSA – Neighborhoods, USA is a national non-profit organization committed to
building and strengthening neighborhood organizations. Created in 1975 to share
information and experiences toward building stronger communities, NUSA now
continues to encourage networking and information sharing to facilitate the
development of partnerships between neighborhood organizations, government
and the private sector.
PIT – Prevention, Intervention and Treatment Programs actively promote
collaborations between public and private organizations, citizen groups, and
other community-based organizations with its youth-oriented programming.
Through a multi-faceted approach, PIT programs seek to reduce crime levels
over time while encouraging the potential of local youth. The wide range of PIT
programming encompasses services for education, health, safety, and
employment for young people.
RFP/RFQ – Request for Proposal is a method of bidding used when there are
subjective qualifications which must be met before you consider pricing. A RFP
gives the buyer a chance to evaluate subjective offerings such as the sellers
approach to a project, references, personnel assigned to the task and history
with similar projects. The City typically uses the Two-Step RFP Method in which
qualifications are submitted in one envelope and evaluated and pricing is
included in another envelope for comparison with those qualified. A RFQ –
Request for Qualifications is a bid where qualifications are all that is submitted
and price is determined by negotiation with the selected vendor.
STF – Short Term Financing accounts for proceeds issued to acquire capital
equipment, building improvements and vehicles for the City.
UALR – University of Arkansas at Little Rock
WBE – Women Business Enterprise – a classification of business enterprises
wherein at least 51% of the business is women owned.
314
Return to Table of Contents