SPECIFICATION SUBMITTAL
369423g 1 06.04.19
Centralized Control EquipmentLight Management Hub (QP3)
Quantum Select
Quantum Light Management Hub (QP3)
for Quantum Select
The Quantum Light Management Hub (QP3) connects
Lutron QS devices, Lutron power panels and DMX-512
devices to your Quantum lighting control system.
Features
• Designed to control, manage, and monitor Lutron
Energi Savr Node units, Lutron power panels, GRAFIK
Eye QS units, Sivoia QS shade / drapery systems and
DMX-512 devices.
• The small size of 9.25 in x 3.16 in x 13.25 in (235 mm
x 80.3 mm x 337 mm) allows almost any space to be
enhanced with Quantum light management.
• Supports both astronomic and time-of-day events to
automatically control the lights and shades / draperies in
the system.
• Simple reconfiguration of a space without rewiring.
• Individually control, monitor, and adjust any light or
shade / drapery in a space.
• Can be connected to other Quantum Light
Management Hubs.
• Enables a Quantum system to cost-effectively scale
from a single floor, to multiple floors, to whole building
and to whole campus.
Panel Capabilities
• Each Quantum Light Management Hub (QP3)
has 2 links that can be individually configured to
communicate with:
– Lutron power panels
– Lutron QS devices
DMX-512 devices for lighting zones
(use QSE-CI-DMX for DMX integration zones)
QP3-1PL-100-240
Type 1
Enclosure
Input:
1 A 120-240 V~ 50/60 Hz
Output:
2 A 24 V --- (IEC PELV/NECR Class 2)
Entree:
1 A 120-240 V~ 50/60 Hz
Sortie:
2 A 24 V --- (IEC PELV/NECR Class 2)
Entrada:
1 A 120-240 V~ 50/60 Hz
Salida:
2 A 24 V --- (IEC PELV/NECR Class 2)
DMX-In DMX-Out QS Panel DBI
DMX-In
DMX-Out
QS
Panel
DBI
Allowed combinations of links a single processor:
1
®
Job Name:
Job Number:
Model Numbers:
Page
SPECIFICATION SUBMITTAL
369423g 2 06.04.19
Centralized Control EquipmentLight Management Hub (QP3)
Quantum Select
Specifications
Regulatory Approvals
• ULR
cULR
• CE
• NOM dictum per NOM-019
Complies with requirements for use in other spaces
used for environmental air (plenums) per
NECR 2014 300.22(C)(3)
Meets the Canadian National Building Code plenum
requirements for a concealed space used as a plenum
within a floor or roof assembly
Power
• Input voltage: 120–240 V~ 1 A
normal/emergency feed*
50 / 60 Hz
• Output: Processor: 24 V- 2 A
Physical Design
• Enclosure: L: 9.25 in (235 mm)
W: 3.16 in (80.3 mm)
H: 13.25 in (337 mm)
• Weight: 11 lb (4.9 kg)
• NEMA Type 1, IP-20 protection
Performance
• ± 6 kV surge protection (ANSI / IEEE C62.41-1991)
Mounting
• Surface-mount only
Environment
• For indoor use only
• 32 ºF to 104 ºF (0 ºC to 40 ºC)
• Relative humidity less than 90% non-condensing
Available Models
• QP3-1PL-100-240
* Emergency feed is recommended so that the system status can be monitored during an emergency event. If this is not required, normal
power can be used.
2
®
Job Name:
Job Number:
Model Numbers:
Page
SPECIFICATION SUBMITTAL
369423g 3 06.04.19
Centralized Control EquipmentLight Management Hub (QP3)
Quantum Select
Dimensions
Shown as in (mm)
11.25
(285.75)
10.25
(260.35)
0.20 (5.16)
dia.
0.95
(24.13)
1.50
(38.10)
2.13
(54.10)
1.50
(38.10)
1.41
(35.81)
1.80
(45.72)
1.03
(26.16)
0.83
(21.08)
1.41
(35.81)
1.62
(41.15)
9.25
(234.95)
7.50
(190.50)
3.16
(80.26)
13.25
(336.55)
3
®
Job Name:
Job Number:
Model Numbers:
Page
SPECIFICATION SUBMITTAL
369423g 4 06.04.19
Centralized Control EquipmentLight Management Hub (QP3)
Quantum Select
Mounting and Conduit Entry
• Surface mount indoors.
• Panel generates heat, maximum 255 BTUs / h. Mount only where temperature will be
32 ˚F to 104 ˚F (0 ˚C to 40 ˚C).
• Water damages equipment. Mount in a location where the panel and processors will not get wet.
• Mount in an accessible and serviceable location.
An outlet must be installed within 6 ft (1.8 m) of the panel for servicing. Outlet should not be on the same circuit as
the panel.
• A Light Management Hub (QP3) may be mounted above, below, or beside another Light Management Hub
(QP3). Maintain at least 5 in (127 mm) of spacing between installed panel and other equipment, and follow NECR
guidelines for minimum conduit bend radii.
500-10561 Rev. B
L1
5 4 3 2 1
COM
V+
MUX
MUX
D
5 4 3 2 1
COM
V+
MUX
HOTNEUTRAL GROUND
MUX
D
L2
10/100
1 2
COM
P
3 4 5
L1
10/100
PWR
24 V
500 mA
L2
24 V
2 A
500-10561 Rev. B
L1
5 4 3 2 1
COM
V+
MUX
MUX
D
5 4 3 2 1
COM
V+
MUX
HOTNEUTRAL GROUND
MUX
D
L2
10/100
1 2
COM
P
3 4 5
L1
10/100
PWR
24 V
500 mA
L2
24 V
2 A
Front View
* Lutron recommends using a dedicated circuit for lighting control devices.
** Emergency feed is recommended so that the system status can be monitored during an emergency event. If this is not required, normal
power can be used.
Side View
Ceiling
Wall
IEC PELV / NECR Class
2 wiring only for control
links and Ethernet
connection
Note: An outletmust be installed
within 6 ft (1.8 m) of the panel.
Outlet should not be on the same
circuit as the panel. Required for
system start-up.
Note: Follow NECR guidelines
for minimum conduit bend radii.
Dedicated feed*
Emergency feed**
Line voltage only
See Feed Requirements below
Alternate IEC
PELV/NECR
Class 2 entry
points
Do not use
these
knockouts
Do not use
these
knockouts
Alternate IEC
PELV / NECR
Class 2 entry
points
Feed Requirements
Note: Maintain at
least 5 in (127 mm)
of spacing between
installed panel and
other equipment.
4
®
Job Name:
Job Number:
Model Numbers:
Page
SPECIFICATION SUBMITTAL
369423g 5 06.04.19
Centralized Control EquipmentLight Management Hub (QP3)
Quantum Select
Panel Overview
500-10561 Rev. B
L1
5 4 3 2 1
COM
V+
MUX
MUX
D
5 4 3 2 1
COM
V+
MUX
HHNNNGG
MUX
D
L2
10/100
1 2
COM
P
3 4 5
L1
10/100
PWR
24 V
500 mA
L2
24 V
2 A
N
N
Field Wiring Side (Line Voltage Input)
Processor
Service
port
Configurable links, IEC PELV/NECR Class 2
Ethernet port
5
®
Job Name:
Job Number:
Model Numbers:
Page
SPECIFICATION SUBMITTAL
369423g 6 06.04.19
Centralized Control EquipmentLight Management Hub (QP3)
Quantum Select
Line Voltage Wiring
Ground/Earth
Notes
• Line voltage must enter panel from top left of enclosure
• Run wiring so line (mains) Class 1 voltage is separate
from IEC PELV/NECR Class 2 wiring
Neutral
Line / Hot
120–240 V~
500-10561 Rev. B
L1
5 4 3 2 1
COM
V+
MUX
MUX
D
5 4 3 2 1
COM
V+
MUX
HHNNNGG
MUX
D
L2
10/100
1 2
COM
P
3 4 5
L1
10/100
PWR
24 V
500 mA
L2
24 V
2 A
N
N
N
500-10561 Rev. B
L1
5 4 3 2 1
COM
V+
MUX
MUX
D
5 4 3 2 1
COM
V+
MUX
HHNNNGG
MUX
D
L2
10/100
1 2
COM
P
3 4 5
L1
10/100
PWR
24 V
500 mA
L2
24 V
2 A
N
N
N
6
®
Job Name:
Job Number:
Model Numbers:
Page
SPECIFICATION SUBMITTAL
369423g 7 06.04.19
Centralized Control EquipmentLight Management Hub (QP3)
Quantum Select
Quantum Inter-Processor Link Wiring
Notes
• The inter-processor wiring is considered
IEC PELV/NECR Class 2; do not run in the same
conduit as line (mains) voltage wiring.
• Interprocess communication uses a standard
Ethernet connection. All wiring must comply with
IEEE 802.3 standards and must support Any-Source
Multicast communication.
• Processors cannot be daisy chained. Each must be
connected to an Ethernet switch.
• Wiring distance for any single "wire segment"* is
330 ft (100 m) max; use unmanaged Ethernet
switches for longer distances.
• Processors cannot be more than 6 “wire segments”
from the server.
• A dedicated network or VLAN is recommended for
the lighting control system.
• For more information about connecting a Quantum
system to a corporate or building wide network,
please refer to the Quantum IT Guide (P/N 040423) at
www.lutron.com/ITGuide
* A wire segment is a length of cable connecting two
devices communicating over Ethernet.
Example of Inter-Processor Wiring: Riser Diagram
Quantum
Light
Management
Hub (QP3)
Quantum
Light
Management
Hub (QP2)
Quantum
Light
Management
Hub (QP2)
Quantum
Light
Management
Hub (QP3)
Quantum
Light
Management
Hub (QP3)
Quantum
Light
Management
Hub (QP3)
Quantum server
(optional)
Unmanaged Ethernet
switch (not provided
by Lutron)
Ethernet
ports
500-10561 Rev. B
L1
5 4 3 2 1
COM
V+
MUX
MUX
D
5 4 3 2 1
COM
V+
MUX
HHNNNGG
MUX
D
L2
10/100
1 2
COM
P
3 4 5
L1
10/100
PWR
24 V
500 mA
L2
24 V
2 A
N
N
N
This panel is four
"wire segments"
from the Quantum
server.
1
2
3
4
One "wire
segment"
7
®
Job Name:
Job Number:
Model Numbers:
Page
SPECIFICATION SUBMITTAL
369423g 8 06.04.19
Centralized Control EquipmentLight Management Hub (QP3)
Quantum Select
Configurable Link Wiring: Power Panel Link
5 4 3 2 1
DRAIN
MUX
MUX
V+
COM
Link
terminator
(LT-1)
Control wiring
(1) 12 AWG
(2.5 mm
2
)
1: Common
Data link
(1) shielded, twisted pair
22 AWG (0.5 mm
2
)
3: MUX
4: MUX
D: Drain wire in shield (keep away
from ground and all electronics)
Power panel
1 COM
2 N/C
3 MUX
4 MUX
D DRAIN
5 SENSE
Power panel
1 COM
2 N/C
3 MUX
4 MUX
D DRAIN
5 SENSE
Power panel
1 COM
2 N/C
3 MUX
4 MUX
D DRAIN
5 SENSE
4 3 3 4
Link
terminator
(LT-1)
Emergency/essential
sense line
(1) 18 AWG (1.0 mm
2
)
5: Sense line
Sense line is used when there
is a panel being supplied by an
emergency/essential feed
Data A OK
Data B OK
Power OK
12345D
C
D
A B
Common
24VFW
MUX
MUX
Drain
Sense
Comm
Drain
MUX
MUX
C
1
234
D
5
D
Link Link
S
ELECT
C
IRCUIT
Data link: twisted,
shielded pair
22 AWG (1.0 mm
2
)
3: MUX
4: MUX
Drain
(2) 12 AWG
(2.5 mm
2
)
Notes
• Power panel link must be daisy-chained (no T-taps).
• Maximum of 32 circuit selectors per link or
512switch legs (controllable outputs) per link.
• It is not necessary to have the Quantum panel at
the end of the link (it may be in the middle).
• The sense wire (terminal 5) is used whenever there
is a panel being supplied by an emergency/essential
feed; see power panel instructions for details.
• Each low-voltage IEC PELV/NECR Class 2 terminal
can accept only two 18 AWG (1.0 mm
2
) wires or
one 12 AWG to 22 AWG (2.5 mm
2
to 0.5 mm
2
)
wire. Connect as shown using appropriate wire
connectors.
Circuit Selector Wiring
• Total length of control link may be no more than
2000 ft (600 m). Lutron model: MX-RPTR can be
used to extend the link beyond 2000 ft (610 m).
Contact Lutron for more information.
• GRX-CBL-46L wiring cable is available from Lutron
and contains two 12 AWG (2.5 mm
2
) conductors
for control power, one twisted, shielded pair of
22 AWG (0.5 mm
2
) for data link, and one 18 AWG
(1.0 mm
2
) conductor for emergency (essential)
sense line.
Sense: 18 AWG (1.0 mm
2
)
500-10561 Rev. B
L1
5 4 3 2 1
COM
V+
MUX
MUX
D
5 4 3 2 1
COM
V+
MUX
HHNNNGG
MUX
D
L2
10/100
1 2
COM
P
3 4 5
L1
10/100
PWR
24 V
500 mA
L2
24 V
2 A
N
N
N
Power Links
8
®
Job Name:
Job Number:
Model Numbers:
Page
SPECIFICATION SUBMITTAL
369423g 9 06.04.19
Centralized Control EquipmentLight Management Hub (QP3)
Quantum Select
Configurable Link Wiring: QS Link
Notes
System communication uses IEC PELV/NECR Class 2
low-voltage wiring.
• Follow all local and national electrical codes when
installing IEC PELV/NECR Class 2 wiring with line
voltage/mains wiring.
• Each terminal accepts two 22 AWG – 18 AWG
(0,5 mm² – 1.0 mm²) wires or one 22 AWG –12 AWG
(0.5 mm² – 4.0 mm²) wire.
Make all connections inside the control unit’s wallbox.
• A Quantum QS link can have up to 512 switch legs
(controllable outputs) and 99 Lutron QS devices.
Refer to the QS Link Power Draw Units Specification
Submittal (Lutron P/N 369405) at www.lutron.com
and the table above for information concerning
Power Draw Units (PDUs).
• QS link wiring can be T-tapped or daisy-chained.
500-10561 Rev. B
L1
5 4 3 2 1
COM
V+
MUX
MUX
D
5 4 3 2 1
COM
V+
MUX
HHNNNGG
MUX
D
L2
10/100
1 2
COM
P
3 4 5
L1
10/100
PWR
24 V
500 mA
L2
24 V
2 A
N
N
N
500-10561 Rev. B
L1
5 4 3 2 1
COM
V+
MUX
MUX
D
5 4 3 2 1
COM
V+
MUX
HHNNNGG
MUX
D
L2
10/100
1 2
COM
P
3 4 5
L1
10/100
PWR
24 V
500 mA
L2
24 V
2 A
N
N
N
(5) Drain (Shield)
(4) _
(3) MUX
(2) 24 V-
(1) COM
QS Link Wiring:
22AWG to 12AWG
(0.5mm( to 4.0mm()
Availble Power
Draw Units
(PDUs) per link
Maximum Link
Length
Wire Gauge
Available from Lutron
in one cable
33
500 ft
(152.4 m)
Power (terminals 1 and 2)
1 pair 18 AWG (1.0 mm
2
)
Data (terminals 3 and 4)
1 pair 22 AWG (0.5 mm
2
)
twisted and shielded
GRX-CBL-346S
GRX-PCBL-346S
33
2000 ft
(609.6 m)
Power (terminals 1 and 2)
1 pair 12 AWG (4.0 mm
2
)
Data (terminals 3 and 4)
1 pair 22 AWG (0.5 mm
2
)
twisted and shielded
GRX-CBL-46L
GRX-PCBL-46L
9
®
Job Name:
Job Number:
Model Numbers:
Page
SPECIFICATION SUBMITTAL
369423g 10 06.04.19
Centralized Control EquipmentLight Management Hub (QP3)
Quantum Select
QP3-1PL-100-240
Type 1
Enclosure
Input:
1 A 120-240 V~ 50/60 Hz
Output:
2 A 24 V --- (IEC PELV/NECR Class 2)
Entree:
1 A 120-240 V~ 50/60 Hz
Sortie:
2 A 24 V --- (IEC PELV/NECR Class 2)
Entrada:
1 A 120-240 V~ 50/60 Hz
Salida:
2 A 24 V --- (IEC PELV/NECR Class 2)
QP3-1PL-100-240
Type 1
Enclosure
Input:
1 A 120-240 V~ 50/60 Hz
Output:
2 A 24 V --- (IEC PELV/NECR Class 2)
Entree:
1 A 120-240 V~ 50/60 Hz
Sortie:
2 A 24 V --- (IEC PELV/NECR Class 2)
Entrada:
1 A 120-240 V~ 50/60 Hz
Salida:
2 A 24 V --- (IEC PELV/NECR Class 2)
+
Configurable Link Wiring: QS Link
Only terminals 1, 3, and 4 connected
between devices that supply PDUs
Terminal 2 NEVER
connected between devices
that supply PDUs
Devices that
supply PDUs
Devices that
consume PDUs
COM
+24 V
MUX
MUX
COM
MUX
MUX
Quantum
Light
Management
Hub (QP3)
Quantum
Light
Management
Hub (QP3)
QS Device
Interface
QS Device
Interface
QSM
QSMQSM
Wired QS
Keypad
Wired QS
Keypad
Wired QS
Keypad
Wired QS
Keypad
Step-PS
QS Link
power
supply
QS link;
no terminal 2
QS link; all 4 terminals
QS link; all 4 terminals
QS link;
all 4
terminals
Terminal 2 (+24 V)
NEVER connected*
**
All 4 terminals connected to QS link
devices that consume PDUs
QS Link Wiring Rules
* Terminal 2 (+24 V) should NEVER be connected between devices that supply PDUs.
** For QS Link power supply wiring connection details, refer to the installation instructions for the
specific power supply model being used.
Interprocessor
wiring
Unmanaged Ethernet
switch (not provided by
Lutron)
10
®
Job Name:
Job Number:
Model Numbers:
Page
SPECIFICATION SUBMITTAL
369423g 11 06.04.19
Centralized Control EquipmentLight Management Hub (QP3)
Quantum Select
Configurable Link Wiring: DMX512
DMX512 Output Wiring Example
5 4 3 2 1
DRAIN
MUX
MUX
V+
COM
Link
terminator
(LT-1)
DMX512
Controllable
Device
COMMON
DATA +
DATA -
DMX512
Controllable
Device
COMMON
DATA +
DATA -
DMX512
Controllable
Device
COMMON
DATA +
DATA -
4 3 3 4
Link
terminator
(LT-1)
Link
terminator
(LT-1)
Link
terminator
(LT-1)
500-10561 Rev. B
L1
5 4 3 2 1
COM
V+
MUX
MUX
D
5 4 3 2 1
COM
V+
MUX
HHNNNGG
MUX
D
L2
10/100
1 2
COM
P
3 4 5
L1
10/100
PWR
24 V
500 mA
L2
24 V
2 A
N
N
N
500-10561 Rev. B
L1
5 4 3 2 1
COM
V+
MUX
MUX
D
5 4 3 2 1
COM
V+
MUX
HHNNNGG
MUX
D
L2
10/100
1 2
COM
P
3 4 5
L1
10/100
PWR
24 V
500 mA
L2
24 V
2 A
N
N
N
(2) Configurable Links
DMX512 Lighting Control Console
(not provided by Lutron)
Lutron DMX512 Input
Jack model:
NT-DMXJ-IN
DMX512 Cable
(see table on next page)
DMX Patch Cable
(not provided by Lutron)
DMX512 Input Wiring Example
(2) Configurable Links
5 4 3 2 1
DRAIN
MUX
MUX
V+
COM
4 3
43
11
®
Job Name:
Job Number:
Model Numbers:
Page
SPECIFICATION SUBMITTAL
369423g 12 06.04.19
Centralized Control EquipmentLight Management Hub (QP3)
Quantum Select
Notes
• Installation and all devices must comply with the
ANSI E1.11-2008, USITT DMX512-A standard.
• Below are a few Important points from the standard:
All DMX512 devices in a DMX512 universe must be
wired in a daisy-chain configuration.
Total length of the link wiring for one DMX512
universe must not exceed 1300 ft (400 m). DMX
repeaters or splitters can be used to extend the
link. All repeaters must comply with the standard.
The repeater manufacturer’s guidelines must be
followed.
All cable used must comply with the standard.
Lutron models GRX-CBL-DMX-250 and
GRX-CLB-DMX-500 comply with the standard and
are recommended.
DMX512 link terminators must be installed at both
ends of the DMX512 link. Lutron model LT-1A link
terminators are included with the panel and are
recommended. Note that some DMX512 devices
have built-in link terminators.
A maximum of (31) DMX512 devices can be
directly connected to the DMX512 controller. If
(32) or more devices are required, DMX512
repeaters or splitters must be used. A repeater or
splitter is needed so that no more than (32) devices
are directly connected on the same wire segment.
Note that link terminators are required at the
beginning and end of every wire segment.
• The Quantum processor can be programmed to
either control DMX512 devices (DMX512 output) or
to receive DMX512 signals from a DMX512 controller
(DMX512 input) such as a theatrical stage board.
All wiring must be low-voltage IEC PELV/NECR Class
2 wiring. Each terminals of the Lutron processor can
accept only stranded wire, and either (1 or 2)
22–18 AWG (0.5 mm² – 1.0 mm²) conductors or
(1) 16–12 AWG (1.5 mm² – 2.5 mm²).
• The Quantum processor can be at the end or in the
middle of the DMX512 link. The link terminators must
always be installed at the ends of the link.
• Only one link of the processor can be configured as
a DMX512 link. The other link of the processor must
be configured as a QS link.
• DMX512 devices must be addressed prior to
commissioning of the system. A schedule of
the DMX devices and their addresses must be
supplied to the Lutron project manager prior to
commissioning. Lutron is not responsible for the
addressing of the DMX512 devices.
• Refer to the Lutron DMX512 Application Note #592
(P/N 048592) at www.lutron.com for information on
the different DMX512 applications that Lutron can
provide.
Configurable Link Wiring: DMX512 (continued)
DMX Cable Wiring Table
This table shows examples of some Manufacturers of DMX512
cable and how they should be terminated.
DMX512 Cable Type Wire
From
Circuit
Selector
To DMX512 Jack
Belden 9729/89729
(2) drain/shield C C (1) (white/black)
black + – (2) (red)
white + (3) (yellow)
black No Connect – (4) (blue)
red No Connect + (5) (black)
Duraflex 22/4WS
or Lutron
GRX-CBL-DMX-250/500
(2) drain/shield C C (1) (white/black)
white + – (2) (red)
black + (3) (yellow)
green No Connect – (4) (blue)
red No Connect + (5) (black)
)Lutron, Lutron, Energi Savr Node, GRAFIK Eye, Sivoia, and Quantum are
trademarks or registered trademarks of Lutron Electronics Co., Inc. in the US
and/or other countries.
NEC is a registered trademark of National Fire Protection Association, Quincy,
Massachusetts.
UL is a trademark of UL LLC.