City of Jordan – Application for Design Review Permit Last Updated 8/27/2020 Page 2
• Preliminary architectural drawings including:
(a) Building elevation drawing with adjacent buildings illustrated
(b) Proposed building height and width
(c) Preliminary floor plan
(d) Building relating to proportion including an identifiable base, mid-section and roofline
(e) Window details (if changing), including their size, size of the original opening and
transparency of glass
(f) Façade materials and colors
(g) Roof style and cornice detail
(h) Roof top equipment, if applicable, and proposed screening
(i) Proposed overhangs, awnings or canopies and the proposed material and dimensions
(j) Egress stairs for upper level access and the building materials
(k) Other Architectural Detail Drawings as required by the Design Standards manual
• Landscape plan illustrating:
(a) Type, size and quantity of plants
(b) Lawn area
(c) Fences/walls and screening materials
Please Note:
An initial meeting with Planning Staff is required before being heard by the Planning Commission to ensure that
the proposed project complies with the development standards in the Zoning Code. All applications for design
review will be reviewed for consistency with applicable design guidelines.
I certify that all information submitted is true and correct.
Applicant Signature: ___________________________________________ Date: ____________________________
Owner’s Signature: ____________________________________________ Date: ____________________________
DATE SUBMITTED: _________ DATE COMPLETE: ___________ IF INCOMPLETE, DATE LETTER SENT TO APPLICANT:_______
FEE PAID: _________ DATE FEE PAID: ___________ FILE #_________
REVIEW BOARD ACTION:
PLANNING COMMISSION ACTION: _____ RECOMMEND APPROVAL _____ RECOMMEND DENIAL _______
DATE OF ACTION: ______________
DATE APPLICANT/PROPERTY OWNER NOTIFIED OF PLANNING COMMISSION ACTION: _________________
CITY COUNCIL ACTION: _____ APPROVED _____ DENIED
DATE OF ACTION: ______________
DATE APPLICANT/PROPERTY OWNER NOTIFIED OF REVIEW BOARD’S ACTION: _________________
DATE FILED IN ADDRESS FILE: __________________
click to sign
signature
click to edit
click to sign
signature
click to edit