Planning & Inspections Department
811 Texas | P.O. Box 1890 | El Paso, Texas 79950-1890| (915) 212-0085
5-DAY REVIEW APPLICATION
(Subdivision and Land Study use)
DATE: FILE NO. .
Type of Application (Select One):
Amending Major Preliminary Major Final Major Combination Minor
Resubdivision Preliminary Resubdivision Final Resubdivision Combination Land Study
SUBDIVISION or LAND STUDY NAME:
.
1. Property Legal Description (Tract, Block, Grant, etc.)
.
.
.
2. Property Land Uses:
ACRES SITES ACRES SITES
Single-family Office .
Duplex Street & Alley .
Apartment Ponding & Drainage .
Mobile Home Institutional .
P.U.D. Other (specify below)
Park .
School .
Commercial Total No. Sites .
Industrial Total (Gross) Acreage .
3. What is existing zoning of the above described property? Proposed zoning? .
4. Will the residential sites, as proposed, permit development in full compliance with all zoning requirements of the
existing residential zone(s)? Yes No
5. What type of utility easements are proposed: Underground Overhead Combination of Both
6. What type of drainage is proposed? (If applicable, list more than one)
.
.
7. Are special public improvements proposed in connection with development? Yes No
8. Is a modification or exception of any portion of the Subdivision Ordinance proposed? Yes No
If answer is “Yes”, please explain the nature of the modification or exception
9. Remarks and/or explanation of special circumstances:____________________________________________________
.
10. Improvement Plans submitted? Yes No
11. Will the proposed subdivision require the city to review and decide whether this application is subject to the standards
in effect prior to the effective date of the current applicable standards? Yes No
If yes, please submit a vested rights petition in accordance with Title I (General Provisions) Chapter 1.04 - Vested Rights
Planning & Inspections Department
811 Texas | P.O. Box 1890 | El Paso, Texas 79950-1890| (915) 212-0085
5-DAY REVIEW APPLICATION
(Right-of-Way and Easement Vacations and Dedications use)
DATE: FILE NO.
1. Type of Application (Select One):
Right-of-Way Vacation Easement Vacation Right-of-Way Dedication Easement Dedication
2. Request is hereby made to vacate or dedicate the following: (Select one)
Street Alley Easement Other
Street Name(s) ______________________________ Subdivision Name__________________________________
Abutting Blocks_____________________________ Abutting Lots______________________________________
3. Reason for vacation or dedication request: __________________________________________________________
____________________________________________________________________________________________
4. Surface Improvements located in subject property to be vacated:
None Paving Curb & Gutter Power Lines/Poles Fences/Walls Structures Other
5. Underground Improvements located in the existing rights-of-way:
None Telephone Electric Gas Water Sewer Storm Drain Other
6. Future use of the vacated right-of-way:
Yards Parking Expand Building Area Replat with abutting Land Other
7. Related Applications which are pending (give name or file number):
Zoning Board of Adjustment Subdivision Building Permits Other
Planning & Inspections Department
811 Texas | P.O. Box 1890 | El Paso, Texas 79950-1890| (915) 212-0085
Owner of record .
(Name & Address) (Zip) (Phone)
Developer .
(Name & Address) (Zip) (Phone)
Engineer .
(Name & Address) (Zip) (Phone)
NOTE:
SUBMITTAL OF AN APPLICATION DOES NOT CONSTITUTE ACCEPTANCE FOR PROCESSING UNTIL
THE PLANNING DEPARTMENT REVIEWS THE APPLICATION FOR ACCURACY AND COMPLETENESS.
Planning & Inspections Department
811 Texas | P.O. Box 1890 | El Paso, Texas 79950-1890| (915) 212-0085
REQUIRED DOCUMENTATION FOR
5-DAY REVIEWAPPLICATION
The purpose of a 5-day review request is to assure that the subdivision application is consistent with all
standards of the Subdivision Code, and to provide to the applicant a determination of completeness. If
the application is determined to be incomplete, the notification shall specify the documents or other
information needed to complete the application prior to the submittal of a paid application.
REQUIREMENTS:
APPLICATION Each item on this application shall be completed and all documentation required
on this form shall be submitted before this application is accepted for processing. Submittal of an
application does not constitute acceptance for processing until the Department reviews the application
for accuracy and completeness.
RELEVANT PLATS, LAND STUDY, OR SURVEY/METES AND BOUNDS If submitting
electronically, include one (1) PDF copy. If submitting paper, include nine (9) sets of copy.
The following items shall be submitted when applicable.
VESTING APPLICATION Required when the applicant requests that the application be subject
to standards in effect prior to the effective date of the current applicable standards (No. 11 on
application). A vested rights petition in accordance with Section 1.04.070 Vesting of projects shall
be submitted.
WAIVERS, EXCEPTIONS OR MODIFICATIONS Required when any development standard
deviates from or does not comply with code regulations.