- –BUILDING BY- LAW 2019 - CITY OF VANCOUVER
CITY OF VANCOUVER
SCHEDULE B - continued
__________________________
Project Address
__________________________
Discipline
_______
PLUMBING
4.1 Roof drainage systems
4.2 Site and foundation drainage systems
4.3 Plumbing systems and devices
4.4 Continuity of fire separations at plumbing penetrations
4.5 Functional testing of plumbing related fire emergency systems and devices
4.6 Maintenance manuals for plumbing systems
4.7 Structural capacity of plumbing components, including anchorage and seismic restraint
4.8 Review of all applicable shop drawings
4.9 Plumbing systems, Part 10 requirements (ASHRAE, NECB, ZEBP, etc)
4.10 Plumbing systems, testing, confirmation
_______
FIRE SUPPRESSION SYSTEMS
5.1 Suppression system classification for type of occupancy
5.2 Design coverage, including concealed or special areas
5.3 Compatibility and location of electrical supervision, ancillary alarm and control devices
5.4 Evaluation of the capacity of city (municipal) water supply versus system demands and domestic demand,
including pumping devices where necessary
5.5 Qualification of welder, quality of welds and material
5.6 Review of all applicable shop drawings
5.7 Acceptance testing for ‘‘Contractor’s Material and Test Certificate’’ as per NFPA Standards
5.8 Maintenance program and manual for suppression systems
5.9 Structural capacity of sprinkler components, including anchorage and seismic restraint
5.10 For partial systems — confirm sprinklers are installed in all areas where required
5.11 Fire Department connections and hydrant locations
5.12 Fire hose standpipes
5.13 Freeze protection measures for fire suppression systems
5.14 Functional testing of fire suppression systems and devices
_______ ELECTRICAL
6.1 Electrical systems and devices, including high building requirements where applicable
6.2 Continuity of fire separations at electrical penetrations
6.3 Functional testing of electrical related fire emergency systems and devices
6.4 Electrical systems and devices maintenance manuals
6.5 Structural capacity of electrical components, including anchorage and seismic restraint
6.6 Clearances from buildings of all electrical utility equipment
6.7 Fire protection of wiring for emergency systems
6.8 Review of all applicable shop drawings
6.9 Electrical systems, Part 10 requirements (ASHRAE, NECB, ZEBP, etc)
6.10 Electrical systems, testing, confirmation
6.11 Radio Antenna Systems
_______
GEOTECHNICAL — Temporary
7.1 Excavation
7.2 Shoring
7.3 Underpinning
7.4 Temporary construction dewatering
_______
GEOTECHNICAL — Permanent
8.1 Bearing capacity of the soil
8.2 Geotechnical aspects of deep foundations
8.3 Compaction of engineered fill
8.4 Structural considerations of soil, including slope stability and seismic loading
8.5 Backfill
8.6 Permanent dewatering
8.7 Permanent underpinning
__________________
CRP’s Initial
4 of
4
Building Permit No._______________
(for Building Official’s use)
Professional’s Seal and
Signature
Certified Professional’s
Stamp and Signature
(if applicable)