Page 2 of 3
If yes, include an engineer or site technicians’ statement.
4. If #2 is yes, is the building already connected to municipal water or sewer Yes No
For development or PUD applications only, please answer the following questions:
5. For Water & Wastewater Main extensions, do you propose the connection
to be publicly or privately owned? Public ____ Private ____
6. If private, do you propose to maintain the infrastructure? Yes ____ No ____
NOTE: If you choose to maintain the water infrastructure, you will need to apply to the State Water Supply
Division for a permit to operate a public water system! If you choose to have the Town maintain the water
and or wastewater infrastructure, a permanent maintenance agreement will be required with the Town.
If the proposed project is not within a current service area as indicated in the Water and Wastewater Ordinances,
please answer the following:
7. Approximately how close is the nearest service area to the project location?
8. Do you intend to design and construct the necessary infrastructure? Yes No
If this request is for a project/building not yet existing, please answer the following:
9. Is DRB approval necessary? Yes No
If no, please provide a statement from the Planning & Zoning Office
10. If yes to No. 9, have you applied for DRB approval? Yes No
11. If yes to No. 10, do you have conditional approval from the DRB? Yes No
(If yes, please supply a copy of the facts & findings)
As required by the Water & Wastewater Ordinances, the following information must be submitted with this request:
1. A Registered Professional Engineer’s (RPE’s) calculations for the water/wastewater volume, including
peak, maximum and average day flow rate, wastewater strength and any other characteristics determined to
be appropriate by the Water & Wastewater Department. RPE calculations are not required for individual
single family dwelling/unit requests and residential requests less than 1000 gallons per day, as determined
by the Water & Wastewater Department.
I/We certify that the calculations and information above is correct to the best of my/our knowledge:
Calculated By: 20
(Engineer Signature)
_____________________________________________
(Engineer Print)
Applicant: 20
(Applicant Signature)
________________________________________________
(Applicant Print)
I/We authorize the above applicant and engineer to act on our behalf:
Property Owner: 20