Page 1 of 3
Adams Canyon Sewer System Connection Application
Resolution 2016-003 / Effective January 19, 2016
ADAMS CANYON SEWER SYSTEM CONNECTION (ACS)
PERMIT APPLICATION
Planning & Development Department
Building Division
PO Bo 1727
Jackson, WY 83001
ph: (307) 733-7030 BUILDING DEPT.
ph. (307) 733-3317 ENGINEERING DEPT.
www.tetonwyo.org
Instructions: Please complete all sections of this application. If there are any questions, please call the Engineering
Department office at (307.733.3317)
Please deliver the following to the County Building Department:
1. This completed Connection Permit Application.
2. 3 sets of site plans and floor plans (11” X 17”). (1 set for Town of Jackson, 1 set for Teton County, 1 set for return to
applicant). These plans shall include mechanical water and sewer plans showing the location and type of all service
lines, plumbing fixtures, water meters, and backwater valves, all grease traps, grease or sand/oil interceptors, a
nd
pre-treatment facilities (if applicable). Floor plans for all levels shall be included. PLEASE INCLUDE ANY APPLICABLE
TOWN OF JACKSON STANDARD DETAILS AS APPROPRIATE FOR THE CONNECTION. All Work must be done i
n
accordance with the Town of Jackson standards and Teton County Adams Canyon Sewer Rules and Regulations
(Resolution 2016-003).
3. A nonrefundable Application Fee of One Hundred ($100.00) Dollars.
Please comply with the following coordination process for permit processing:
1. Submit to the Teton County Building Department a completed Adams Canyon Sewer Connection Permit Application
and a non-refundable application fee of One Hundred ($100.00) Dollars. If deemed complete, the permit
paperwork will be forwarded to the Town of Jackson Engineering Department for their review.
2. All sewer use must be metered and all meters must be supplied by the Town of Jackson. If you need a meter, please
complete a Water Meter Purchase Agreement, available from the Town of Jackson.
3. When contacted by the Town of Jackson Engineering Department, sign the “Wastewater Treatment Facilities
Connection and Use Agreement”, pay the Town of Jackson Wastewater Capacity Fee, pick up approved permit
paperwork and receipt of payment. The Town of Jackson shall email confirmation of calculated Equivalent
Residential Units (ERUs), and confirmation of all permits approved and fees paid to Teton County Engineering and
Building Department staff.
4. When contacted by the Teton County Building Department, pay the Teton County Adams Canyon Sewer Syst
em
C
onnection and Use Permit fees and pick up the approved permit.
5. Construction inspection is required by Teton County Engineering. Call Gabe Klamer 732-8581 to schedule.
Fees Paid ______________
C
heck No
. ______________ Credit Card ______________ Cash ___________
ACS ____________ BDC/BDR