APPLICATION FOR CITY OF MURRAY, KENTUCKY PERMIT NO._________
LAND DISTURBANCE PERMIT OFFICE OF STORMWATER MANAGEMENT
I. LOCATION OF PROJECT NAME________________________________________________________
BUILDING LOCATION_____________________________________________________________
OWNER_________________________________ADDRESS_____________________
IMPORTANT - Applicant to complete all items
1. The size, finished and existing slope, and location of any cuts or fills.
___________________________________________________________________________________________________
___________________________________________________________________________________________________
___________________________________________________________________________________________________
2. A general description of the predominant soil types to be disturbed as indicated by the area soil
and water conservation district or other reliable resources.
___________________________________________________________________________________________________
___________________________________________________________________________________________________
___________________________________________________________________________________________________
3. The general location and size of the land area to be disturbed and the extent to which the
vegetation and topsoil will be removed.
__________________________________________________________________________________________________
__________________________________________________________________________________________________
__________________________________________________________________________________________________
4. The general location, volume and type of soil or other materials to be used for fill in areas other
than the roadway.
__________________________________________________________________________________________________
__________________________________________________________________________________________________
__________________________________________________________________________________________________
5. Location and description of existing natural features on the site such as contours, vegetation,
streams, and all other drainage.
__________________________________________________________________________________________________
__________________________________________________________________________________________________
__________________________________________________________________________________________________
6. Measures that will be taken to contain the sedimentation to the subject property, both during
an after construction.
__________________________________________________________________________________________________
__________________________________________________________________________________________________
__________________________________________________________________________________________________
7. Best Management Practices that will be installed to promote Stormwater Quality during and after construction
__________________________________________________________________________________________________
__________________________________________________________________________________________________
__________________________________________________________________________________________________